Permit #2020020134

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00450-0130
CONDITIONED SPACE: 1921 sqft
GARAGE: 701 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
Total Square Footage: 2846 sqft
Block: 00450
Subdivision: -
Job Phone: (386)437-1508
Location Address: 30 SEAMAIDEN PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/27/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X LLC

Address

29 COLUMBUS COURT

PALM COAST, FL 32137

Lot: 0130
Contracted Stated Job Value: ¤160,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 08/18/2020 APPROVED MBACON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION call in cross connection with utility final at the end of project.
BLD - BUILDING FINAL 08/14/2020 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION ACCESS NEEDED FOR INSPECTION. PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE
BLD - BUILDING FINAL 08/13/2020 Disapproved - NO FEE FWILLIS
Note: ACCESS NEEDED FOR INSPECTION. PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE
U -UTILITY RESIDENTIAL FINAL 08/13/2020 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 08/12/2020 FINAL APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) 08/12/2020 APPROVED KHOWELL
ROW FIELD SURVEY /GRADING CERTIFICATION 07/27/2020 APPROVED - AS NOTED KHOWELL
Note: CALL UTILITY DEPARTMENT AND HAVE THE PEP LID RAISED UP AT LEAST 6"
FINAL SURVEY (OFFICE USE ONLY) 07/27/2020 APPROVED KHOWELL
ELECTRIC - EARLY POWER 07/06/2020 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 07/02/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:00
ROW- PRE-APRON (PRE-POUR) 06/25/2020 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 06/23/2020 Disapproved - NO FEE KHOWELL
Note: MITERED END SECTIONS ARE TO LONG, THE ALLOWED MAXIMUM IS 5' TO THE END OF THE PIPE FROM THE THE EDGE OF DRIVEWAY. 5" MINIMUM THICK CONCRETE REQUIRED IN THE R.O.W. ON GARAGE SIDE OF PIPE APRON IS FINE THE WAY IT IS. 4” MINIMUM THICK CONCRETE REQUIRED ABOVE THE R.O.W.
U-CROSS CONNECTION 06/23/2020 CANCELLED BY APPLICANT AHALL
Note: THIS IS A REINSPECTION call in cross connection with utility final at the end of project.
U - SEWER TIE IN 06/09/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION P-2503.2 CONCEALMENT UNCOVER AT PEP TANK FOR INSPECTION
GRAVITY SEWER TEST 06/09/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION P-2503.2 CONCEALMENT UNCOVER PIPE FOR INSPECTION
GRAVITY SEWER TEST 06/08/2020 Disapproved -FEE REQUIRED JGIBSON
Note: P-2503.2 CONCEALMENT UNCOVER PIPE FOR INSPECTION
U - SEWER TIE IN 06/08/2020 Disapproved - NO FEE JGIBSON
Note: P-2503.2 CONCEALMENT UNCOVER AT PEP TANK FOR INSPECTION
U-CROSS CONNECTION 06/08/2020 CANCELLED BY APPLICANT AHALL
Note: call in reuse cross connection with utility final at the end of project.
PEP TANK INSTALLATION REQUEST 05/27/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 05/12/2020 APPROVED FWILLIS
INSULATION 05/11/2020 APPROVED FWILLIS
ALL ROUGH 05/07/2020 APPROVED FWILLIS
ALL ROUGH 05/06/2020 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/27/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION 4X4 Post missing as highlighted on approved drawings. Did not see the DETAIL SHEET for BEARING WALLS. Inspection stopped.
ROOF VALLEY & METAL 04/27/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2020 Disapproved - NO FEE FWILLIS
Note: 4X4 Post missing as highlighted on approved drawings. Did not see the DETAIL SHEET for BEARING WALLS. Inspection stopped.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2020 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 04/09/2020 APPROVED TBAKER
TIE BEAM / LINTEL 04/08/2020 APPROVED WMILLER
MONOLITHIC SLAB 03/18/2020 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 03/16/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 03/02/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 05/28/2020 05/28/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 04/08/2020 04/09/2020
Note: Released By: TBAKER
MECH COMPLETE 02/26/2020 02/26/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 02/26/2020 02/27/2020
Note: Released By: JPI
PLUM HOLD 02/18/2020 02/20/2020
Note: Held By: JPI 1. Repeat comment. Please submit the plumbing riser diagram. The review will continue upon submittal of the same.
BLD COMPLETE 02/18/2020 02/20/2020
Note: Released By: JPI
ZON COMPLETE 02/18/2020 02/19/2020
Note: Released By: AMOBLEY
MECH HOLD 02/18/2020 02/18/2020
Note: Held By: CPISCITELLI Energy Calc needs to be signed by the builder. (second request)
SW1 COMPLETE 02/18/2020 02/24/2020
Note: Released By: CTROHA
SWALE COMPLETE 02/12/2020 02/24/2020
Note: Released By: TBAKER
BLD HOLD 02/05/2020 02/14/2020
Note: Held By: JPI 1. Please provide the product approval information for the soffits and items not currently listed on the product approval worksheet.
CUSVC COMPLETE 02/05/2020 02/06/2020
Note: Released By: HHAND
ELEC COMPLETE 02/05/2020 02/06/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 02/05/2020 02/12/2020
Note: Released By: TBAKER
LOCATE COMPLETE 02/05/2020 02/06/2020
Note: Released By: CSTONE
MECH HOLD 02/05/2020 02/06/2020
Note: Held By: CPISCITELLI 1. Provide duct layout and heatload showing equipment information 2. Energy calcs and EPL card need to be signed by the builder
PLUM HOLD 02/05/2020 02/14/2020
Note: Held By: JPI 1. Please submit the plumbing riser diagram. The review will continue upon submittal of the same.
SW1 HOLD 02/05/2020 02/10/2020
Note: Held By: MMAJEWSKI APPLICANT MUST MATCH EXISTING ELEVATIONS AT THE PROPERTY LINE OF IMPROVED LOTS AND SHOW PROPOSED DRAINAGE CONVEYANCE INSIDE THE PROPERTY LINE.
UD1 COMPLETE 02/05/2020 02/10/2020
Note: Released By: LFITZGERALD
ZON HOLD 02/05/2020 02/06/2020
Note: Held By: AMOBLEY This lot requires a total of 6 trees. One more tree required Shrubs must wrap the right corner of the garage All windows and doors facing public right of way must have banding. Front windows are missing banding

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/03/2020
NEW RESIDENTIAL INSPECTIONS ¤502.00 02/27/2020
SITE PLAN 20 ¤20.00 02/27/2020
SURCHARGE FS 533.721 ¤11.74 02/27/2020
SURCHARGE - FS 468.631 ¤17.61 02/27/2020
STORM WATER PERMIT FEES ¤80.00 02/27/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 02/27/2020
SEWER CREDIT (¤1,147.00) 02/27/2020
SEWER INSPECTION ¤25.00 02/27/2020
SEWER CAPITAL FACILITY ¤4,596.07 02/27/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 02/27/2020
METER - DEPOSIT ¤60.00 02/27/2020
WATER- TURN ON ¤25.00 02/27/2020
ADMIN FEE ¤20.00 02/27/2020
CONNECTION FEES ¤1,002.88 02/27/2020
ELECTRIC FEE ¤210.60 02/27/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 02/27/2020
IMPACT FEE FIRE ¤223.38 02/27/2020
IMPACT FEE PARKS ¤849.24 02/27/2020
IMPACT FEE SCHOOL ¤3,600.00 02/27/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 02/27/2020
MECHANICAL FEE ¤210.60 02/27/2020
WATER -IRRIGATION INSPECTION ¤25.00 02/27/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 02/27/2020
PLAN CHECK FEE ¤100.40 02/27/2020
PLUMBING FEE ¤210.60 02/27/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,648.90