Permit #2020020146

Permit Details

Status: FINAL

Parcel Id: 02-12-31-0000-01010-0090
Block: 01010
Subdivision: -
Job Phone: 305-799-4886
Location Address: 6255 COLBERT LN
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 11/04/2022
NOC: RECORDED
Applicant name: JOHN EDWARD JAMES
Owner: FAE COLBERT LANE LLC

Address

215 S STATE ST, STE 380

SALT LAKE CITY, UT 84000

Lot: 0090
Job Description: SITE WORK - 16,000 SF OFFICE BUILDING
Type: CN

Contractor

JAMES COMMERCIAL DEVELOPMENT INC
Status Location Address State License Number Phone
ACTIVE

9950 KIRCHHERR

WEST PALM BEACH, FL 33411

CGC1514256 (Exp: 08/31/2026) 305-799-4886

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 10/31/2024 APPROVED DRAMIREZ
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 10/31/2024 APPROVED DRAMIREZ
Note: 10/28/2024 4:30:57 PM- PREVIOUS INSPECTION NOTES Inpsection has been cancelled due to lack of Landscape As-Builts signed and sealed by RLA. Also, 340 or so viburnums appear to not meet he size requirement. Have Project Lanadscape Architect contact City Landscape Architet to discuss Call in for final inspection ONLY after asbuilts have been submitted (uploaded to portal) reviewd and approved. 10/31/2024 As-builts submitted with a Bond
LDSC- LANDSCAPE FINAL 10/31/2024 APPROVED DRAMIREZ
Note: AS-built submitted with a Bond.
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 10/30/2024 APPROVED DRAMIREZ
LDSC-IRRIGATION FINAL 10/28/2024 CANCELLED BY APPLICANT RPICATAGI
Note: Applicant must submit Irrigation As-Builts signed and sealed by RLA Prior to Final Irrigation Inspection
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 10/28/2024 CANCELLED BY APPLICANT RPICATAGI
Note: Inpsection has been cancelled due to lack of Landscape As-Builts signed and sealed by RLA. Also, 340 or so viburnums appear to not meet he size requirement. Have Project Lanadscape Architect contact City Landscape Architet to discuss Call in for final inspection ONLY after asbuilts have been submitted (uploaded to portal) reviewd and approved.
UC-FINAL SITE INSPECTION 10/28/2024 FINAL APPROVED LFITZGERALD
FIRE HYDRANT LOCATION AND FLOW TEST 10/24/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/24/2024 4:47:43 PM *** flows ranged from 1000-1200 gal/min,lower than usual and per Randy holmes possible thay water plants throtled down pressures befor the storm and not yet back to normal operating pressures-Randy was not overly concerned;i tried contacting Ryan-water plant operations manager but no answer
UC-SUBSTANTIAL WALK-THRU 10/24/2024 APPROVED LFITZGERALD
UC- PRELIMINARY AS-BUILTS 10/24/2024 APPROVED LFITZGERALD
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/23/2024 APPROVED AWATERS
BLD- ADA PARKING 10/23/2024 APPROVED AWATERS
BLD- ADA SIGNAGECONTROL 10/23/2024 APPROVED AWATERS
LDSC-TREE BARRICADE 10/22/2024 APPROVED RPICATAGI
LDSC-PRE-PLANTING TREE QUALITY 10/22/2024 APPROVED RPICATAGI
ELECTRIC FINAL 10/22/2024 APPROVED RMARTIN
U-WATER METER INSTALLATION/VERIFICATION 10/21/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/21/2024 10:53:35 AM *** yes both potable/fire detector with noah and lucas
UROW-RETENT/DETENT STABILI 10/21/2024 APPROVED LFITZGERALD
UROW -FINAL GRADE PRIOR SOD 10/17/2024 FINAL APPROVED LFITZGERALD
UROW - FINAL DRAINAGE 10/17/2024 FINAL APPROVED LFITZGERALD
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 10/17/2024 FINAL APPROVED LFITZGERALD
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/17/2024 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9015 *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:14:05 AM *** water into building satisfactory
FIRE ACCESS ROAD 10/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:32:17 AM *** Randy per my request made a site visit and approved fire access road and turning radius of parking lot
U - UTILITY COMMERCIAL FINAL 10/03/2024 APPROVED DLEAP
PROJECT CLOSE OUT MEETING (386-986-3750) 09/03/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/3/2024 11:49:41 AM *** meeting with city staff-Dennis,Patrick,Rebecca and only Jerry Barnes-he forgot about this meeting as wll as did not inform personnll on his side but clarifications were done and Jerry seemed to undertand what needed to close out this project
UC-MOT MAINTENANCE OF TRAFFIC 08/01/2024 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9070 *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:11:15 AM *** PRIVATE LS(oil can) started up by pump manufacture reps.-report to be forwarded to utility
UC-ASPHALT PRE PLACEMENT 08/01/2024 APPROVED LFITZGERALD
U-WATER SERVICE INSTALLATION 08/01/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:14:05 AM *** water into building satisfactory
U-PUMP STATION START-UP 08/01/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:11:15 AM *** PRIVATE LS(oil can) started up by pump manufacture reps.-report to be forwarded to utility
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/01/2024 APPROVED LFITZGERALD
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 08/01/2024 APPROVED LFITZGERALD
Note: 6/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:43:42 PM *** now forming/placing sidewalks Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:38:23 PM *** remainde of envirnmental curbing now installed and Dcurb for landscape Inspector Notes from Inspection 9105 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County 5/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
BLD- UNDERGROUND ELEC/GAS 06/14/2024 APPROVED RMARTIN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 06/14/2024 APPROVED RMARTIN
Note: 6/13/2024 - PREVIOUS INSPECTION NOTES
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 06/14/2024 APPROVED RMARTIN
BLD - SITE LIGHTING-POLE SET/FIXTURE 06/14/2024 APPROVED RMARTIN
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 06/14/2024 APPROVED RMARTIN
BLD - SITE LIGHTING EXTERIOR MOUNTED 06/14/2024 APPROVED RMARTIN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 06/13/2024 CANCELLED BY APPLICANT RMARTIN
UC-CONSTRUCTION ENTRANCE 06/07/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County
UROW- CURBING & GUTTER 06/07/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:38:23 PM *** remainde of envirnmental curbing now installed and Dcurb for landscape Inspector Notes from Inspection 9105 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County 5/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 06/07/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:43:42 PM *** now forming/placing sidewalks Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:38:23 PM *** remainde of envirnmental curbing now installed and Dcurb for landscape Inspector Notes from Inspection 9105 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County 5/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
UROW- CURBING & GUTTER 05/29/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
U-GRAVITY SEWER INSTALL/TESTING 05/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
U-PUMP STATION PRE-INSTALLATION 05/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
U-SEWER FORCE MAIN INSTALL/TESTING 05/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange
UC-DRAINAGE STRUCT PLACMNT 02/14/2024 APPROVED JHARDING
UC-CONSTRUCTION ENTRANCE 01/16/2024 CANCELLED BY APPLICANT WEB
Note: 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County
UC-CONSTRUCTION ENTRANCE 03/07/2023 Disapproved - NO FEE JHARDING
Note: Must call the entrance inspection into Flager County
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/07/2023 CANCELLED BY APPLICANT WEB
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/07/2023 APPROVED JHARDING
PLAN - PRE-CON 386-986-3750 11/04/2022 APPROVED - AS NOTED LFITZGERALD
Note: on site meeting with city staff and contractor John James and property owner Jerry

Review History

Department Status Date In Date Out
UD1 COMPLETE 05/04/2020 05/04/2020
Note: Released By: DRAMIREZ Permit hold is on the permit notes.
BLD COMPLETE 02/05/2020 02/11/2020
Note: Released By: PBUCKLEY
ENGIN1 COMPLETE 02/05/2020 02/12/2020
Note: Released By: CMORALES
PLLA COMPLETE 02/05/2020 02/05/2020
Note: Released By: BDAWSON
UD1 HOLD 02/05/2020 02/07/2020
Note: Held By: CJOHNSON Fees, agreements and FDEP permits or Engineers Letter of Determination shall be complete prior to issuance of the Site Development permit

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤62.50) 11/04/2022
ADMINISTRATIVE- SITE DEVELOP ¤125.00 11/04/2022
INSPECTION - GENERAL ¤600.00 11/04/2022
SITE INSPECTION ¤560.00 11/04/2022
SITE PLAN 30 ¤30.00 11/04/2022
Fees Total Due: ¤0.00 Total Paid: ¤1,252.50