Permit #2020020146
Permit Details
Status: FINAL
| Parcel Id: 02-12-31-0000-01010-0090 |
| Block: 01010 |
| Subdivision: - |
| Job Phone: 305-799-4886 |
| Location Address: 6255 COLBERT LN |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 11/04/2022 |
| NOC: RECORDED |
| Applicant name: JOHN EDWARD JAMES |
| Owner: FAE COLBERT LANE LLC |
|
Address 215 S STATE ST, STE 380 SALT LAKE CITY, UT 84000 |
| Lot: 0090 |
| Job Description: SITE WORK - 16,000 SF OFFICE BUILDING |
| Type: CN |
Contractor
JAMES COMMERCIAL DEVELOPMENT INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9950 KIRCHHERR WEST PALM BEACH, FL 33411 |
CGC1514256 (Exp: 08/31/2026) | 305-799-4886 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 10/31/2024 | APPROVED | DRAMIREZ |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 10/31/2024 | APPROVED | DRAMIREZ |
| Note: 10/28/2024 4:30:57 PM- PREVIOUS INSPECTION NOTES Inpsection has been cancelled due to lack of Landscape As-Builts signed and sealed by RLA. Also, 340 or so viburnums appear to not meet he size requirement. Have Project Lanadscape Architect contact City Landscape Architet to discuss Call in for final inspection ONLY after asbuilts have been submitted (uploaded to portal) reviewd and approved. 10/31/2024 As-builts submitted with a Bond | |||
| LDSC- LANDSCAPE FINAL | 10/31/2024 | APPROVED | DRAMIREZ |
| Note: AS-built submitted with a Bond. | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 10/30/2024 | APPROVED | DRAMIREZ |
| LDSC-IRRIGATION FINAL | 10/28/2024 | CANCELLED BY APPLICANT | RPICATAGI |
| Note: Applicant must submit Irrigation As-Builts signed and sealed by RLA Prior to Final Irrigation Inspection | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 10/28/2024 | CANCELLED BY APPLICANT | RPICATAGI |
| Note: Inpsection has been cancelled due to lack of Landscape As-Builts signed and sealed by RLA. Also, 340 or so viburnums appear to not meet he size requirement. Have Project Lanadscape Architect contact City Landscape Architet to discuss Call in for final inspection ONLY after asbuilts have been submitted (uploaded to portal) reviewd and approved. | |||
| UC-FINAL SITE INSPECTION | 10/28/2024 | FINAL APPROVED | LFITZGERALD |
| FIRE HYDRANT LOCATION AND FLOW TEST | 10/24/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/24/2024 4:47:43 PM *** flows ranged from 1000-1200 gal/min,lower than usual and per Randy holmes possible thay water plants throtled down pressures befor the storm and not yet back to normal operating pressures-Randy was not overly concerned;i tried contacting Ryan-water plant operations manager but no answer | |||
| UC-SUBSTANTIAL WALK-THRU | 10/24/2024 | APPROVED | LFITZGERALD |
| UC- PRELIMINARY AS-BUILTS | 10/24/2024 | APPROVED | LFITZGERALD |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 10/23/2024 | APPROVED | AWATERS |
| BLD- ADA PARKING | 10/23/2024 | APPROVED | AWATERS |
| BLD- ADA SIGNAGECONTROL | 10/23/2024 | APPROVED | AWATERS |
| LDSC-TREE BARRICADE | 10/22/2024 | APPROVED | RPICATAGI |
| LDSC-PRE-PLANTING TREE QUALITY | 10/22/2024 | APPROVED | RPICATAGI |
| ELECTRIC FINAL | 10/22/2024 | APPROVED | RMARTIN |
| U-WATER METER INSTALLATION/VERIFICATION | 10/21/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/21/2024 10:53:35 AM *** yes both potable/fire detector with noah and lucas | |||
| UROW-RETENT/DETENT STABILI | 10/21/2024 | APPROVED | LFITZGERALD |
| UROW -FINAL GRADE PRIOR SOD | 10/17/2024 | FINAL APPROVED | LFITZGERALD |
| UROW - FINAL DRAINAGE | 10/17/2024 | FINAL APPROVED | LFITZGERALD |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 10/17/2024 | FINAL APPROVED | LFITZGERALD |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 10/17/2024 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9015 *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:14:05 AM *** water into building satisfactory | |||
| FIRE ACCESS ROAD | 10/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:32:17 AM *** Randy per my request made a site visit and approved fire access road and turning radius of parking lot | |||
| U - UTILITY COMMERCIAL FINAL | 10/03/2024 | APPROVED | DLEAP |
| PROJECT CLOSE OUT MEETING (386-986-3750) | 09/03/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/3/2024 11:49:41 AM *** meeting with city staff-Dennis,Patrick,Rebecca and only Jerry Barnes-he forgot about this meeting as wll as did not inform personnll on his side but clarifications were done and Jerry seemed to undertand what needed to close out this project | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 08/01/2024 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9070 *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:11:15 AM *** PRIVATE LS(oil can) started up by pump manufacture reps.-report to be forwarded to utility | |||
| UC-ASPHALT PRE PLACEMENT | 08/01/2024 | APPROVED | LFITZGERALD |
| U-WATER SERVICE INSTALLATION | 08/01/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:14:05 AM *** water into building satisfactory | |||
| U-PUMP STATION START-UP | 08/01/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/1/2024 8:11:15 AM *** PRIVATE LS(oil can) started up by pump manufacture reps.-report to be forwarded to utility | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 08/01/2024 | APPROVED | LFITZGERALD |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 08/01/2024 | APPROVED | LFITZGERALD |
| Note: 6/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:43:42 PM *** now forming/placing sidewalks Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:38:23 PM *** remainde of envirnmental curbing now installed and Dcurb for landscape Inspector Notes from Inspection 9105 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County 5/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| BLD- UNDERGROUND ELEC/GAS | 06/14/2024 | APPROVED | RMARTIN |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 06/14/2024 | APPROVED | RMARTIN |
| Note: 6/13/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 06/14/2024 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 06/14/2024 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 06/14/2024 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING EXTERIOR MOUNTED | 06/14/2024 | APPROVED | RMARTIN |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 06/13/2024 | CANCELLED BY APPLICANT | RMARTIN |
| UC-CONSTRUCTION ENTRANCE | 06/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County | |||
| UROW- CURBING & GUTTER | 06/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:38:23 PM *** remainde of envirnmental curbing now installed and Dcurb for landscape Inspector Notes from Inspection 9105 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County 5/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 06/07/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:43:42 PM *** now forming/placing sidewalks Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:38:23 PM *** remainde of envirnmental curbing now installed and Dcurb for landscape Inspector Notes from Inspection 9105 *** NOTES ADDED BY LFITZGERALD 6/7/2024 4:36:38 PM *** now being constructed with bse in preperaion for asphalt placement New inspection due to canceled inspection 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County 5/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| UROW- CURBING & GUTTER | 05/29/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/29/2024 11:47:31 AM *** staring install of Environmental curbing-back of building Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| U-GRAVITY SEWER INSTALL/TESTING | 05/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:33:39 PM *** 4inch sch40 placed for gravity sewer from bldg. clean out to Private Lift Station-John James to provide letter from EOR satisfying using a 4in pipe vs. plan approved 6in. Inspector Notes from Inspection 9010 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| U-PUMP STATION PRE-INSTALLATION | 05/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 05/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:29:16 PM *** 2inch tap/gate valve installed prior me-today(Jamey), now 2 in Poly FM installed from gate valve to Lift Station, and trace wire Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 5/17/2024 5:24:30 PM *** PV can L/S set and 3yards concrete pored around bouyant flange | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/14/2024 | APPROVED | JHARDING |
| UC-CONSTRUCTION ENTRANCE | 01/16/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 3/6/2023 - PREVIOUS INSPECTION NOTES Must call the entrance inspection into Flager County | |||
| UC-CONSTRUCTION ENTRANCE | 03/07/2023 | Disapproved - NO FEE | JHARDING |
| Note: Must call the entrance inspection into Flager County | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/07/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/07/2023 | APPROVED | JHARDING |
| PLAN - PRE-CON 386-986-3750 | 11/04/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: on site meeting with city staff and contractor John James and property owner Jerry |
Review History
| Department | Status | Date In | Date Out |
| UD1 | COMPLETE | 05/04/2020 | 05/04/2020 |
| Note: Released By: DRAMIREZ Permit hold is on the permit notes. | |||
| BLD | COMPLETE | 02/05/2020 | 02/11/2020 |
| Note: Released By: PBUCKLEY | |||
| ENGIN1 | COMPLETE | 02/05/2020 | 02/12/2020 |
| Note: Released By: CMORALES | |||
| PLLA | COMPLETE | 02/05/2020 | 02/05/2020 |
| Note: Released By: BDAWSON | |||
| UD1 | HOLD | 02/05/2020 | 02/07/2020 |
| Note: Held By: CJOHNSON Fees, agreements and FDEP permits or Engineers Letter of Determination shall be complete prior to issuance of the Site Development permit |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤62.50) | 11/04/2022 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 11/04/2022 |
| INSPECTION - GENERAL | ¤600.00 | 11/04/2022 |
| SITE INSPECTION | ¤560.00 | 11/04/2022 |
| SITE PLAN 30 | ¤30.00 | 11/04/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,252.50 |