Permit #2020020321
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7007-00460-0210 |
| Block: 00460 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-864-2199 |
| Location Address: 54 FREEMONT TURN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 04/14/2020 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: GOLDEN MAGNOLIA INC |
|
Address 1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤100,000.00 |
| Job Description: BUILDING ADDITION |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/05/2021 | FINAL APPROVED | WMILLER |
| U -UTILITY RESIDENTIAL FINAL | 03/05/2021 | FINAL APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 03/04/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE OTHER FINALS CAN BE. 2/22/21 - 6 ft of road edge repair needed on the right side property line. See paint marks. 2/23/21road edge not repaired yet | |||
| ROW - FINAL INSPECTION | 02/23/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE OTHER FINALS CAN BE. 2/22/21 - 6 ft of road edge repair needed on the right side property line. See paint marks. 2/23/21road edge not repaired yet | |||
| ROW - FINAL INSPECTION | 02/22/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION FINAL SURVEY MUST BE APPROVED BEFORE THE OTHER FINALS CAN BE. 2/22/21 - 6 ft of road edge repair needed on the right side property line. See paint marks. | |||
| ROW - FINAL INSPECTION | 02/08/2021 | Disapproved - NO FEE | RGROSS |
| Note: FINAL SURVEY MUST BE APPROVED BEFORE THE OTHER FINALS CAN BE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/21/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION OUTSIDE SOD ELEVATION MUST BE 4 INCHES BELOW FINISHED FLOOR ELEVATION. THERE ARE NOW OUTSIDE SOD ELEVATIONS AT THE FOUNDATION ON THE FINAL SURVEY TO COMPARE THE FFE TO. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/15/2021 | Disapproved - NO FEE | RGROSS |
| Note: OUTSIDE SOD ELEVATION MUST BE 4 INCHES BELOW FINISHED FLOOR ELEVATION. THERE ARE NOW OUTSIDE SOD ELEVATIONS AT THE FOUNDATION ON THE FINAL SURVEY TO COMPARE THE FFE TO. | |||
| LATH/BRICK/ WATER BARRIER | 09/28/2020 | APPROVED | WMILLER |
| INSULATION | 09/24/2020 | APPROVED | TSTAUFFACHER |
| Note: Pool House | |||
| ALL ROUGH | 09/04/2020 | APPROVED - AS NOTED | WMILLER |
| Note: NEED THE FOLLOWING BY INSULATION.... 1. MAKE UP ELECTRIC AT BATH EXHAUST FAN, ALL METAL BOXES SHALL BE GROUNDED R,E 3905.2 AND NEC.314.4 2. 5FT HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 3. NEED REVISION FOR ADDED HOT WATER HEATER BY INSULATION 4. ATTIC ACCESS NEEDS TO BE INSTALLED FBC. R807.1 5. DOORS NEED TO BE INSTALLED BY INSULATION | |||
| ALL ROUGH | 09/03/2020 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 07/31/2020 | APPROVED | JCOLASANTI |
| Note: inspected main house by mistake, went back to inspect this addition | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/02/2020 | APPROVED | MMESSER |
| TIE BEAM / LINTEL | 06/23/2020 | APPROVED | MMESSER |
| TIE BEAM / LINTEL | 06/22/2020 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 06/22/2020 | APPROVED | TBAKER |
| GRAVITY SEWER TEST | 05/08/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS FOR POOL HOUSE SEWER AND CONNCTION | |||
| MONOLITHIC SLAB | 05/07/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION missing steal in footing and down rods marked on print | |||
| MONOLITHIC SLAB | 05/01/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: missing steal in footing and down rods marked on print | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/29/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION NO STAMPED PLANS OR NEW RISER TO INDICATE WHAT IS BEING ADDED TO PERMIT | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/17/2020 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO STAMPED PLANS OR NEW RISER TO INDICATE WHAT IS BEING ADDED TO PERMIT |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 01/14/2021 | 01/14/2021 |
| Note: Held By: STHOMAS RENAME TO FINAL SURVEY.PDF | |||
| BADMIN | COMPLETE | 01/14/2021 | 01/14/2021 |
| Note: Released By: STHOMAS | |||
| BLD | COMPLETE | 09/15/2020 | 09/22/2020 |
| Note: Released By: FREODICA Revision: Added water heater on floor plan. | |||
| ENGIN1 | COMPLETE | 06/19/2020 | 06/22/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| PLFM | COMPLETE | 06/19/2020 | 06/19/2020 |
| Note: Released By: JMYERS This addition does not fall within a flood zone. No elevation certificates are required. | |||
| ZON | COMPLETE | 06/19/2020 | 06/19/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 04/06/2020 | 04/06/2020 |
| Note: Released By: JMUNSON | |||
| UD1 | COMPLETE | 03/16/2020 | 03/20/2020 |
| Note: Released By: AHALL | |||
| ENGIN1 | COMPLETE | 03/16/2020 | 03/16/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 03/16/2020 | 03/17/2020 |
| Note: Released By: ELENS | |||
| ELEC | HOLD | 03/16/2020 | 03/17/2020 |
| Note: Held By: JMUNSON Need to submitt electrical riser | |||
| SW1 | COMPLETE | 03/16/2020 | 03/17/2020 |
| Note: Released By: CTROHA | |||
| BLD | COMPLETE | 02/24/2020 | 02/24/2020 |
| Note: Released By: PBUCKLEY The code section cited by the plans examiner (R403.1.4.) addresses the minimum depth of "exterior" footings and requires the bottom of exterior footings to be a minimum of 12 inches below the undisturbed ground surface. The exterior footings for this proposed building are designed for a total depth from top of slab to bottom of footing of 20 inches - 8 inches above the ground and 12 inches below the ground. Exterior footings comply with this code section. The plans examiner referenced a Section B-B on the plans which is a section view of an interior footing. The interior footing only extends below the ground 8 inches. I believe the plans examiner was referring to this footing, but provided a citation for a code section that only relates to exterior footings. As such, this reivew hold is removed and now marked complete. | |||
| BLD | HOLD | 02/11/2020 | 02/20/2020 |
| Note: Held By: FREODICA 1. B-B Footer detail- Minimum depth of exterior footing shall be placed not less han 12 inches below the undisturbed ground surface per FBCR 6th ed. sec. R403.1.4. FReodica-386-986-4734. | |||
| ELEC | HOLD | 02/11/2020 | 02/12/2020 |
| Note: Held By: JMUNSON Need to submitt Riser Diagram | |||
| MECH | COMPLETE | 02/11/2020 | 02/12/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 02/11/2020 | 02/19/2020 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 02/11/2020 | 02/13/2020 |
| Note: Held By: CTROHA Applicant needs to show proposed elevations on a 20' grid Applicant must match existing elevations at the property line of improved lots and show proposed drainage conveyance inside the property line. | |||
| ZON | HOLD | 02/11/2020 | 02/11/2020 |
| Note: Held By: ELENS Maximum size of an accessory structure is 500 square feet. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 03/04/2021 |
| REINSPECTION FEE | ¤40.00 | 03/04/2021 |
| REINSPECTION FEE | ¤40.00 | 03/04/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 03/04/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 03/04/2021 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 04/14/2020 |
| SITE PLAN 20 | ¤20.00 | 04/14/2020 |
| SURCHARGE FS 533.721 | ¤4.40 | 04/14/2020 |
| SURCHARGE - FS 468.631 | ¤6.60 | 04/14/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/14/2020 |
| ADMIN FEE | ¤20.00 | 04/14/2020 |
| ELECTRIC FEE | ¤120.00 | 04/14/2020 |
| MECHANICAL FEE | ¤120.00 | 04/14/2020 |
| PLAN CHECK FEE | ¤40.00 | 04/14/2020 |
| PLUMBING FEE | ¤120.00 | 04/14/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤771.00 |