I want to search for...
Permit #2020020441
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00030-0100 |
| CONDITIONED SPACE: 1492 sqft |
| GARAGE: 459 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2079 sqft |
| Block: 00030 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 386-627-8993 |
| Location Address: 101 BERKSHIRE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/18/2020 |
| NOC: RECORDED |
| Applicant name: WILLIAM PIERCE STOUGHTON |
| Owner: LATORRE ELISABETH |
|
Address 299 PINE STREET ORMOND BEACH, FL 32174 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
STOUGHTON & DURAN CUSTOM HOMES LLC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1478 BUNNELL, FL 32110 |
CGC047560 (Exp: 08/31/2026) | 386-627-8993 | 866-576-9888 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RICHARD LEE VONBROCKEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1738 STATE AVE HOLLY HILL, FL 32117 |
CAC035516 (Exp: 08/31/2026) | (386)672-1950 | (386)672-1952 |
BRIAN CHRISTOPHER MULLEN
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 351158 PALM COAST, FL 0 |
CCC1330417 (Exp: 08/31/2026) | 386-385-8504 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/12/2021 | FINAL APPROVED | FWILLIS |
| U-CROSS CONNECTION | 05/12/2021 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 05/12/2021 | APPROVED - AS NOTED | KRUTH |
| Note: New inspection due to canceled inspection there is a pallet of sod in the swale that needs to be removed and a pile of mulch in the back yard on the vacant property that will need to be removed Approved as noted that sod will be removed today 5/12/21 mulch is ok per home owner using it later and permission from lot owner for the storage | |||
| U -UTILITY RESIDENTIAL FINAL | 05/12/2021 | FINAL APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 05/11/2021 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 05/11/2021 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 05/11/2021 | CANCELLED BY APPLICANT | WEB |
| Note: there is a pallet of sod in the swale that needs to be removed and a pile of mulch in the back yard on the vacant property that will need to be removed | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/07/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 05/07/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION needs sod then a final survey before the after pour and row stormwater final can be done corrections made | |||
| U-CROSS CONNECTION | 05/07/2021 | CANCELLED BY APPLICANT | WEB |
| FINAL SURVEY (OFFICE USE ONLY) | 05/07/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 03/03/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: needs sod then a final survey before the after pour and row stormwater final can be done | |||
| ROW- PRE-APRON (PRE-POUR) | 03/01/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION *TOO MUCH MATERIAL IN THE POUR AREA. MINIMUM 4 INCHES THROUGHOUT THE POUR BEYOND THE ROW. *MATERIAL ALL OVER NEEDS MORE COMPACTION. *CULVERT TO BE BURIED ONLY 50 % NOT 90 TO 95%. *NOT 4 INCHES THICK AT THE GARAGE AND PORCH ENTRANCE. *APRON SLOPE TOO STEEP MINIMUM IS 8%. Pipe is 5 tenths out of tolerance corrections made It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/25/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION *TOO MUCH MATERIAL IN THE POUR AREA. MINIMUM 4 INCHES THROUGHOUT THE POUR BEYOND THE ROW. *MATERIAL ALL OVER NEEDS MORE COMPACTION. *CULVERT TO BE BURIED ONLY 50 % NOT 90 TO 95%. *NOT 4 INCHES THICK AT THE GARAGE AND PORCH ENTRANCE. *APRON SLOPE TOO STEEP MINIMUM IS 8%. Pipe is 5 tenths out of tolerance | |||
| ELECTRIC - EARLY POWER | 02/23/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:50 | |||
| ELECTRIC - EARLY POWER | 02/22/2021 | Disapproved - NO FEE | RMARTIN |
| Note: UN-USED OPENINGS IN GARAGE ELECTRIC PANEL, NEED BREAKER BLANKS NEC 110.12A | |||
| U - SEWER TIE IN | 02/18/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/17/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: U-SEWER WILL BE CALLED IN TOMMOROW | |||
| ROW- PRE-APRON (PRE-POUR) | 02/08/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: *TOO MUCH MATERIAL IN THE POUR AREA. MINIMUM 4 INCHES THROUGHOUT THE POUR BEYOND THE ROW. *MATERIAL ALL OVER NEEDS MORE COMPACTION. *CULVERT TO BE BURIED ONLY 50 % NOT 90 TO 95%. *NOT 4 INCHES THICK AT THE GARAGE AND PORCH ENTRANCE. *APRON SLOPE TOO STEEP MINIMUM IS 8%. | |||
| ELECTRIC - EARLY POWER | 01/08/2021 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 01/08/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:10 am | |||
| LATH/BRICK/ WATER BARRIER | 12/10/2020 | APPROVED | FWILLIS |
| INSULATION | 12/08/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 12/04/2020 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Tape vertical joints on vent pipes as discussed//check at insulation THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Main Service Not connected. . Dryer Exhaust seams and connections, sealed…(6th edition) Need to seal dryer exhaust duct per FBC M, 1502.4.2 and 1601.4.1 Rafter tails on bump out not clipped | |||
| ALL ROUGH | 12/03/2020 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Main Service Not connected. . Dryer Exhaust seams and connections, sealed…(6th edition) Need to seal dryer exhaust duct per FBC M, 1502.4.2 and 1601.4.1 Rafter tails on bump out not clipped | |||
| ALL ROUGH | 12/02/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION Main Service Not connected. | |||
| ALL ROUGH | 12/01/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Main Service Not connected. | |||
| ALL ROUGH | 11/17/2020 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION not ready | |||
| ALL ROUGH | 11/16/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: not ready | |||
| ROOF VALLEY & METAL | 10/30/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need MTS 12 rafters to top plate bump out at kithen | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/26/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/09/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 08/12/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/21/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 05/10/2021 | 05/10/2021 |
| Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM you sending a revision saying Final no new final survey was submitted, but your final survey was approved on 5/6/21 | |||
| BADMIN | COMPLETE | 05/10/2021 | 05/10/2021 |
| Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/23/2020 | 10/23/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 10/23/2020 | 10/26/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 10/22/2020 | 10/22/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 10/22/2020 | 10/23/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 10/21/2020 | 10/22/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 10/21/2020 | 10/21/2020 |
| Note: Held By: TDOAK Foundation survey does not match approved site plan (the concrete in the front of the home is different than was approved). Please resubmit revised site plan to match foundation survey. | |||
| ZON | COMPLETE | 06/17/2020 | 06/18/2020 |
| Note: Released By: AMOBLEY | |||
| BADMIN | COMPLETE | 06/17/2020 | 06/17/2020 |
| Note: Released By: JMONTARULI | |||
| BADMIN | HOLD | 06/09/2020 | 06/09/2020 |
| Note: Held By: STHOMAS 1. REMOVE '34 UPDATED' FROM ALL FILE NAMES 2. RENAME TO PLANS.PDF | |||
| BADMIN | HOLD | 06/09/2020 | 06/09/2020 |
| Note: Held By: STHOMAS PLANS MUST BE UPLOADED INDIVIDUALLY. CAN NOT BE SINGLE PDF | |||
| ZON | HOLD | 05/22/2020 | 05/22/2020 |
| Note: Held By: AMOBLEY No new plans submitted. Roofing worksheet shows a flat roof Per The LDC chapter 13 Section -13.03 All single family buildings shall have a pitched roof covereing a minimum of 65% of the overall floor area under roof Roof pitch must be at least a 5:12 and shall have an overhang beyond the building wall Flat roofed areas including, but not limited to, porches are permissible in the remaining 35% of floor area under roof. | |||
| MECH | COMPLETE | 05/22/2020 | 05/26/2020 |
| Note: Released By: CPISCITELLI | |||
| BLD | COMPLETE | 05/22/2020 | 05/26/2020 |
| Note: Released By: JPI | |||
| ZON | HOLD | 05/22/2020 | 05/22/2020 |
| Note: Held By: TDOAK Repeat Comments 1. Per the LDC, "the corners of the home shall be wrapped with shrubbery or have an understory tree planted there." - See right front of home. 2. Two identical homes cannot be built within 4 lots of each other. This home is identical to the one you are building at #97. - Revise the elevation. 3. When resubmitting the changes to the exterior elevation as required above, please note that this house requires two forms of articulation since the frontage exceeds 50'. | |||
| ZON | HOLD | 05/22/2020 | 05/22/2020 |
| Note: Held By: TDOAK No new plans submitted. Roofing worksheet shows a flat roof Per The LDC chapter 13 Section -13.03 All single family buildings shall have a pitched roof covereing a minimum of 65% of the overall floor area under roof Roof pitch must be at least a 5:12 and shall have an overhang beyond the building wall Flat roofed areas including, but not limited to, porches are permissible in the remaining 35% of floor area under roof. Per the LDC, "the corners of the home shall be wrapped with shrubbery or have an understory tree planted there." (SEE FRONT RIGHT SIDE OF HOME) Two identical homes cannot be built within 4 lots of each other. This home is identical to the one you are building at #97. When resubmitting the changes to the exterior elevation as required above, please note that this house requires two forms of articulation since the frontage exceeds 50'. | |||
| BLD | HOLD | 02/13/2020 | 02/18/2020 |
| Note: Held By: JPI 1. On the roofing worksheet, please provide the underlayment type. 2. On the product approval worksheet, please complete sections for siding, lintel, underlayment (if not on the roofing worksheet) and structural components. 3. Garage door entrance. R302.5.1 Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors. Please label the door option. 4. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. | |||
| CUSVC | COMPLETE | 02/13/2020 | 02/13/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 02/13/2020 | 02/18/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 02/13/2020 | 02/13/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/13/2020 | 02/14/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 02/13/2020 | 02/14/2020 |
| Note: Held By: CPISCITELLI Provide duct layout signed by the AC contractor | |||
| PLUM | COMPLETE | 02/13/2020 | 02/18/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/13/2020 | 02/19/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 02/13/2020 | 02/20/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 02/13/2020 | 02/13/2020 |
| Note: Held By: TDOAK 1. Per the LDC, "the corners of the home shall be wrapped with shrubbery or have an understory tree planted there." 2. Two identical homes cannot be built within 4 lots of each other. This home is identical to the one you are building at #97. 3. When resubmitting the changes to the exterior elevation as required above, please note that this house requires two forms of articulation since the frontage exceeds 50'. | |||
| SWALE | COMPLETE | 02/13/2020 | 03/02/2020 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/12/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/12/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/12/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 06/18/2020 |
| SEWER INSPECTION | ¤25.00 | 06/18/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/18/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/18/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤380.00 | 06/18/2020 |
| SITE PLAN 20 | ¤20.00 | 06/18/2020 |
| SURCHARGE FS 533.721 | ¤9.42 | 06/18/2020 |
| SURCHARGE - FS 468.631 | ¤14.13 | 06/18/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/18/2020 |
| METER - DEPOSIT | ¤60.00 | 06/18/2020 |
| WATER- TURN ON | ¤25.00 | 06/18/2020 |
| ADMIN FEE | ¤20.00 | 06/18/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/18/2020 |
| ELECTRIC FEE | ¤174.00 | 06/18/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/18/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/18/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/18/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/18/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/18/2020 |
| MECHANICAL FEE | ¤174.00 | 06/18/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/18/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/18/2020 |
| PLAN CHECK FEE | ¤76.00 | 06/18/2020 |
| PLUMBING FEE | ¤174.00 | 06/18/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,653.90 |