Permit #2020020465
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-0430 |
| CONDITIONED SPACE: 2778 sqft |
| GARAGE: 835 sqft |
| OPENED PORCH (WITH ROOF) : 515 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 4198 sqft |
| Block: 00000 |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: 386-445-2012 |
| Location Address: 18 WATERVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/25/2020 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: LAMB ROBERT E & AMY E H&W |
|
Address 36 RIVER PARK DRIVE N PALM COAST, FL 32137 |
| Lot: 0430 |
| Contracted Stated Job Value: ¤400,436.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/23/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 10/20/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 10/19/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 10/19/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/15/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 10/15/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION FINISHED FLOOR ELEVATION MUST BE A MINIMUM OF 4 INCHES ABOVE THE FINAL OUTSIDE FOUNDATION SOD ELEVATION. COMPARE FFE 11.87 TO THE RIGHT FRONT CORNER OUTSIDE GRADE EL. 11.65 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/14/2020 | Disapproved - NO FEE | RGROSS |
| Note: FINISHED FLOOR ELEVATION MUST BE A MINIMUM OF 4 INCHES ABOVE THE FINAL OUTSIDE FOUNDATION SOD ELEVATION. COMPARE FFE 11.87 TO THE RIGHT FRONT CORNER OUTSIDE GRADE EL. 11.65 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/25/2020 | Disapproved - NO FEE | RGROSS |
| Note: LEFT SIDE REAR PROPERTY LINE ALLOWING STORM WATER TO FLOW ONTO THE ADJACENT LOT. NEEDS TO BE BANKED FROM NEAR THE END OF THE VINYL FENCE TO THE SEA WALL. NOTE: THIS WAS SUPPOSED TO BE ADDED TO A DIFFERENT PERMIT. DISREGARD. INSPECTOR DELETED THE SECOND ONE GENERATED BY THIS FAILED INSPECTION. | |||
| U-CROSS CONNECTION | 09/25/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: irrigation by well-no cosss connection | |||
| ROW- PRE-APRON (PRE-POUR) | 09/25/2020 | APPROVED | RGROSS |
| Note: READY TO POUR THE SIDEWALK. | |||
| ROW- PAVER RESTRAINTS | 09/02/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 09/02/2020 | APPROVED | RGROSS |
| Note: READY FOR PAVERS | |||
| ELECTRIC - EARLY POWER | 06/30/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:00 | |||
| GRAVITY SEWER TEST | 05/26/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: WAS INSPECTED FRIDAY 5/22/20 | |||
| U - SEWER TIE IN | 05/26/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: WAS INSPECTED FRIDAY 5/22/20 | |||
| INSULATION | 05/15/2020 | APPROVED | JDELBONIS |
| LATH/BRICK/ WATER BARRIER | 05/12/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 05/06/2020 | APPROVED | JDELBONIS |
| Note: going to need to call in for a tub set | |||
| WINDOW FASTENING | 04/23/2020 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 04/20/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/17/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 04/14/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:30 | |||
| ELECTRIC-TUG | 04/09/2020 | Disapproved - NO FEE | RMARTIN |
| Note: UN-USED OPENINGS IN PANEL 110.12A NEED SCH. 80 UNDERGROUND PVC NOT THERE | |||
| TIE BEAM / LINTEL | 04/01/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/31/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/23/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/18/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 03/16/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/16/2020 | 10/22/2020 |
| Note: Released By: FREODICA Revision: changed product approval of garage doors. | |||
| ENGIN1 | COMPLETE | 03/30/2020 | 03/31/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/20/2020 | 02/21/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 02/20/2020 | 02/21/2020 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 02/14/2020 | 02/14/2020 |
| Note: Held By: ELENS Please provide driveway width at garage door. Landscape plan and site plan lot square footage do not match. | |||
| BLD | COMPLETE | 02/13/2020 | 02/21/2020 |
| Note: Released By: BBEMBRY | |||
| CUSVC | COMPLETE | 02/13/2020 | 02/14/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 02/13/2020 | 02/18/2020 |
| Note: Held By: JMUNSON Need to specifiy what the 40 amp J box is for. Need to know the amperage for the electric car outlet | |||
| ENGIN1 | COMPLETE | 02/13/2020 | 02/13/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/13/2020 | 02/19/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 02/13/2020 | 02/14/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 02/13/2020 | 02/18/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/13/2020 | 02/20/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 02/13/2020 | 02/20/2020 |
| Note: Released By: AHALL | |||
| PLENV | COMPLETE | 02/13/2020 | 02/13/2020 |
| Note: Released By: JMYERS No comments | |||
| URB | COMPLETE | 02/13/2020 | 02/19/2020 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 10/26/2020 |
| REVISION | ¤40.00 | 10/26/2020 |
| SITE PLAN 20 | ¤20.00 | 02/25/2020 |
| SURCHARGE FS 533.721 | ¤17.44 | 02/25/2020 |
| SURCHARGE - FS 468.631 | ¤26.16 | 02/25/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/25/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 02/25/2020 |
| SEWER INSPECTION | ¤25.00 | 02/25/2020 |
| METER - DEPOSIT | ¤60.00 | 02/25/2020 |
| WATER-METER | ¤434.59 | 02/25/2020 |
| ADMIN FEE | ¤20.00 | 02/25/2020 |
| CONNECTION FEES | ¤25.00 | 02/25/2020 |
| ELECTRIC FEE | ¤300.60 | 02/25/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/25/2020 |
| IMPACT FEE FIRE | ¤223.38 | 02/25/2020 |
| IMPACT FEE PARKS | ¤849.24 | 02/25/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/25/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 02/25/2020 |
| MECHANICAL FEE | ¤300.60 | 02/25/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/25/2020 |
| PLAN CHECK FEE | ¤160.40 | 02/25/2020 |
| PLUMBING FEE | ¤300.60 | 02/25/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤802.00 | 02/25/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,260.06 |