Permit #2020021054
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00020-0180 |
| CONDITIONED SPACE: 1964 sqft |
| GARAGE: 579 sqft |
| OPENED PORCH (WITH ROOF) : 410 sqft |
| OPENED PORCH (WITH ROOF) : 146 sqft |
| Total Square Footage: 3099 sqft |
| Block: 00020 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-864-2199 |
| Location Address: 7 FERNGATE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/04/2020 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: MUROLO VINCENZO & MARTA MUROLO H&W |
|
Address 8 FRENORA LANE PALM COAST, FL 32137 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/25/2021 | FINAL APPROVED | BGREVE |
| U -UTILITY RESIDENTIAL FINAL | 03/24/2021 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 03/23/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Two crates that stonework was shipped with need removed from the ROW. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/23/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/22/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION OUTSIDE SOD ELEVATION AT THE FOUNDATION MUST BE A MINIMUM OF 4 INCHES BELOW THE FINISHED FLOOR ELEVATION. COMPARE THE FINISHED FLOOR EL TO THE RIGHT SIDE FOUNDATION SOD GRADE NEAR AND ALONG THE A/C PAD 15.3 / 15.1 / 15. 4 CONSECUTIVELY. 02/12/2021= INVERTS NUMBERS WON'T MATCH WITH THE SWALE PLAN PLEASE RE-CHECK THE NUMBERS AND SUBMIT ANOTHER FINAL SURVEY, 02/12/21 - Culvert set too high. Compare swale plan to Final Survey Culvert Elevation. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/16/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION OUTSIDE SOD ELEVATION AT THE FOUNDATION MUST BE A MINIMUM OF 4 INCHES BELOW THE FINISHED FLOOR ELEVATION. COMPARE THE FINISHED FLOOR EL TO THE RIGHT SIDE FOUNDATION SOD GRADE NEAR AND ALONG THE A/C PAD 15.3 / 15.1 / 15. 4 CONSECUTIVELY. 02/12/2021= INVERTS NUMBERS WON'T MATCH WITH THE SWALE PLAN PLEASE RE-CHECK THE NUMBERS AND SUBMIT ANOTHER FINAL SURVEY, 02/12/21 - Culvert set too high. Compare swale plan to Final Survey Culvert Elevation. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2021 | CANCELLED BY INSPECTOR | RGROSS |
| PROJECT STATUS (OFFICE USE) | 02/12/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: 02/12/2021= INVERTS NUMBERS WON'T MATCH WITH THE SWALE PLAN PLEASE RE-CHECK THE NUMBERS AND SUBMIT ANOTHER FINAL SURVEY, | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/12/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A REINSPECTION OUTSIDE SOD ELEVATION AT THE FOUNDATION MUST BE A MINIMUM OF 4 INCHES BELOW THE FINISHED FLOOR ELEVATION. COMPARE THE FINISHED FLOOR EL TO THE RIGHT SIDE FOUNDATION SOD GRADE NEAR AND ALONG THE A/C PAD 15.3 / 15.1 / 15. 4 CONSECUTIVELY. 02/12/2021= INVERTS NUMBERS WON'T MATCH WITH THE SWALE PLAN PLEASE RE-CHECK THE NUMBERS AND SUBMIT ANOTHER FINAL SURVEY, | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/21/2021 | Disapproved - NO FEE | RGROSS |
| Note: OUTSIDE SOD ELEVATION AT THE FOUNDATION MUST BE A MINIMUM OF 4 INCHES BELOW THE FINISHED FLOOR ELEVATION. COMPARE THE FINISHED FLOOR EL TO THE RIGHT SIDE FOUNDATION SOD GRADE NEAR AND ALONG THE A/C PAD 15.3 / 15.1 / 15. 4 CONSECUTIVELY. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/10/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION DRIVEWAY BEYONG 15 FEET ROW NEED TO BE 4 INCH I LEFT PINK SPRAY PAINT ON THE PLACES NEED TO BE LOWER UNTIL REACH 4 ICNH BY THE MAIN ENTRANCE IS NOT 4 INCH AND BY THE GARAGE SLAB IS NOT 4 INCH PIPE IS GOOD I DID CHECK IT REBAR #4 AT LEAST MINIMUM 24 INCH ONE IS 18 THE OTHER 20 11/19/20 - CORRECTIONS FROM PREVIOUS FAILED INSPECTION HAVE NOT BEEN DONE. STILL NEEDS MORE MATERIAL REMOVED FROM THE GENERAL POUR AREA. SEE PAINT. NOT 4 INCHES AT THE PORCH ENTRANCE AND GARAGE. 11/23/20 - FOOTERS AT THE END OF THE CULVERT WASHED OUT. PIPE FULL OF WATER FROM END TO END FROM LAST NIGHTS RAIN. 10:15AM. PLENTY OF TIME TO CHECK IT TODAY. 12/10/12 - READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 11/23/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION DRIVEWAY BEYONG 15 FEET ROW NEED TO BE 4 INCH I LEFT PINK SPRAY PAINT ON THE PLACES NEED TO BE LOWER UNTIL REACH 4 ICNH BY THE MAIN ENTRANCE IS NOT 4 INCH AND BY THE GARAGE SLAB IS NOT 4 INCH PIPE IS GOOD I DID CHECK IT REBAR #4 AT LEAST MINIMUM 24 INCH ONE IS 18 THE OTHER 20 11/19/20 - CORRECTIONS FROM PREVIOUS FAILED INSPECTION HAVE NOT BEEN DONE. STILL NEEDS MORE MATERIAL REMOVED FROM THE GENERAL POUR AREA. SEE PAINT. NOT 4 INCHES AT THE PORCH ENTRANCE AND GARAGE. 11/23/20 - FOOTERS AT THE END OF THE CULVERT WASHED OUT. PIPE FULL OF WATER FROM END TO END FROM LAST NIGHTS RAIN. 10:15AM. PLENTY OF TIME TO CHECK IT TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/19/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION DRIVEWAY BEYONG 15 FEET ROW NEED TO BE 4 INCH I LEFT PINK SPRAY PAINT ON THE PLACES NEED TO BE LOWER UNTIL REACH 4 ICNH BY THE MAIN ENTRANCE IS NOT 4 INCH AND BY THE GARAGE SLAB IS NOT 4 INCH PIPE IS GOOD I DID CHECK IT REBAR #4 AT LEAST MINIMUM 24 INCH ONE IS 18 THE OTHER 20 11/19/20 - CORRECTIONS FROM PREVIOUS FAILED INSPECTION HAVE NOT BEEN DONE. STILL NEEDS MORE MATERIAL REMOVED FROM THE GENERAL POUR AREA. SEE PAINT. NOT 4 INCHES AT THE PORCH ENTRANCE AND GARAGE. CULVERT ELEVATION CHECKED AGAIN AND IS STILL WITHIN TOLERANCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/18/2020 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: DRIVEWAY BEYONG 15 FEET ROW NEED TO BE 4 INCH I LEFT PINK SPRAY PAINT ON THE PLACES NEED TO BE LOWER UNTIL REACH 4 ICNH BY THE MAIN ENTRANCE IS NOT 4 INCH AND BY THE GARAGE SLAB IS NOT 4 INCH PIPE IS GOOD I DID CHECK IT REBAR #4 AT LEAST MINIMUM 24 INCH ONE IS 18 THE OTHER 20 | |||
| ELECTRIC - EARLY POWER | 11/18/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION NEED TO HAVE 4/0 AL OR 2/0 CU FOR SERVICE PER PLAN, 2/0 AL IS NOT RATED FOR 200A NEC 310.16 11/18/20 1. Above items were taken care of 2. Emailed FPL at 10:17 am | |||
| ELECTRIC - EARLY POWER | 11/17/2020 | Disapproved - NO FEE | RMARTIN |
| Note: NEED TO HAVE 4/0 AL OR 2/0 CU FOR SERVICE PER PLAN, 2/0 AL IS NOT RATED FOR 200A NEC 310.16 | |||
| U-CROSS CONNECTION | 10/29/2020 | APPROVED - AS NOTED | JHARDING |
| Note: Approved. No irrigation and no cross connection | |||
| GRAVITY SEWER TEST | 10/09/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION SEWER NOT RAN YET | |||
| U - SEWER TIE IN | 10/09/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 10/08/2020 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 09/18/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION 1. need energy calcs on site for inspection 2. need fire foam at cold water in master bath top plate. FIREBLOCKING REQUIRED R302.11 (1-6) 3. need to clean up area around permit box or move to accessible area (weeds 5 ft tall). FBC 110.1 9-18-2020... deficiencies noted above resolved. | |||
| INSULATION | 09/17/2020 | Disapproved - NO FEE | WMILLER |
| Note: 1. need energy calcs on site for inspection 2. need fire foam at cold water in master bath top plate. FIREBLOCKING REQUIRED R302.11 (1-6) 3. need to clean up area around permit box or move to accessible area (weeds 5 ft tall). FBC 110.1 | |||
| LATH/BRICK/ WATER BARRIER | 09/17/2020 | APPROVED | WMILLER |
| ALL ROUGH | 08/27/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need approved documents on site for inspection. 107.3,1. will need to block front door opening if door is not in by insulation...need to fireblock chaselaundry room exterior wall....need to frame electrical panel | |||
| ALL ROUGH | 08/26/2020 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION need approved documents on site for inspection. 107.3,1. | |||
| ALL ROUGH | 07/30/2020 | CANCELLED BY APPLICANT | JCOLASANTI |
| ROOF VALLEY & METAL | 07/14/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/09/2020 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 06/29/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 06/26/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/20/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION R318.6.2 canot have aney vegitaion or debree within 1 foot under or arround slab or footers also need compation report | |||
| MONOLITHIC SLAB | 05/18/2020 | CANCELLED BY APPLICANT | JDELBONIS |
| Note: THIS IS A REINSPECTION R318.6.2 canot have aney vegitaion or debree within 1 foot under or arround slab or footers also need compation report | |||
| MONOLITHIC SLAB | 05/15/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: R318.6.2 canot have aney vegitaion or debree within 1 foot under or arround slab or footers also need compation report | |||
| GRAVITY SEWER TEST | 05/11/2020 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: SEWER NOT RAN YET | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/08/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 04/09/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 02/11/2021 | 02/11/2021 |
| Note: Held By: STHOMAS RENAME TO BLOWER DOOR.PDF | |||
| BADMIN | COMPLETE | 02/11/2021 | 02/11/2021 |
| Note: Released By: STHOMAS | |||
| ZON | COMPLETE | 06/24/2020 | 06/24/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 06/24/2020 | 06/26/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 04/01/2020 | 04/02/2020 |
| Note: Released By: CTROHA | |||
| SW1 | HOLD | 03/20/2020 | 03/20/2020 |
| Note: Held By: CTROHA Applicant must match existing elevations at the property line of improved lots and show proposed drainage conveyance inside the property line. I need to be able to see what is existing and what you are proposing along a developed lot. The rear lot is developed also | |||
| BLD | COMPLETE | 03/20/2020 | 03/27/2020 |
| Note: Released By: FREODICA | |||
| UD1 | COMPLETE | 03/20/2020 | 03/24/2020 |
| Note: Released By: MBACON | |||
| ENGIN1 | COMPLETE | 03/20/2020 | 03/20/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 03/20/2020 | 03/20/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 03/11/2020 | 03/11/2020 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 03/09/2020 | 03/10/2020 |
| Note: Held By: ELENS Repeat comment: Need second form of articulation on the front elevation. LCD 13.03.03 B.: Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1.A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2.Quoins and banding shall wrap around the corners of the structure for at least two feet. 3.Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4.Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas. | |||
| ELEC | HOLD | 03/09/2020 | 03/11/2020 |
| Note: Held By: JMUNSON Need to send in new electric plan with corrections on it. | |||
| BLD | HOLD | 03/09/2020 | 03/16/2020 |
| Note: Held By: FREODICA Repeat comment: Provide Florida product approval for garage door per FS 553.842 and administrative Code 9B-72. FReodica-386-986-4734 | |||
| UD1 | COMPLETE | 03/09/2020 | 03/12/2020 |
| Note: Released By: AHALL | |||
| SW1 | HOLD | 03/09/2020 | 03/13/2020 |
| Note: Held By: CTROHA Applicant needs to show proposed elevations on a 20' grid also show proposed drainage elevations. | |||
| ENGIN1 | COMPLETE | 03/09/2020 | 03/10/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 03/02/2020 | 03/20/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 02/27/2020 | 03/06/2020 |
| Note: Held By: FREODICA Provide Florida product approval for garage door per FS 553.842 and administrative Code 9B-72. FReodica-386-986-4734 | |||
| CUSVC | COMPLETE | 02/27/2020 | 02/28/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 02/27/2020 | 03/02/2020 |
| Note: Held By: JMUNSON Need outlets in dinning room for wall spacing. NEC 2014 art 210.52 (A) (2) Need specifications on the generator and a riser diagram Smoke Alarm outside of bedrooms needs to be a carbon alarm. FBC 2017 315.1 | |||
| ENGIN1 | COMPLETE | 02/27/2020 | 03/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 02/27/2020 | 02/28/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 02/27/2020 | 03/02/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 02/27/2020 | 03/06/2020 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 02/27/2020 | 03/06/2020 |
| Note: Held By: CTROHA Applicant needs to show proposed elevations on a 20' grid also show proposed drainage elevations. | |||
| UD1 | COMPLETE | 02/27/2020 | 03/03/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 02/27/2020 | 02/28/2020 |
| Note: Held By: ELENS Need to show platted easements on the site plan. Need to show the driveway width at the garage door. The site plan layout does no match the landscape plan or the site plan on the building plans. (All must match, including the floor plan.) 16 foundation plantings are required, 8 across the front and 4 on each side of the house (not including the shrubs screening the A/C pad). Please specify the paint manufacturer on the color sheet for the exterior and garage paint and specify the color the garage will be. P{lease add the exterior finish on the color sheet. (Stucco, not Acrylic.) Need second form of articulation on the front elevation. LCD 13.03.03 B.: Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1.A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2.Quoins and banding shall wrap around the corners of the structure for at least two feet. 3.Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4.Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤530.00 | 04/04/2020 |
| SITE PLAN 20 | ¤20.00 | 04/04/2020 |
| SURCHARGE FS 533.721 | ¤12.27 | 04/04/2020 |
| SURCHARGE - FS 468.631 | ¤18.41 | 04/04/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/04/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 04/04/2020 |
| SEWER CREDIT | (¤1,147.00) | 04/04/2020 |
| SEWER INSPECTION | ¤25.00 | 04/04/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 04/04/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 04/04/2020 |
| 04/04/2020 | ||
| METER - DEPOSIT | ¤60.00 | 04/04/2020 |
| WATER- TURN ON | ¤25.00 | 04/04/2020 |
| ADMIN FEE | ¤20.00 | 04/04/2020 |
| CONNECTION FEES | ¤1,002.88 | 04/04/2020 |
| ELECTRIC FEE | ¤219.00 | 04/04/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/04/2020 |
| IMPACT FEE FIRE | ¤223.38 | 04/04/2020 |
| IMPACT FEE PARKS | ¤849.24 | 04/04/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/04/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 04/04/2020 |
| MECHANICAL FEE | ¤219.00 | 04/04/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/04/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/04/2020 |
| PLAN CHECK FEE | ¤106.00 | 04/04/2020 |
| PLUMBING FEE | ¤219.00 | 04/04/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,909.03 |