I want to search for...

Permit #2020021088

Permit Details

Status: COED

Parcel Id: 48-11-31-1700-00000-0240
CONDITIONED SPACE: 2817 sqft
GARAGE: 1000 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
OPENED PORCH (WITH ROOF) : 361 sqft
Total Square Footage: 4234 sqft
Block: 00000
Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I
Job Phone: 386-445-2012
Location Address: 15 NATIVE OAK CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/19/2020
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: AIELLO FRANK & MARGARET AIELLO H&W

Address

805 LIVE OAK TERRACE

ST PETERSBURG, FL 33703

Lot: 0240
Contracted Stated Job Value: ¤404,572.00
Job Description: Single Family Residence
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
PATTI MULLIGAN
Status Location Address State License Number Phone Fax
DECEASED

2803 REIS ST

PALATKA, FL 32177

21948 (Exp: 07/10/2021) 386-698-1033 386-698-1077
TRAVIS MIDDLETON
Status Location Address State License Number Phone Fax
CANCEL

2680 HIGHWAY 17 SOUTH

CRESCENT CITY, FL 32112

00714 (Exp: 11/24/2022) 386-698-1033 386-698-1077

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/02/2020 FINAL APPROVED WMILLER
U-CROSS CONNECTION 12/02/2020 APPROVED - AS NOTED LFITZGERALD
Note: re-use,no cross conection
U -UTILITY RESIDENTIAL FINAL 12/02/2020 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 12/01/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 12/01/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 11/30/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 11/30/2020 APPROVED RGROSS
GAS ROUGH 11/30/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION INSIDE OF RESIDENCE OK.. ANOTHER GAS ROUGH INSPECTION NEEDED FOR TANK TO HOUSE
GAS FINAL 11/30/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 10/16/2020 APPROVED JGIBSON
U - SEWER TIE IN 10/16/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 10/16/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION PRE- POUR IS NOT BASE ONSITE 10/16/20 - BUILDER REMINDED TO GET GOOD COMPACTION BEFORE PLACING PAVERS.
ROW- PAVER RESTRAINTS 10/01/2020 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 10/01/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: PRE- POUR IS NOT BASE ONSITE
ELECTRIC - EARLY POWER 07/15/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 12:40 pm
ELECTRIC - EARLY POWER 07/14/2020 CANCELLED BY APPLICANT WEB
INSULATION 06/24/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. need fire blocking at fireplace, range vent, and wire through top plate above low voltage panel per R302.11 (1-6) 2. need energy calcs on site for inspection 6/23/20 still need fire foam at wire through top plate above low voltage panel per R302.11 6/24/20 - All items corrected.
INSULATION 06/23/2020 Disapproved - NO FEE MMESSER
Note: THIS IS A REINSPECTION 1. need fire blocking at fireplace, range vent, and wire through top plate above low voltage panel per R302.11 (1-6) 2. need energy calcs on site for inspection 6/23/20 still need fire foam at wire through top plate above low voltage panel per R302.11
INSULATION 06/22/2020 Disapproved - NO FEE WMILLER
Note: 1. need fire blocking at fireplace, range vent, and wire through top plate above low voltage panel per R302.11 (1-6) 2. need energy calcs on site for inspection
LATH/BRICK/ WATER BARRIER 06/22/2020 APPROVED WMILLER
LATH/BRICK/ WATER BARRIER 06/19/2020 CANCELLED BY APPLICANT WEB
GAS ROUGH 06/17/2020 PARTIALLY APPROVED JGIBSON
Note: INSIDE OF RESIDENCE OK.. ANOTHER GAS ROUGH INSPECTION NEEDED FOR TANK TO HOUSE
ALL ROUGH 06/16/2020 APPROVED - AS NOTED WMILLER
Note: need the following by insulation... 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 (top of panel) 2. door and window bucks 3. cap at electric chase in wall near back porch near kitchen (conduit)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/28/2020 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION roof sheathing only
ROOF VALLEY & METAL 05/28/2020 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2020 PARTIALLY APPROVED JDELBONIS
Note: roof sheathing only
ELECTRIC-TUG 05/14/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:18 am
FOUND SURVEY APPROVED (OFFICE) 05/07/2020 APPROVED TBAKER
TIE BEAM / LINTEL 05/07/2020 APPROVED JDELBONIS
MONOLITHIC SLAB 04/24/2020 APPROVED JDELBONIS
PLUMBING 1ST ROUGH UNDERGROUND 04/23/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 04/03/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 05/06/2020 05/06/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 05/06/2020 05/07/2020
Note: Released By: TBAKER
MECH COMPLETE 03/12/2020 03/12/2020
Note: Released By: CPISCITELLI
ELEC COMPLETE 03/12/2020 03/12/2020
Note: Released By: JMUNSON
SW1 COMPLETE 03/12/2020 03/13/2020
Note: Released By: CTROHA
BLD COMPLETE 03/12/2020 03/19/2020
Note: Released By: PBUCKLEY
BLD HOLD 02/27/2020 03/10/2020
Note: Held By: PBUCKLEY 1. Provide correct code reference for design - The 2017 Florida Building Code-Residential 6th Edition. 2. Provide design code reference for electrical - the 2014 National Electric Code. 3. Provide complete design loads including floor live and dead load, roof live and dead load and wind loads for componants and cladding including doors, windows and garage door. FBC-Residential - Sections R301.1 and R301.2.1. and Tables R301.2 (2) and R302.2 (3). 4. Provide design soil bearing capacity. 5. Indicate wind design is V ult. 6. Roof covering Product Approval number on Roofing Worksheet is incorrect and cannot be verified. It also does not match the roofing worksheet. 7. Product Approval Number not provided on Product Approval Worksheet for C.W.S. sliding door.
CUSVC COMPLETE 02/27/2020 02/28/2020
Note: Released By: HHAND
ELEC HOLD 02/27/2020 03/03/2020
Note: Held By: JMUNSON Master Bathroom needs to have outletsby the sinks. NEC 2014 art 210.52 (D) Master Bedroom needs a switch for the outdoor lights by the door. NEC 2014 art 210.70(A) (2)(b)
ENGIN1 COMPLETE 02/27/2020 03/02/2020
Note: Released By: TBAKER
LOCATE COMPLETE 02/27/2020 02/28/2020
Note: Released By: CSTONE
MECH HOLD 02/27/2020 03/02/2020
Note: Held By: CPISCITELLI Plans show spray foam insulation in attic. Energy calcs say R30 in attic. Revise to match
PLUM COMPLETE 02/27/2020 03/10/2020
Note: Released By: PBUCKLEY Plumbing Riser Diagram n
SW1 HOLD 02/27/2020 03/06/2020
Note: Held By: CTROHA Applicant must match existing elevations at the property line of improved lots and show proposed drainage conveyance inside the property line.
UD1 COMPLETE 02/27/2020 03/03/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 02/27/2020 02/28/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 12/02/2020
CONTRACTOR CHANGE ¤40.00 12/02/2020
REINSPECTION FEE ¤40.00 12/02/2020
NEW RESIDENTIAL INSPECTIONS ¤810.00 03/19/2020
SITE PLAN 20 ¤20.00 03/19/2020
SURCHARGE FS 533.721 ¤17.59 03/19/2020
SURCHARGE - FS 468.631 ¤26.39 03/19/2020
STORM WATER PERMIT FEES ¤80.00 03/19/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 03/19/2020
SEWER INSPECTION ¤25.00 03/19/2020
ELECTRIC FEE ¤303.00 03/19/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 03/19/2020
IMPACT FEE FIRE ¤223.38 03/19/2020
IMPACT FEE PARKS ¤849.24 03/19/2020
IMPACT FEE SCHOOL ¤3,600.00 03/19/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 03/19/2020
MECHANICAL FEE ¤303.00 03/19/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 03/19/2020
PLAN CHECK FEE ¤162.00 03/19/2020
PLUMBING FEE ¤303.00 03/19/2020
METER - DEPOSIT ¤60.00 03/19/2020
WATER-METER ¤434.59 03/19/2020
WATER-METER ¤361.04 03/19/2020
ADMIN FEE ¤20.00 03/19/2020
CONNECTION FEES ¤25.00 03/19/2020
Fees Total Due: ¤0.00 Total Paid: ¤10,678.28