I want to search for...
Permit #2020030174
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7032-00550-0010 |
| Block: 00550 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 386-864-2199 |
| Location Address: 1 ROCKEFELLER DR |
| Type: DR - DRIVEWAY |
| Issue Date: 03/27/2020 |
| NOC: Unknown |
| Applicant name: MAXIM TARANNIK |
| Owner: GOLDEN MAGNOLIA INC |
|
Address 1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤2,500.00 |
| Job Description: CIRCULAR DRIVE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/19/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 08/18/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: MAX WILL KEEP EYE ON EROSION ALONG DRIVEWAY EDGE | |||
| ROW - FINAL INSPECTION | 08/18/2020 | FINAL APPROVED | KHOWELL |
| Note: MAX WILL KEEP EYE ON EROSION ALONG DRIVEWAY EDGE | |||
| ROW- PRE-APRON (PRE-POUR) | 04/02/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVED SITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 04/01/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVEDSITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/31/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: PIPE IS OUT OF TOLERANCE LEFT SIDE IS TO HIGH |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/12/2020 | 03/13/2020 |
| Note: Released By: AMOBLEY | |||
| UD1 | COMPLETE | 03/12/2020 | 03/12/2020 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 03/12/2020 | 03/18/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 03/04/2020 | 03/10/2020 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 03/04/2020 | 03/06/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 03/04/2020 | 03/05/2020 |
| Note: Held By: AMOBLEY Driveway must continue into right of way. Please correct site plan showing it continuing into right of way |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 03/27/2020 |
| SITE PLAN 20 | ¤20.00 | 03/27/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/27/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/27/2020 |
| STORM WATER PERMIT FEES | ¤40.00 | 03/27/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.00 |