Permit #2020030256
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0820 |
| CONDITIONED SPACE: 2584 sqft |
| GARAGE: 677 sqft |
| OPENED PORCH (WITH ROOF) : 44 sqft |
| OPENED PORCH (WITH ROOF) : 435 sqft |
| Total Square Footage: 3740 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 215 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/18/2020 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: FL HOUSE LLC |
|
Address 2298 COLBERT LANE PALM COAST, FL 32137 |
| Lot: 0820 |
| Contracted Stated Job Value: ¤327,134.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/13/2020 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 11/13/2020 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 11/12/2020 | APPROVED - AS NOTED | DHANEY |
| Note: No Cross CN. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/12/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 11/12/2020 | Disapproved - NO FEE | RGROSS |
| Note: PER SUPER, OWNER OF THE ADJACENT LOT NEEDING REPAIRED WITH SOD IS NEGOTIATING WITH THE BUILDER TO HAVE A HOME BUILT ON THE PROPERTY AND THE DETENTION RUN OFF WOULD BE SODDED AFTER THAT CONSTRUCTION. HOWEVER, NO WRITTEN DOCUMENTATION HAS BEEN PRODUCED YET FROM THE ADJACENT PROPERTY OWNER. | |||
| ROW - STORMWATER FINAL | 11/12/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION PER SUPER, OWNER OF THE ADJACENT LOT NEEDING REPAIRED WITH SOD IS NEGOTIATING WITH THE BUILDER TO HAVE A HOME BUILT ON THE PROPERTY AND THE DETENTION RUN OFF WOULD BE SODDED AFTER THAT CONSTRUCTION. HOWEVER, NO WRITTEN DOCUMENTATION HAS BEEN PRODUCED YET FROM THE ADJACENT PROPERTY OWNER. NOTE: THIS INSPECTION WAS SCHEDULED THE SAME DAY BY THE INSPECTOR BECAUSE THE DOCUMENT MENTIONED ABOVE WAS PRODUCED AND DATED 11/10/20 FROM THE ADJACENT LOT OWNER. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/10/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THE DETENTION SYSTEM ON THE ADJACENT LOT ON THE RIGHT WHERE EXTRA FILL WAS DUMPED ILLEGALLY NEEDS RESHAPED AND THE BANK COMPLETELY SODDED. BARE EARTH AREA ON THE DETENTION SYSTEM ON THE LEFT ALSO NEEDS SOD TO PREVENT WASHOUT. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/10/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 08/12/2020 | APPROVED | RGROSS |
| Note: READY TO POUR. | |||
| ELECTRIC - EARLY POWER | 06/18/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:50 | |||
| GRAVITY SEWER TEST | 05/21/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/21/2020 | APPROVED | JDELBONIS |
| U - SEWER TIE IN | 05/21/2020 | APPROVED | JGIBSON |
| INSULATION | 05/19/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 05/13/2020 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 05/07/2020 | APPROVED | JDELBONIS |
| LATH/BRICK/ WATER BARRIER | 05/06/2020 | CANCELLED BY INSPECTOR | JDELBONIS |
| ELEV CERT-FOUNDATION APPROVAL | 05/06/2020 | APPROVED | JMYERS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/01/2020 | APPROVED | JDELBONIS |
| Note: JC from Skyway called in this inspection | |||
| ELECTRIC-TUG | 04/14/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:40 | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/13/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/13/2020 | APPROVED | JDELBONIS |
| MONOLITHIC SLAB | 04/01/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/31/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION PREVIOUS CORRECTION MADE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/30/2020 | Disapproved - NO FEE | JGIBSON |
| Note: PIPES PASSING THROUGH FOOTER | |||
| WATER METER INSTALLATION REQUEST | 03/19/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 11/09/2020 | 11/09/2020 |
| Note: Released By: JMYERS The Final elevation certificate has been approved. | |||
| PLFM | COMPLETE | 05/06/2020 | 05/06/2020 |
| Note: Released By: JMYERS The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ENGIN1 | COMPLETE | 04/09/2020 | 04/13/2020 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 03/16/2020 | 03/16/2020 |
| Note: Released By: CPISCITELLI | |||
| PLFM | COMPLETE | 03/16/2020 | 03/16/2020 |
| Note: Released By: JMYERS The Construction elevation certificate has been accepted. Please provide Building and Final prior to receiving CO. | |||
| PLFM | HOLD | 03/13/2020 | 03/13/2020 |
| Note: Held By: JMYERS In Section C2c the elevation of the garage from the elevation certificate notes 11.68' while the Site Plan notes 11.34'. Please clarify the correct elevation of the garage on either the Site Plan or the elevation certificate. | |||
| PLFM | HOLD | 03/09/2020 | 03/09/2020 |
| Note: Held By: JMYERS The entire property is located in an AE Zone. Elevation Certificates will be required at 3 stages: Construction Drawings, Foundation, and Final. Elevation Certificates must be turned in hard copy and on the new 2019 edition. | |||
| BLD | COMPLETE | 03/06/2020 | 03/16/2020 |
| Note: Released By: PBUCKLEY | |||
| CUSVC | COMPLETE | 03/06/2020 | 03/09/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 03/06/2020 | 03/09/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 03/06/2020 | 03/10/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 03/06/2020 | 03/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 03/06/2020 | 03/09/2020 |
| Note: Held By: CPISCITELLI Orientation on Energy calcs and site plans do not match the survey. Revise to both to match the survey | |||
| PLUM | COMPLETE | 03/06/2020 | 03/16/2020 |
| Note: Released By: PBUCKLEY | |||
| SW1 | HOLD | 03/06/2020 | 03/06/2020 |
| Note: Held By: CTROHA Applicant needs to show proposed elevations on a 20' grid also show proposed drainage elevations. | |||
| UD1 | COMPLETE | 03/06/2020 | 03/10/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 03/06/2020 | 03/09/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 03/06/2020 | 03/06/2020 |
| Note: Released By: CTROHA |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 11/13/2020 |
| ELECTRIC FEE | ¤260.40 | 03/18/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/18/2020 |
| IMPACT FEE FIRE | ¤223.38 | 03/18/2020 |
| IMPACT FEE PARKS | ¤849.24 | 03/18/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/18/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 03/18/2020 |
| MECHANICAL FEE | ¤260.40 | 03/18/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/18/2020 |
| PLAN CHECK FEE | ¤133.60 | 03/18/2020 |
| PLUMBING FEE | ¤260.40 | 03/18/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤668.00 | 03/18/2020 |
| SITE PLAN 20 | ¤20.00 | 03/18/2020 |
| SURCHARGE FS 533.721 | ¤14.89 | 03/18/2020 |
| SURCHARGE - FS 468.631 | ¤22.34 | 03/18/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/18/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 03/18/2020 |
| SEWER INSPECTION | ¤25.00 | 03/18/2020 |
| METER - DEPOSIT | ¤60.00 | 03/18/2020 |
| WATER-METER | ¤434.59 | 03/18/2020 |
| WATER-METER | ¤361.04 | 03/18/2020 |
| ADMIN FEE | ¤20.00 | 03/18/2020 |
| CONNECTION FEES | ¤25.00 | 03/18/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,293.33 |