I want to search for...
Permit #2020030376
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7024-00030-0260 |
| Block: 00030 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 386-227-2646 |
| Location Address: 2 PRINCESS ROSE DR |
| Type: DR - DRIVEWAY |
| Issue Date: 04/20/2020 |
| NOC: Unknown |
| Applicant name: JUAN P BARTOLOME HERNANDEZ |
| Owner: SOROCHINSKI WILLIAM P & VIRGINIA H&W |
|
Address 2 PRINCESS ROSE DR PALM COAST, FL 32164 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: REMOVE AND REPLACE CONCRETE DRIVEWAY |
| Type: CN |
Contractor
A TOUCH OF SPAIN INC
| Status | Location Address | Phone |
| INACTIVE |
74 SEVEN WONDERS TRAIL , |
386-227-2646 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 04/05/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 02/10/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS NOTES WAS ON AFTER-POUR INSPECTION ON 9-1-20. REPAIR THE EROSION AT THE MITERED ENDS SECTIONS AND REMOVE THE DIRT THAT WASHED IN FRONT OF THE CULVERT AT THE SWALE BEFORE CALLED IN ROW STORMWATER FINAL 02/10/2021=CORRECTION MADE | |||
| ROW - FINAL INSPECTION | 09/18/2020 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THIS NOTES WAS ON AFTER-POUR INSPECTION ON 9-1-20. REPAIR THE EROSION AT THE MITERED ENDS SECTIONS AND REMOVE THE DIRT THAT WASHED IN FRONT OF THE CULVERT AT THE SWALE BEFORE CALLED IN ROW STORMWATER FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | 09/01/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: REPAIR THE EROSION AT THE MITERED ENDS SECTIONS AND REMOVE THE DIRT THAT WASHED IN FRONT OF THE CULVERT AT THE SWALE BEFORE CALLED IN ROW STORMWATER FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | 04/21/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: CULVERT PIPE WAS NOT REPLACED |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/09/2020 | 03/18/2020 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 03/09/2020 | 03/12/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 03/09/2020 | 03/10/2020 |
| Note: Released By: TDOAK |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/26/2021 |
| SITE PLAN 20 | ¤20.00 | 04/20/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/20/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/20/2020 |
| STORM WATER PERMIT FEES | ¤40.00 | 04/20/2020 |
| ADMIN FEE | ¤20.00 | 04/20/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤124.00 |