I want to search for...
Permit #2020030392
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00190-0190 |
| CONDITIONED SPACE: 1406 sqft |
| GARAGE: 395 sqft |
| OPENED PORCH (WITH ROOF) : 99 sqft |
| OPENED PORCH (WITH ROOF) : 44 sqft |
| Total Square Footage: 1944 sqft |
| Block: 00190 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 904-667-3599 |
| Location Address: 56 PINE CREST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/30/2020 |
| NOC: RECORDED |
| Applicant name: TONY S JACKSON |
| Owner: 3DRE LLC |
|
Address 3544 ST JOHNS BLUFF RD S #1104 JACKSONVILLE, FL 32224 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤90,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
T-DAWG CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6821 SOUTH POINT DR N NEPTUNE , FL 32266 |
CGC1523419 (Exp: 08/31/2024) | 904-667-3599 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
JACK RICHARD SHEKIRA
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1833 LIVE OAK DR JACKSONVILLE, FL 32246 |
CCC048193 (Exp: 08/31/2026) | 904-725-4089 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 01/22/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: water meter pit too low-Rich from utility informed and said he would take care of | |||
| ROW - STORMWATER FINAL | 01/21/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION ON THE RIGHT SIDE THE PROPERTY NEED TO FILL ALL THE HOLE BETWEEN ADJACENT PROPERTIES AND SODDED RESTORE THE WAY IT WAS BEFORE CONSTRUCTION RIGHT SIDE OF THE SWALE IS NOT GOING TO DRAIN WATER RUN TO THE RIGTH STABLISH THE FLOW BACK AND TAKE OFF THE LIP IN BETWEEN PROPERTIES WATER BOX NEED TO BE RAISED LIKE 6 INCH NEED TO CALL UTILITIES 01/21/2021=CORRECTION MADE | |||
| ROW - STORMWATER FINAL | 01/20/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ON THE RIGHT SIDE THE PROPERTY NEED TO FILL ALL THE HOLE BETWEEN ADJACENT PROPERTIES AND SODDED RESTORE THE WAY IT WAS BEFORE CONSTRUCTION RIGHT SIDE OF THE SWALE IS NOT GOING TO DRAIN WATER RUN TO THE RIGTH STABLISH THE FLOW BACK AND TAKE OFF THE LIP IN BETWEEN PROPERTIES WATER BOX NEED TO BE RAISED LIKE 6 INCK NEED TO CALL UTILITIES | |||
| ROW - FINAL APRON (AFTER POUR) | 01/15/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION WE NEED TO PASS FIRST FINAL SURVEY AND AFTER WE CAN GOING WITH AFTER POUR ROW FINAL 01/15/2021=CORRECTION MADE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/15/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: ON THE RIGHT SIDE THE PROPERTY NEED TO FILL ALL THE HOLE BETWEEN ADJACENT PROPERTIES AND SODDED RESTORE THE WAY IT WAS BEFORE CONSTRUCTION RIGHT SIDE OF THE SWALE IS NOT GOING TO DRAIN WATER RUN TO THE RIGTH STABLISH THE FLOW BACK AND TAKE OFF THE LIP IN BETWEEN PROPERTIES | |||
| ROW - STORMWATER FINAL | 01/15/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION ON THE RIGHT SIDE THE PROPERTY NEED TO FILL ALL THE HOLE BETWEEN ADJACENT PROPERTIES AND SODDED RESTORE THE WAY IT WAS BEFORE CONSTRUCTION RIGHT SIDE OF THE SWALE IS NOT GOING TO DRAIN WATER RUN TO THE RIGTH STABLISH THE FLOW BACK AND TAKE OFF THE LIP IN BETWEEN PROPERTIES | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/15/2021 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION Adjacent driveway culverts and drainage features: Final Survey must include the inverts of adjacent developed property driveway culverts and any other drainage features within 100 feet of the property lines. (A) | |||
| BLD - BUILDING FINAL | 01/13/2021 | Approval - Private Provider | PPROVIDER |
| FINAL SURVEY (OFFICE USE ONLY) | 01/06/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: Adjacent driveway culverts and drainage features: Final Survey must include the inverts of adjacent developed property driveway culverts and any other drainage features within 100 feet of the property lines. (A) | |||
| ROW - FINAL APRON (AFTER POUR) | 01/06/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: WE NEED TO PASS FIRST FINAL SURVEY AND AFTER WE CAN GOING WITH AFTER POUR ROW FINAL | |||
| ROW - STORMWATER FINAL | 01/06/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: RIGHT SIDE OF THE PROPERTY END NEED TO FILL UP THE HOLES AND SOD AT THE END OF THE RIGHT SIDE SWALE NEED TO LOWER THE HUMP WATER IS NOT GOING TO FLOW | |||
| ROW- PRE-APRON (PRE-POUR) | 11/30/2020 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U-CROSS CONNECTION | 11/20/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-residence being sprinkled | |||
| U - SEWER TIE IN | 11/20/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 11/20/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 11/05/2020 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 10/21/2020 | APPROVED | CSTONE |
| ROOF VALLEY & METAL | 10/16/2020 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/14/2020 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/14/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 10/14/2020 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/09/2020 | Approval - Private Provider | PPROVIDER |
| EXTERIOR STRAP/CLIP | 09/29/2020 | Approval - Private Provider | PPROVIDER |
| Note: Window inspection | |||
| WALL SHEATHING | 09/03/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/03/2020 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 08/27/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/19/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/05/2020 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 07/21/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/26/2020 | 08/27/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 08/26/2020 | 08/26/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 03/27/2020 | 03/27/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 03/20/2020 | 03/24/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 03/20/2020 | 03/27/2020 |
| Note: Released By: FREODICA | |||
| MECH | COMPLETE | 03/11/2020 | 03/11/2020 |
| Note: Released By: CPISCITELLI | |||
| BLD | HOLD | 03/11/2020 | 03/18/2020 |
| Note: Held By: FREODICA Indicate on floor plan the door between garage and residence shall be a solid wood door nor less than 1-3/8 inches thick or honeycomb core steel door not less than 1-3/8 inches thick or 20- minute fire-rated door per FBCR 6th ed. sec. R302.5.1. FReodica-386-86-4734 | |||
| PLUM | COMPLETE | 03/11/2020 | 03/18/2020 |
| Note: Released By: FREODICA | |||
| UD1 | COMPLETE | 03/11/2020 | 03/16/2020 |
| Note: Released By: LFITZGERALD | |||
| ELEC | HOLD | 03/11/2020 | 03/12/2020 |
| Note: Held By: JMUNSON Need Load Calculations and Riser Diagram. | |||
| SW1 | COMPLETE | 03/11/2020 | 03/13/2020 |
| Note: Released By: CTROHA | |||
| ZON | HOLD | 03/11/2020 | 03/11/2020 |
| Note: Held By: TDOAK Site plan must depict width & material of proposed front walkway | |||
| BLD | HOLD | 03/10/2020 | 03/11/2020 |
| Note: Held By: BBEMBRY | |||
| CUSVC | COMPLETE | 03/10/2020 | 03/11/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 03/10/2020 | 03/11/2020 |
| Note: Held By: BBEMBRY | |||
| ENGIN1 | COMPLETE | 03/10/2020 | 03/10/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 03/10/2020 | 03/11/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 03/10/2020 | 03/10/2020 |
| Note: Held By: CPISCITELLI Need to provide construction drawings for review | |||
| PLUM | HOLD | 03/10/2020 | 03/11/2020 |
| Note: Held By: BBEMBRY | |||
| SW1 | HOLD | 03/10/2020 | 03/11/2020 |
| Note: Held By: BBEMBRY | |||
| UD1 | HOLD | 03/10/2020 | 03/11/2020 |
| Note: Held By: BBEMBRY | |||
| ZON | HOLD | 03/10/2020 | 03/11/2020 |
| Note: Held By: ELENS Please upload the floor plan and elevations so that Zoning can complete the review. | |||
| SWALE | COMPLETE | 03/10/2020 | 04/07/2020 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/20/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 01/04/2021 |
| ELECTRIC FEE | ¤166.80 | 06/30/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/30/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/30/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/30/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/30/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/30/2020 |
| MECHANICAL FEE | ¤166.80 | 06/30/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/30/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/30/2020 |
| PLAN CHECK FEE | ¤71.20 | 06/30/2020 |
| PLUMBING FEE | ¤166.80 | 06/30/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤356.00 | 06/30/2020 |
| SITE PLAN 20 | ¤20.00 | 06/30/2020 |
| SURCHARGE FS 533.721 | ¤8.96 | 06/30/2020 |
| SURCHARGE - FS 468.631 | ¤13.45 | 06/30/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/30/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 06/30/2020 |
| SEWER CREDIT | (¤1,146.22) | 06/30/2020 |
| SEWER INSPECTION | ¤25.00 | 06/30/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/30/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/30/2020 |
| METER - DEPOSIT | ¤60.00 | 06/30/2020 |
| WATER- TURN ON | ¤25.00 | 06/30/2020 |
| ADMIN FEE | ¤20.00 | 06/30/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/30/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,376.14 |