Permit #2020030787
Permit Details
Status: COED
| Parcel Id: 16-11-31-1260-00000-0220 |
| CONDITIONED SPACE: 2082 sqft |
| GARAGE: 514 sqft |
| OPENED PORCH (WITH ROOF) : 98 sqft |
| OPENED PORCH (WITH ROOF) : 86 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| SCREEN PORCH (SOLID ROOF) : 424 sqft |
| Total Square Footage: 3464 sqft |
| Block: 00000 |
| Subdivision: 2081 - Creekside Village at Grand Haven |
| Job Phone: 386-445-2012 |
| Location Address: 17 SWEETWATER CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/01/2020 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: STEVENSON KENNETH |
|
Address 146 N LAKEWALK DRIVE PALM COAST, FL 32137 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤305,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
BRIAN THOMAS KULL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
18 STRAFORD PLACE PORT ORANGE, FL 32128 |
CGC1504924 (Exp: 08/31/2026) | 386-682-9554 | (386)258-8042 |
GEORGE F AYLSWORTH JR
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
2680 S US HIGHWAY 17 CRESCENT CITY, FL 32112 |
00714 (Exp: 08/31/2021) | 386-698-1033 | 386-698-1077 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/11/2021 | FINAL APPROVED | TSTAUFFACHER |
| U-CROSS CONNECTION | 01/11/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation-PVB installed | |||
| U -UTILITY RESIDENTIAL FINAL | 01/11/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 01/08/2021 | APPROVED | RGROSS |
| Note: at the edge of the property on the empty lots need to seeded cover with straw 1/8/21 - CORRECTIONS MADE. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/08/2021 | APPROVED | RGROSS |
| GAS FINAL | 01/08/2021 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION NEED GAS LINE FROM TANK TO STUB OUT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/07/2021 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/07/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: at the edge of the property need on the empty lots need to sodded cover with straw | |||
| ROW- PRE-APRON (PRE-POUR) | 12/29/2020 | APPROVED | RGROSS |
| Note: READY TO POUR SMALL SECTION OF PUBLIC SIDEWALK. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/09/2020 | APPROVED - AS NOTED | RGROSS |
| Note: BUILDER INFORMED TO MAKE SURE THEY GET GOOD COMPACTION BEFORE PAVERS ARE PLACED. | |||
| GAS ROUGH | 12/09/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION FIRST STAGE OF GAS INSPECTION APPROVED, ANOTHER GAS ROUGH INSPECTION WILL NEED TO BE SCHEDULED FOR TANK TO HOUSE. | |||
| GAS FINAL | 12/09/2020 | Disapproved - NO FEE | JGIBSON |
| Note: NEED GAS LINE FROM TANK TO STUB OUT | |||
| ROW- PAVER RESTRAINTS | 12/02/2020 | APPROVED | RGROSS |
| Note: Inspected earlier. 7:40am. | |||
| U - SEWER TIE IN | 10/15/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/15/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 07/30/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: emailed fpl released power 2:00 | |||
| GAS ROUGH | 07/08/2020 | PARTIALLY APPROVED | JGIBSON |
| Note: FIRST STAGE OF GAS INSPECTION APPROVED, ANOTHER GAS ROUGH INSPECTION WILL NEED TO BE SCHEDULED FOR TANK TO HOUSE. | |||
| INSULATION | 07/08/2020 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 07/08/2020 | APPROVED | MMESSER |
| LATH/BRICK/ WATER BARRIER | 07/06/2020 | APPROVED | MMESSER |
| ALL ROUGH | 06/29/2020 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 06/23/2020 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION NEEDS TWO STAGGERED ROWS IN THE FIELD FOR UNDERLAYMENT PER, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) (FASTENED WITH TWO STAGGERED ROWS IN THE FIELD WITH A MAXIMUM FASTENER SPACING OF 12 inches | |||
| ROOF VALLEY & METAL | 06/22/2020 | Disapproved - NO FEE | WMILLER |
| Note: NEEDS TWO STAGGERED ROWS IN THE FIELD FOR UNDERLAYMENT PER, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) (FASTENED WITH TWO STAGGERED ROWS IN THE FIELD WITH A MAXIMUM FASTENER SPACING OF 12 inches | |||
| ELECTRIC-TUG | 06/15/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:00 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/11/2020 | APPROVED | JDELBONIS |
| ELEV CERT-FOUNDATION APPROVAL | 05/28/2020 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 05/27/2020 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 05/27/2020 | APPROVED | JDELBONIS |
| MONOLITHIC SLAB | 05/11/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/07/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/06/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 01/06/2021 | 01/06/2021 |
| Note: Released By: JMYERS The Final elevation certificate has been accepted. | |||
| BLD | COMPLETE | 06/25/2020 | 07/02/2020 |
| Note: Released By: FREODICA Revision - changed product approval for fixed windows. | |||
| PLUM | COMPLETE | 06/25/2020 | 07/02/2020 |
| Note: Released By: FREODICA Revision- added gas to cooktop. | |||
| PLFM | COMPLETE | 05/27/2020 | 05/27/2020 |
| Note: Released By: JMYERS The Building elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 05/27/2020 | 05/27/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 05/27/2020 | 05/27/2020 |
| Note: Released By: TBAKER | |||
| PLFM | COMPLETE | 04/22/2020 | 04/22/2020 |
| Note: Released By: JMYERS The revised Construction elevation certificate has been approved. Please provide Building and Final prior to receiving CO. | |||
| BLD | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: FREODICA Revision: chnged stem wall to monolithick foundation,removed stair at back. | |||
| PLUM | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: FREODICA Revision: relocated bathtub. | |||
| BLD | HOLD | 04/14/2020 | 04/21/2020 |
| Note: Held By: FREODICA Provide Revision Form with description of changes to be done for clariy per FBC 6th ed. sec. 107.2.1. | |||
| PLUM | HOLD | 04/14/2020 | 04/21/2020 |
| Note: Held By: FREODICA Provide Revision Form with description of changes to be done for clariy per FBC 6th ed. sec. 107.2.1. | |||
| SW1 | COMPLETE | 04/14/2020 | 04/15/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 04/14/2020 | 04/15/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 04/14/2020 | 04/14/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 04/14/2020 | 04/14/2020 |
| Note: Released By: TBAKER | |||
| MECH | CANCEL | 04/14/2020 | 04/14/2020 |
| Note: NOT NEEDED | |||
| ELEC | COMPLETE | 04/14/2020 | 04/15/2020 |
| Note: Released By: JMUNSON | |||
| PLFM | HOLD | 04/14/2020 | 04/14/2020 |
| Note: Held By: JMYERS A new construction elevation certificate will be required due to the change in foundation type and elevation of accessory machinery. | |||
| SW1 | COMPLETE | 04/01/2020 | 04/01/2020 |
| Note: Released By: CTROHA Stemwall arounf sides and rear | |||
| ZON | COMPLETE | 03/26/2020 | 03/26/2020 |
| Note: Released By: ELENS | |||
| ZON | HOLD | 03/25/2020 | 03/25/2020 |
| Note: Held By: ELENS It appears that you added the total patio area, and a portion is screened patio and a portion is a covered patio. Please specify the area of each and the total. | |||
| BLD | COMPLETE | 03/25/2020 | 04/01/2020 |
| Note: Released By: FREODICA | |||
| UD1 | COMPLETE | 03/25/2020 | 03/26/2020 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 03/25/2020 | 03/25/2020 |
| Note: Released By: TBAKER | |||
| SW1 | HOLD | 03/25/2020 | 03/27/2020 |
| Note: Held By: CTROHA provide an explanation why the FFE is at 12 and the sod next to the structure is 6.80 is there a stem wall? | |||
| URB | COMPLETE | 03/19/2020 | 03/20/2020 |
| Note: Released By: JBEAUDET | |||
| PLFM | COMPLETE | 03/18/2020 | 03/18/2020 |
| Note: Released By: JMYERS The construction elevation certificate has been approved. However, at building make sure that in Section C all of the elevations have a measurement boxed checked next to them, C2d was missing the measurement box. | |||
| BLD | HOLD | 03/17/2020 | 03/24/2020 |
| Note: Held By: FREODICA 1.Provide truss layout with connectors with verifiable, electonic signature and seal of engineer of record per FAC 61G15-23.002. 2. Product approval FL 5864.3 for garage door can not be found on FL Product Approval Listing. Verify the number and be sure it meets the required design pressure shown on plan per FS 553.842. FReodica-386-986-4734 | |||
| CUSVC | COMPLETE | 03/17/2020 | 03/20/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 03/17/2020 | 03/19/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 03/17/2020 | 03/18/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 03/17/2020 | 03/18/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 03/17/2020 | 03/18/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 03/17/2020 | 03/24/2020 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 03/17/2020 | 03/19/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 03/17/2020 | 03/24/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 03/17/2020 | 03/19/2020 |
| Note: Held By: ELENS All easements must be shown on the site plan. (Missing front easement) Site plan is missing the second flood zone. (This may be covered by the Palm Coast stamp) The floor plan dimensions do not seem to match the area square footage. (The screened patio and lanai) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 01/11/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 01/11/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 01/11/2021 |
| REVISION | ¤40.00 | 01/11/2021 |
| REVISION | ¤40.00 | 01/11/2021 |
| SITE PLAN 20 | ¤20.00 | 04/01/2020 |
| SURCHARGE FS 533.721 | ¤13.79 | 04/01/2020 |
| SURCHARGE - FS 468.631 | ¤20.69 | 04/01/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/01/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 04/01/2020 |
| SEWER INSPECTION | ¤25.00 | 04/01/2020 |
| ELECTRIC FEE | ¤243.00 | 04/01/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/01/2020 |
| IMPACT FEE FIRE | ¤223.38 | 04/01/2020 |
| IMPACT FEE PARKS | ¤849.24 | 04/01/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/01/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 04/01/2020 |
| MECHANICAL FEE | ¤243.00 | 04/01/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/01/2020 |
| PLAN CHECK FEE | ¤122.00 | 04/01/2020 |
| PLUMBING FEE | ¤243.00 | 04/01/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤610.00 | 04/01/2020 |
| METER - DEPOSIT | ¤60.00 | 04/01/2020 |
| WATER-METER | ¤434.59 | 04/01/2020 |
| ADMIN FEE | ¤20.00 | 04/01/2020 |
| CONNECTION FEES | ¤25.00 | 04/01/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,967.74 |