Permit #2020031027
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-0020 |
| CONDITIONED SPACE: 1823 sqft |
| GARAGE: 485 sqft |
| OPENED PORCH (WITH ROOF) : 261 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2629 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 386-447-4400 |
| Location Address: 4 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/30/2020 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: BELFIELD JAMES D & LISA A BELFIELD H&W |
|
Address 17 ROYALE LANE PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤325,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 05/03/2021 | APPROVED - AS NOTED | JHARDING |
| Note: Approved no cross connections | |||
| U -UTILITY RESIDENTIAL FINAL | 04/26/2021 | FINAL APPROVED | JHARDING |
| BLD - BUILDING FINAL | 04/26/2021 | FINAL APPROVED | WMILLER |
| ROW - STORMWATER FINAL | 04/21/2021 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 04/21/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/19/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Brass cap needed on the sewer cleanout in the driveway before scheduling the Final Apron Inspection. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/19/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 03/26/2021 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION Approved for Apron, sidewalk, and Paver restraints only. Paver Driveway. | |||
| ELECTRIC - EARLY POWER | 03/12/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 1:08 pm | |||
| ROW- PRE-APRON (PRE-POUR) | 03/05/2021 | PARTIALLY APPROVED | RGROSS |
| Note: Approved for Apron, sidewalk, and Paver restraints only. Paver Driveway. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/05/2021 | APPROVED | RGROSS |
| INSULATION | 10/15/2020 | APPROVED | MMESSER |
| LATH/BRICK/ WATER BARRIER | 10/09/2020 | APPROVED | WMILLER |
| ALL ROUGH | 10/08/2020 | APPROVED - AS NOTED | WMILLER |
| Note: (items mentioned at roof sheathing inspetion resolved) NEED THE FOLLOWING BY INSULATION 1. TUB TRENCH SEALED APPENDIX F 303.3.4.2 2. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/27/2020 | APPROVED - AS NOTED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Not Ready Truss engineering packet does not match whatnis installed. Specifically B02 - B 05 Please provide proper truss packet 8-27-2020... Please correct the following by next inspection... 1. Missing fasteners at LUS24 (highlighted on plans) 2. Missing Bracing at truss B02 (per engineering) (highlighted in engineering packet) | |||
| ROOF VALLEY & METAL | 08/27/2020 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/11/2020 | Disapproved -FEE REQUIRED | JBODEN |
| Note: THIS IS A REINSPECTION Not Ready Truss engineering packet does not match whatnis installed. Specifically B02 - B 05 Please provide proper truss packet | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/04/2020 | CANCELLED BY APPLICANT | FWILLIS |
| Note: Not Ready | |||
| ELECTRIC-TUG | 08/04/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:20 | |||
| ELECTRIC - EARLY POWER | 08/04/2020 | Disapproved - NO FEE | RMARTIN |
| Note: THIS SHOULD BE A TUG INSPECTION..... I WILL ADD IT AND APPROVE IT, CALL IN EARLY POWER WHEN DRYWALL IS UP AND FIXTURES AND DEVICES ARE IN | |||
| TIE BEAM / LINTEL | 07/15/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 07/06/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/17/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION footers are onley 6to 8inches deep 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE COMPACTION AND TERMITE TREATMENT NOTIFICATION IN BOX 1816.1.7 FBC Termite Protection intention of or completion prior to slab. | |||
| MONOLITHIC SLAB | 06/11/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: footers are onley 6to 8inches deep 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE COMPACTION AND TERMITE TREATMENT NOTIFICATION IN BOX 1816.1.7 FBC Termite Protection intention of or completion prior to slab. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/04/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 06/04/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 06/04/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/12/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/18/2020 | 08/24/2020 |
| Note: Released By: FREODICA Revision: changed truss layout. | |||
| ENGIN1 | COMPLETE | 07/02/2020 | 07/06/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 07/02/2020 | 07/02/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 04/21/2020 | 04/22/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 04/21/2020 | 04/22/2020 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 04/21/2020 | 04/22/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 04/09/2020 | 04/13/2020 |
| Note: Held By: AMOBLEY Incorrect flood map number on survey/site plan AC pad location shows it located in the easement. It can not be in the easement | |||
| ELEC | COMPLETE | 04/09/2020 | 04/14/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 04/09/2020 | 04/14/2020 |
| Note: Released By: PBUCKLEY | |||
| BLD | HOLD | 04/08/2020 | 04/08/2020 |
| Note: Held By: PBUCKLEY COMMENTS REMOVED AND REVISED FROM PREVIOUS REVIEW. PLEASE RESPOND TO ITEMS BELOW. 1. Please add smoke detector "in immediate vicinity" of Bedroom No. 3. This means in the hallway directly outside the bedroom. 2. Please relocate smoke detector in living room from its current location to a point centrally located between Bedroom No. 2 and Master Bedroom. FBCR Secton R314.3 3. Please revise exterior wall Section Notes to reflect materials to be installed on exterior side of exterior framed and CMU walls including water resistive barrier, furring if any, stucco.system, siding, all flashings between dis-similar materials and at window and doors and other openings so a complete detail of the exsterior weather-resistant envelope per FBCR R703. 4. Provide lintel tags on a plan which correlate back to the lintel per FBCR R606.10 5. Please provice product approval # for shutters or for non-impact glazing FBCR R609.11. 6. Please provide a product approval number for the peel & stick. Select the specific product being used. | |||
| URB | COMPLETE | 03/24/2020 | 03/24/2020 |
| Note: Released By: JBEAUDET | |||
| BLD | HOLD | 03/23/2020 | 03/26/2020 |
| Note: Held By: JPI 1. Provide the current building codes on the plans ([a] 107.2.1) 2.. Provide the criteria for wind on the plans, wind speed, exposure, ect. (r301.2.1) 3. Provide the required attachment resistance expressed as a moment for the roof tile. (r301.1) 4. The smoke detectors and carbon monoxide detectors are missing outside of the sleeping rooms. (r315.1) 5. Wall sections from foundation through roof are required per (107.3.5). provide a complete section include furring, framing, fire blocking, insulation, wall coverings, waterproofing, flashings, ect. 6. Sheet 4, foundation plan a. provide one option for each footer. b. provide detail for shower curb. 7. Provide lintel tags on a plan which correlate back to the lintel. ([a] 107.2.1, r606.10) 8. Please be specific for the roof sheathing identification thickness and grade. (r803.2.1) 9. Product approvals a. no product approval # provided for shutters, non-impact glazing is specified. (r609.11) b. select the method of attachment for the roof tile. ([a] 107.2.1) c. provide a product approval number for the peel & stick. select the specific product being used. ([a] 107.2.1) | |||
| CUSVC | COMPLETE | 03/23/2020 | 03/25/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 03/23/2020 | 03/24/2020 |
| Note: Held By: JMUNSON Need to submit Load Calcs. | |||
| ENGIN1 | COMPLETE | 03/23/2020 | 03/24/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 03/23/2020 | 03/25/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 03/23/2020 | 03/24/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 03/23/2020 | 03/26/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 03/23/2020 | 03/24/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 03/23/2020 | 03/25/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 03/23/2020 | 03/24/2020 |
| Note: Held By: AMOBLEY Incorrect flood map number on survey/site plan AC pad location on construction plans in different location than the location on landscape and site plan. Please correct whichever is wrong |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 04/28/2021 |
| REINSPECTION FEE | ¤40.00 | 04/28/2021 |
| REINSPECTION FEE | ¤40.00 | 04/28/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤650.00 | 04/30/2020 |
| SITE PLAN 20 | ¤20.00 | 04/30/2020 |
| SURCHARGE FS 533.721 | ¤14.55 | 04/30/2020 |
| SURCHARGE - FS 468.631 | ¤21.83 | 04/30/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/30/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 04/30/2020 |
| SEWER INSPECTION | ¤25.00 | 04/30/2020 |
| SEWER CAPITAL FACILITY | ¤2,389.36 | 04/30/2020 |
| WATER CAPITAL FACILITY FEE | ¤2,234.43 | 04/30/2020 |
| METER - DEPOSIT | ¤60.00 | 04/30/2020 |
| WATER-METER | ¤434.59 | 04/30/2020 |
| ADMIN FEE | ¤20.00 | 04/30/2020 |
| CONNECTION FEES | ¤25.00 | 04/30/2020 |
| ELECTRIC FEE | ¤255.00 | 04/30/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/30/2020 |
| IMPACT FEE FIRE | ¤223.38 | 04/30/2020 |
| IMPACT FEE PARKS | ¤849.24 | 04/30/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/30/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 04/30/2020 |
| MECHANICAL FEE | ¤255.00 | 04/30/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/30/2020 |
| PLAN CHECK FEE | ¤130.00 | 04/30/2020 |
| PLUMBING FEE | ¤255.00 | 04/30/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,597.43 |