Permit #2020031262
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00900-0070 |
| CONDITIONED SPACE: 2026 sqft |
| GARAGE: 745 sqft |
| SCREEN PORCH (SOLID ROOF) : 356 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 3187 sqft |
| Block: 00900 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-960-7720 |
| Location Address: 23 ETHAN ALLEN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/22/2020 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address 620 MALABAR ROAD SE MELBOURNE, FL 32907 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤302,470.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/11/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 01/11/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 12/30/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: 12/30/2020=CORRECTION MADE | |||
| U-CROSS CONNECTION | 12/28/2020 | APPROVED - AS NOTED | JHARDING |
| Note: Approved no irrigation no cross conection | |||
| ROW - FINAL APRON (AFTER POUR) | 12/28/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION asphault patch is not done 12/28/2020=CORRECTION MADE | |||
| ROW - STORMWATER FINAL | 12/28/2020 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION porta john is in the swale needs to be removed or on the driveway to pass the final | |||
| ROW - STORMWATER FINAL | 12/22/2020 | Disapproved - NO FEE | KRUTH |
| Note: porta john is in the swale needs to be removed or on the driveway to pass the final | |||
| ROW - FINAL APRON (AFTER POUR) | 12/22/2020 | Disapproved -FEE REQUIRED | KRUTH |
| Note: asphault patch is not done | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/22/2020 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 10/12/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: PLEASE IF A RAIN BEFORE POUR CONCRETE CHECK THE PIPE ELEVATION AGAIN | |||
| ELECTRIC - EARLY POWER | 09/04/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:30 am | |||
| GRAVITY SEWER TEST | 08/13/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 08/13/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 07/29/2020 | APPROVED | JCOLASANTI |
| INSULATION | 07/17/2020 | APPROVED | FWILLIS |
| INSULATION | 07/16/2020 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 07/16/2020 | APPROVED | CSTONE |
| ALL ROUGH | 07/14/2020 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 07/01/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/25/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Retro Fitting 20 Straps above garage entrance. Approved plans not in Construction Box. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/19/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Retro Fitting 20 Straps above garage entrance. Approved plans not in Construction Box. | |||
| TIE BEAM / LINTEL | 06/04/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 06/03/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/18/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/13/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/01/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/24/2020 | 07/01/2020 |
| Note: Released By: PBUCKLEY | |||
| BADMIN | HOLD | 06/02/2020 | 06/02/2020 |
| Note: Held By: STHOMAS PLEASE SELECT FOUNDATION SURVEY FROM DROPDOWN BOX. RENAME TO FOUNDATION SURVEY.PDF | |||
| BADMIN | COMPLETE | 06/02/2020 | 06/02/2020 |
| Note: Released By: STHOMAS | |||
| ZON | COMPLETE | 06/02/2020 | 06/02/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 06/02/2020 | 06/03/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 05/22/2020 | 05/29/2020 |
| Note: Released By: FREODICA Revision: Chsnged truss layout to accommodate customer. | |||
| BLD | COMPLETE | 04/13/2020 | 04/13/2020 |
| Note: Released By: FREODICA | |||
| ZON | COMPLETE | 04/02/2020 | 04/02/2020 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 03/31/2020 | 04/24/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 03/30/2020 | 04/03/2020 |
| Note: Held By: FREODICA Provide plans with verifiable, digital signature and seal of engineer of record per FS 471.025 and FAC 61G15-23.001/23.005. FReodica=386-986-4734 | |||
| CUSVC | COMPLETE | 03/30/2020 | 03/31/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 03/30/2020 | 04/02/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 03/30/2020 | 03/31/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 03/30/2020 | 04/01/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 03/30/2020 | 04/01/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 03/30/2020 | 04/03/2020 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 03/30/2020 | 04/01/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 03/30/2020 | 04/02/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 03/30/2020 | 03/30/2020 |
| Note: Held By: ELENS Released By: ELENS Please upload color samples for the exterior paint and the garage paint so that we can verify they are acceptable colors. Another form of Articulation is required: Land Development code Chapter 13: 13:03.B: Articulation.Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or string courses; quoins; oriels;cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least two feet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course,canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course,saltwater canal, or other similar highly visible areas. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 01/12/2021 |
| REINSPECTION FEE | ¤40.00 | 01/12/2021 |
| REINSPECTION FEE | ¤40.00 | 01/12/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤606.00 | 04/22/2020 |
| SITE PLAN 20 | ¤20.00 | 04/22/2020 |
| SURCHARGE FS 533.721 | ¤13.71 | 04/22/2020 |
| SURCHARGE - FS 468.631 | ¤20.57 | 04/22/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/22/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 04/22/2020 |
| SEWER CREDIT | (¤2,291.75) | 04/22/2020 |
| SEWER INSPECTION | ¤25.00 | 04/22/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 04/22/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 04/22/2020 |
| METER - DEPOSIT | ¤60.00 | 04/22/2020 |
| WATER- TURN ON | ¤25.00 | 04/22/2020 |
| ADMIN FEE | ¤20.00 | 04/22/2020 |
| CONNECTION FEES | ¤1,002.88 | 04/22/2020 |
| ELECTRIC FEE | ¤241.80 | 04/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/22/2020 |
| IMPACT FEE FIRE | ¤223.38 | 04/22/2020 |
| IMPACT FEE PARKS | ¤849.24 | 04/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 04/22/2020 |
| MECHANICAL FEE | ¤241.80 | 04/22/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/22/2020 |
| PLAN CHECK FEE | ¤121.20 | 04/22/2020 |
| PLUMBING FEE | ¤241.80 | 04/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,807.48 |