I want to search for...
Permit #2020031359
Permit Details
Status: CANCEL
| Parcel Id: 08-12-31-5835-00000-0010 |
| Total Square Footage: 661 sqft |
| Block: 0 |
| Subdivision: 2303 - BROOKHAVEN COTTAGES |
| Location Address: 130 BROOKHAVEN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| NOC: NO DOCUMENTATION |
| Applicant name: WILLIAM SCOTT CULP |
| Owner: BROOKHAVEN DEVELOPMENT LAND LDT |
|
Address PO BOX 940279 MAITLAND, FL 32794 |
| Lot: 10 |
| Contracted Stated Job Value: ¤56,892.00 |
| Job Description: SINGLE FAMILY RESIDENCE - TINY HOME |
| Type: CN |
Contractor
WPGC CONSTRUCTIONI, LLC
| Status | Location Address | Mailing Address | State License Number |
| CANCEL |
200 EAST CANTON AVE , |
STE 102 WINTER PARK, FL 32789 |
CGC1524369 (Exp: 08/31/2022) |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
JOSEPH RICHARD CASSIDY JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17304 PHIL C PETERS RD WINTER GARDEN, FL 34787 |
CCC1327385 (Exp: 08/31/2020) | 407-654-4426 | (407)654-4307 |
Inspection History
| Type | Request Date | Result | Inspector |
| FOUND SURVEY APPROVED (OFFICE) | |||
| FINAL SURVEY (OFFICE USE ONLY) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| WATER METER INSTALLATION REQUEST | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 06/08/2020 | 06/15/2020 |
| Note: Released By: DRAMIREZ | |||
| LOCATE | HOLD | 06/08/2020 | 06/08/2020 |
| Note: Held By: CSTONE | |||
| CUSVC | HOLD | 06/08/2020 | 06/08/2020 |
| Note: Held By: HHAND Wastewater FDEP Permits are needed, the Utility Agreement has not been executed and the intitial development fees have not been paid. The point of contact is Irma Velez. | |||
| UD1 | HOLD | 06/08/2020 | 06/10/2020 |
| Note: Held By: AHALL pending utility agreement | |||
| ELEC | COMPLETE | 06/08/2020 | 06/08/2020 |
| Note: Released By: JMUNSON | |||
| ARCHR | HOLD | 06/08/2020 | 06/10/2020 |
| Note: Held By: BDAWSON - Specify all finish colors on elevation | |||
| BLD | COMPLETE | 06/08/2020 | 06/12/2020 |
| Note: Released By: FREODICA | |||
| DSD | HOLD | 04/01/2020 | 04/01/2020 |
| Note: Held By: DRAMIREZ 1. Development Order must be approved prior to issuance of this permit. 2. Site Development Permit must be issued prior to this permit. | |||
| ARCHR | HOLD | 04/01/2020 | 04/07/2020 |
| Note: Held By: BDAWSON Must have approved architectural elevations as part of the issued development order prior to approval for this permit. | |||
| BLD | HOLD | 03/31/2020 | 04/07/2020 |
| Note: Held By: FREODICA 1. Provide Product approval for wood connectors, wood anchors and truss plates per FS 553.842. 2. Provide underlayment specs on Roofing Worksheet per FBCR 6th ed. sec. R 905.1.1 FReodica-386-986-4734. | |||
| CUSVC | HOLD | 03/31/2020 | 04/02/2020 |
| Note: Held By: HHAND 1. Pending acceptance of Utility Agreement. 2. Once accepted, and application for water and sewer will be needed. | |||
| ELEC | HOLD | 03/31/2020 | 04/03/2020 |
| Note: Held By: JMUNSON Need light outside of back door and switch. NEC 2014 art 210.70 (A) (2) (b) | |||
| ENGIN1 | COMPLETE | 03/31/2020 | 04/01/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | HOLD | 03/31/2020 | 04/02/2020 |
| Note: Held By: CSTONE locates cannot be done at this time. | |||
| MECH | COMPLETE | 03/31/2020 | 04/02/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 03/31/2020 | 04/07/2020 |
| Note: Released By: FREODICA | |||
| UD1 | HOLD | 03/31/2020 | 04/03/2020 |
| Note: Held By: AHALL pending acceptance of utility system | |||
| LOCATE | CANCEL | ||
| CUSVC | CANCEL | ||
| UD1 | CANCEL | ||
| ARCHR | CANCEL |