I want to search for...

Permit #2020040023

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00620-0110
CONDITIONED SPACE: 2003 sqft
GARAGE: 527 sqft
OPENED PORCH (WITH ROOF) : 215 sqft
OPENED PORCH (WITH ROOF) : 124 sqft
Total Square Footage: 2869 sqft
Block: 00620
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: (386)446-5161
Location Address: 23 POST OAK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/08/2020
NOC: RECORDED
Applicant name: HUGO A CAMACHO
Owner: WALKER WALTER & GURDILYN H&W

Address

37 POST TREE LANE

PALM COAST, FL 32164

Lot: 0110
Contracted Stated Job Value: ¤270,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

IDEAL HOMES AT PALM COAST, INC.
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 353639

PALM COAST, FL 32137

CBC1250774 (Exp: 08/31/2026) (386)446-5161 (386)447-0238

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/23/2021 FINAL APPROVED MMESSER
U-CROSS CONNECTION 04/23/2021 APPROVED - AS NOTED LFITZGERALD
Note: irrigated by well
U -UTILITY RESIDENTIAL FINAL 04/23/2021 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 04/22/2021 APPROVED - AS NOTED GBERTOLA
Note: colvert pipe elevation is good no over pour on the swale
ROW FIELD SURVEY /GRADING CERTIFICATION 04/22/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE LEFT BERM IS NOT WORKING correction were made
ROW - STORMWATER FINAL 04/22/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING IS GOOD.
FINAL SURVEY (OFFICE USE ONLY) 04/22/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE correction were made
FINAL SURVEY (OFFICE USE ONLY) 04/12/2021 Disapproved - NO FEE GBERTOLA
Note: LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE
ROW FIELD SURVEY /GRADING CERTIFICATION 04/12/2021 Disapproved - NO FEE GBERTOLA
Note: LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE LEFT BERM IS NOT WORKING
ROW- PRE-APRON (PRE-POUR) 02/19/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION SWALE PLAN WON'T MATCH WITH THE DESIGN ON THE SITE PLAN SWALE PLAN I HAVE ONE PIPE, SITE PLAN I HAVE 2 PIPE PLEASE CHECK AND SUBMIT THE NEW ONE 02/19/2021=READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. COLVERT PIPE IS GOOD
ROW- PRE-APRON (PRE-POUR) 02/18/2021 Disapproved - NO FEE GBERTOLA
Note: SWALE PLAN WON'T MATCH WITH THE DESIGN ON THE SITE PLAN SWALE PLAN I HAVE ONE PIPE, SITE PLAN I HAVE 2 PIPE PLEASE CHECK AND SUBMIT THE NEW ONE
U - SEWER TIE IN 02/16/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 02/16/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 02/11/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:32 am
PEP TANK INSTALLATION REQUEST 12/10/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 12/08/2020 APPROVED MMESSER
INSULATION 12/01/2020 APPROVED - AS NOTED MMESSER
Note: Seal dryer vent duct at box.
ALL ROUGH 11/24/2020 APPROVED MMESSER
ROOF VALLEY & METAL 11/06/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/03/2020 APPROVED MMESSER
ELECTRIC-TUG 10/16/2020 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION PVC needs to be glued in MA connector NEC 2014 352.48 10/16/20 Emailed FPL at 8:42 am
ELECTRIC-TUG 10/14/2020 Disapproved - NO FEE JMUNSON
Note: PVC needs to be glued in MA connector NEC 2014 352.48
TIE BEAM / LINTEL 10/07/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 09/23/2020 APPROVED TDOAK
MONOLITHIC SLAB 08/28/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 08/14/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/21/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 09/22/2020 09/23/2020
Note: Released By: TDOAK
BADMIN COMPLETE 09/22/2020 09/22/2020
Note: Released By: STHOMAS
ENGIN1 COMPLETE 09/22/2020 09/23/2020
Note: Released By: TBAKER
BADMIN HOLD 09/21/2020 09/21/2020
Note: Held By: MDEFREITAS PLEASE SPECIFY IF THIS IS A SITE PLAN FOR ZONING REVIEW OR IS A FOUNDATION.
ZON HOLD 07/20/2020 07/20/2020
Note: Held By: ELENS What is the width of the walkway to the entry? Please show the setback to the bottom of the arc of the proposed driveway.
MECH COMPLETE 04/06/2020 04/06/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 04/06/2020 04/06/2020
Note: Released By: AMOBLEY
BLD COMPLETE 04/01/2020 04/02/2020
Note: Released By: JPI
CUSVC COMPLETE 04/01/2020 04/01/2020
Note: Released By: HHAND
ELEC COMPLETE 04/01/2020 04/03/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 04/01/2020 04/01/2020
Note: Released By: TBAKER
LOCATE COMPLETE 04/01/2020 04/02/2020
Note: Released By: CSTONE
MECH HOLD 04/01/2020 04/03/2020
Note: Held By: CPISCITELLI 1. Plan shows R38 insulation in attic. Energy calcs say R30. Revise to match. 2. Energy calcs and EPL card need to be signed by the builder
PLUM COMPLETE 04/01/2020 04/02/2020
Note: Released By: JPI
SW1 COMPLETE 04/01/2020 04/01/2020
Note: Released By: CTROHA
UD1 COMPLETE 04/01/2020 04/03/2020
Note: Released By: AHALL
ZON HOLD 04/01/2020 04/01/2020
Note: Held By: ELENS Please provide dimensions of the concrete patio behind the house and the setback to the rear property line.
SWALE COMPLETE 04/01/2020 04/29/2020
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 04/08/2020
WATER- TURN ON ¤25.00 04/08/2020
ADMIN FEE ¤20.00 04/08/2020
CONNECTION FEES ¤1,002.88 04/08/2020
ELECTRIC FEE ¤222.00 04/08/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 04/08/2020
IMPACT FEE FIRE ¤223.38 04/08/2020
IMPACT FEE PARKS ¤849.24 04/08/2020
IMPACT FEE SCHOOL ¤3,600.00 04/08/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 04/08/2020
MECHANICAL FEE ¤222.00 04/08/2020
WATER -IRRIGATION INSPECTION ¤25.00 04/08/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 04/08/2020
PLAN CHECK FEE ¤108.00 04/08/2020
PLUMBING FEE ¤222.00 04/08/2020
NEW RESIDENTIAL INSPECTIONS ¤540.00 04/08/2020
SITE PLAN 20 ¤20.00 04/08/2020
SURCHARGE FS 533.721 ¤12.46 04/08/2020
SURCHARGE - FS 468.631 ¤18.69 04/08/2020
STORM WATER PERMIT FEES ¤80.00 04/08/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 04/08/2020
SEWER CREDIT (¤850.00) 04/08/2020
SEWER INSPECTION ¤25.00 04/08/2020
SEWER CAPITAL FACILITY ¤4,596.07 04/08/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 04/08/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,987.50