I want to search for...
Permit #2020040023
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00620-0110 |
| CONDITIONED SPACE: 2003 sqft |
| GARAGE: 527 sqft |
| OPENED PORCH (WITH ROOF) : 215 sqft |
| OPENED PORCH (WITH ROOF) : 124 sqft |
| Total Square Footage: 2869 sqft |
| Block: 00620 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: (386)446-5161 |
| Location Address: 23 POST OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/08/2020 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: WALKER WALTER & GURDILYN H&W |
|
Address 37 POST TREE LANE PALM COAST, FL 32164 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤270,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/23/2021 | FINAL APPROVED | MMESSER |
| U-CROSS CONNECTION | 04/23/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: irrigated by well | |||
| U -UTILITY RESIDENTIAL FINAL | 04/23/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 04/22/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: colvert pipe elevation is good no over pour on the swale | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/22/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE LEFT BERM IS NOT WORKING correction were made | |||
| ROW - STORMWATER FINAL | 04/22/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING IS GOOD. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/22/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE correction were made | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/12/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/12/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: LEFT BACK CORNER WATER IS GOING TO GET TRAP NEED TO MOVE THE WATER TO THE FRONT OF THE PROPERTY. I MARK THE FINAL SURVEY WITH RED SQUARE LEFT BERM IS NOT WORKING | |||
| ROW- PRE-APRON (PRE-POUR) | 02/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION SWALE PLAN WON'T MATCH WITH THE DESIGN ON THE SITE PLAN SWALE PLAN I HAVE ONE PIPE, SITE PLAN I HAVE 2 PIPE PLEASE CHECK AND SUBMIT THE NEW ONE 02/19/2021=READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. COLVERT PIPE IS GOOD | |||
| ROW- PRE-APRON (PRE-POUR) | 02/18/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: SWALE PLAN WON'T MATCH WITH THE DESIGN ON THE SITE PLAN SWALE PLAN I HAVE ONE PIPE, SITE PLAN I HAVE 2 PIPE PLEASE CHECK AND SUBMIT THE NEW ONE | |||
| U - SEWER TIE IN | 02/16/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/16/2021 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 02/11/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:32 am | |||
| PEP TANK INSTALLATION REQUEST | 12/10/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 12/08/2020 | APPROVED | MMESSER |
| INSULATION | 12/01/2020 | APPROVED - AS NOTED | MMESSER |
| Note: Seal dryer vent duct at box. | |||
| ALL ROUGH | 11/24/2020 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 11/06/2020 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/03/2020 | APPROVED | MMESSER |
| ELECTRIC-TUG | 10/16/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION PVC needs to be glued in MA connector NEC 2014 352.48 10/16/20 Emailed FPL at 8:42 am | |||
| ELECTRIC-TUG | 10/14/2020 | Disapproved - NO FEE | JMUNSON |
| Note: PVC needs to be glued in MA connector NEC 2014 352.48 | |||
| TIE BEAM / LINTEL | 10/07/2020 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 09/23/2020 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 08/28/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/14/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/21/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/22/2020 | 09/23/2020 |
| Note: Released By: TDOAK | |||
| BADMIN | COMPLETE | 09/22/2020 | 09/22/2020 |
| Note: Released By: STHOMAS | |||
| ENGIN1 | COMPLETE | 09/22/2020 | 09/23/2020 |
| Note: Released By: TBAKER | |||
| BADMIN | HOLD | 09/21/2020 | 09/21/2020 |
| Note: Held By: MDEFREITAS PLEASE SPECIFY IF THIS IS A SITE PLAN FOR ZONING REVIEW OR IS A FOUNDATION. | |||
| ZON | HOLD | 07/20/2020 | 07/20/2020 |
| Note: Held By: ELENS What is the width of the walkway to the entry? Please show the setback to the bottom of the arc of the proposed driveway. | |||
| MECH | COMPLETE | 04/06/2020 | 04/06/2020 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 04/06/2020 | 04/06/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 04/01/2020 | 04/02/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/01/2020 | 04/01/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 04/01/2020 | 04/03/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 04/01/2020 | 04/01/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 04/01/2020 | 04/02/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 04/01/2020 | 04/03/2020 |
| Note: Held By: CPISCITELLI 1. Plan shows R38 insulation in attic. Energy calcs say R30. Revise to match. 2. Energy calcs and EPL card need to be signed by the builder | |||
| PLUM | COMPLETE | 04/01/2020 | 04/02/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 04/01/2020 | 04/01/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 04/01/2020 | 04/03/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 04/01/2020 | 04/01/2020 |
| Note: Held By: ELENS Please provide dimensions of the concrete patio behind the house and the setback to the rear property line. | |||
| SWALE | COMPLETE | 04/01/2020 | 04/29/2020 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 04/08/2020 |
| WATER- TURN ON | ¤25.00 | 04/08/2020 |
| ADMIN FEE | ¤20.00 | 04/08/2020 |
| CONNECTION FEES | ¤1,002.88 | 04/08/2020 |
| ELECTRIC FEE | ¤222.00 | 04/08/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/08/2020 |
| IMPACT FEE FIRE | ¤223.38 | 04/08/2020 |
| IMPACT FEE PARKS | ¤849.24 | 04/08/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/08/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 04/08/2020 |
| MECHANICAL FEE | ¤222.00 | 04/08/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/08/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/08/2020 |
| PLAN CHECK FEE | ¤108.00 | 04/08/2020 |
| PLUMBING FEE | ¤222.00 | 04/08/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤540.00 | 04/08/2020 |
| SITE PLAN 20 | ¤20.00 | 04/08/2020 |
| SURCHARGE FS 533.721 | ¤12.46 | 04/08/2020 |
| SURCHARGE - FS 468.631 | ¤18.69 | 04/08/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/08/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 04/08/2020 |
| SEWER CREDIT | (¤850.00) | 04/08/2020 |
| SEWER INSPECTION | ¤25.00 | 04/08/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 04/08/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 04/08/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,987.50 |