Permit #2020040189
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00780-0050 |
| CONDITIONED SPACE: 2471 sqft |
| GARAGE: 629 sqft |
| OPENED PORCH (WITH ROOF) : 191 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| Total Square Footage: 3411 sqft |
| Block: 00780 |
| Subdivision: - |
| Job Phone: 904-268-7730 |
| Location Address: 164 SECRETARY TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/14/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD RD STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 03/29/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Read Project Status Notes SWALE NEED TO BE SODDED EMPTY LOT NEED TO BE SEEDED AND COVER WITH STRAW DITCH LINE IN THE BACK AND ON THE SIDE NEED TO BE SODDED NO SEEDED OR COVER WITH STRAW REMOVE THE POTTY FROM THE DITCH LINE AND PLACE ON THE DRIVEWAY 03/25/2021 NEED TO REMOVE THE STRAW FROMTHE DITCH LINE BACK AND ON THE SIDE AND Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion (300.02) V-20 CITY TECHNICAL MANUAL | |||
| U -UTILITY RESIDENTIAL FINAL | 03/29/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 03/25/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: Read Project Status Notes SWALE NEED TO BE SODDED EMPTY LOT NEED TO BE SEEDED AND COVER WITH STRAW DITCH LINE IN THE BACK AND ON THE SIDE NEED TO BE SODDED NO SEEDED OR COVER WITH STRAW REMOVE THE POTTY FROM THE DITCH LINE AND PLACE ON THE DRIVEWAY 03/25/2021 NEED TO REMOVE THE STRAW FROMTHE DITCH LINE BACK AND ON THE SIDE AND Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion (300.02) V-20 CITY TECHNICAL MANUAL | |||
| BLD - BUILDING FINAL | 03/25/2021 | FINAL APPROVED | TSTAUFFACHER |
| ROW - FINAL APRON (AFTER POUR) | 03/25/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: COLVERT PIPE ELEVATION IS GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/22/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A DUPLICATE INSPECTION IT PASS ALREADY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/22/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A DUPLICATE INSPECTION IT PASS ALREADY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/18/2021 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/18/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: SWALE NEED TO BE SODDED EMPTY LOT NEED TO BE SEEDED AND COVER WITH STRAW DITCH LINE IN THE BACK AND ON THE SIDE NEED TO BE SODDED NO SEEDED OR COVER WITH STRAW REMOVE THE POTTY FROM THE DITCH LINE AND PLACE ON THE DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 02/12/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION House is not ready 2/10/21 Front coach lights, front porch lights and floor outlet not safed off. 2/11/21 Front coach lights need to be safed off. 2/12/21 EMAILED FPL RELEASED POWER 3:25 | |||
| ELECTRIC - EARLY POWER | 02/11/2021 | Disapproved - NO FEE | JMUNSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION House is not ready 2/10/21 Front coach lights, front porch lights and floor outlet not safed off. 2/11/21 Front coach lights need to be safed off. | |||
| ELECTRIC - EARLY POWER | 02/10/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: THIS IS A REINSPECTION House is not ready 2/10/21 Front coach lights, front porch lights and floor outlet not safed off. | |||
| ELECTRIC - EARLY POWER | 02/01/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: House is not ready | |||
| U-CROSS CONNECTION | 02/01/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN. | |||
| U - SEWER TIE IN | 01/25/2021 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION TAP NOT MADE YET | |||
| U - SEWER TIE IN | 01/11/2021 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: TAP NOT MADE YET | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION apron forms are not complete @ 11:16 am corrections were made pipe is good | |||
| ROW- PRE-APRON (PRE-POUR) | 01/04/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: apron forms are not complete @ 11:16 am | |||
| INSULATION | 12/30/2020 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 12/23/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION Fill open void in kitchen floor slab at plumbing vent. Plans call for Bori-Care but no notification on site for treatment. 12-23-2020... deficiencies noted above resolved | |||
| ALL ROUGH | 12/21/2020 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Fill open void in kitchen floor slab at plumbing vent. Plans call for Bori-Care but no notification on site for treatment. | |||
| LATH/BRICK/ WATER BARRIER | 12/21/2020 | APPROVED | TSTAUFFACHER |
| ROW- PROJECT STATUS | 12/17/2020 | APPROVED - AS NOTED | CTROHA |
| Note: Met on site with Holy Rogers and the grade contractor to determine the best course of action for the drainage at the rear of the property and left property line. I informed them they could alter the proposed drainage plan and submit a revision. We dicussed moving the location of the top of bank back closer to the ditch while maintaining a 4;1 (maintainable slope) as best as possible. Also move the drianage conveyance along the left property to dain down the left property line. | |||
| ROOF VALLEY & METAL | 12/16/2020 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/01/2020 | APPROVED | JBODEN |
| TIE BEAM / LINTEL | 11/17/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/30/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/26/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/26/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 09/22/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/12/2021 | 01/13/2021 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/12/2021 | 01/14/2021 |
| Note: Released By: CTROHA I made a site visit with Holly on 12/17/2020 she explained to me that she was going to revise site plan to match the changes in the field and I do not see the changes reflecting on this site plan. According to the city's minimum requirements I cannot hold this siteplan for review but it will hold up the closing if the final does not match what was proposed | |||
| ZON | COMPLETE | 12/08/2020 | 12/08/2020 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 12/08/2020 | 12/15/2020 |
| Note: Released By: FREODICA Revision - screened porch. | |||
| ENGIN1 | COMPLETE | 11/13/2020 | 11/16/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 11/13/2020 | 11/13/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 10/28/2020 | 11/04/2020 |
| Note: Released By: FREODICA Revision 1 dated 10-28-20 due to customer changes. | |||
| PLFM | COMPLETE | 09/10/2020 | 09/10/2020 |
| Note: Released By: JMYERS Per the LOMR from FEMA, the entire property is removed from the SFHA. No elevation certificates, or Floodway Encroachment Analysis will be required. | |||
| ZON | COMPLETE | 04/10/2020 | 04/13/2020 |
| Note: Released By: AMOBLEY | |||
| PLFM | HOLD | 04/10/2020 | 04/13/2020 |
| Note: Held By: JMYERS It is the responsibility of the applicant per 10.02.07.D in the LDC to obtain a LOMA due to the location of the structure being in a Regulatory Floodway. This is for non-improved land that has supporting data to reflect that the floodway has been misrepresented on the FIRM. The applicant must secure this determination prior to constructing on the property. Submittal and acceptance of the LOMA will be required prior to issuing a building permit. If the LOMA removes the entire lot from the Regulatory Floodway, a Floodway Encroachment Analysis will no longer be required. | |||
| SW1 | COMPLETE | 04/10/2020 | 04/14/2020 |
| Note: Released By: CTROHA | |||
| ENGIN1 | COMPLETE | 04/10/2020 | 04/13/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 04/07/2020 | 05/15/2020 |
| Note: Released By: TBAKER | |||
| PLFM | HOLD | 04/07/2020 | 04/07/2020 |
| Note: Held By: JMYERS Per FEMA FIRMs, this property falls within a Regulatory Floodway. Please submit a revised Site Plan that shows the Regulatory Floodway. Should the structure or site disturbances fall within the Regulatory Floodway, a Floodway Encroachment Analysis will be required, done by a Florida licensed engineer, that demonstrates the proposed development will not cause an increase in base flood elevations. Dually, this data must then be submitted to FEMA in support of a Letter of Map Change per 10.02.07.C.1 and 10.02.07.D in the LDC. | |||
| BLD | COMPLETE | 04/06/2020 | 04/07/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/06/2020 | 04/07/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 04/06/2020 | 04/08/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 04/06/2020 | 04/07/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 04/06/2020 | 04/07/2020 |
| Note: Released By: HHAND | |||
| MECH | COMPLETE | 04/06/2020 | 04/07/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 04/06/2020 | 04/07/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 04/06/2020 | 04/09/2020 |
| Note: Held By: CTROHA Sod Elevation adjacent to the structure needs to be 5" lower than FFE | |||
| UD1 | COMPLETE | 04/06/2020 | 04/09/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 04/06/2020 | 04/07/2020 |
| Note: Held By: AMOBLEY This lot is in a flood zone. Survey should have that information. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 03/30/2021 |
| REINSPECTION FEE | ¤40.00 | 03/24/2021 |
| REINSPECTION FEE | ¤40.00 | 03/24/2021 |
| REINSPECTION FEE | ¤40.00 | 03/24/2021 |
| REINSPECTION FEE | ¤40.00 | 03/24/2021 |
| REVISION | ¤40.00 | 03/24/2021 |
| REVISION | ¤40.00 | 03/24/2021 |
| SITE PLAN 20 | ¤20.00 | 09/14/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/14/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/14/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/14/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤626.00 | 09/14/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/14/2020 |
| SEWER CREDIT | (¤1,700.00) | 09/14/2020 |
| SEWER INSPECTION | ¤25.00 | 09/14/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/14/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/14/2020 |
| METER - DEPOSIT | ¤60.00 | 09/14/2020 |
| WATER- TURN ON | ¤25.00 | 09/14/2020 |
| ADMIN FEE | ¤20.00 | 09/14/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/14/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 09/14/2020 |
| BUILDING DISCOUNT 100% | (¤1,514.60) | 09/14/2020 |
| ELECTRIC FEE | ¤247.80 | 09/14/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/14/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/14/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/14/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/14/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/14/2020 |
| MECHANICAL FEE | ¤247.80 | 09/14/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/14/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/14/2020 |
| PLAN CHECK FEE | ¤125.20 | 09/14/2020 |
| PLUMBING FEE | ¤247.80 | 09/14/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,096.35 |