Permit #2020040301
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7029-00210-0040 |
| CONDITIONED SPACE: 1541 sqft |
| OPENED PORCH (WITH ROOF) : 223 sqft |
| GARAGE: 578 sqft |
| CONDITIONED SPACE: 252 sqft |
| Total Square Footage: 2594 sqft |
| Block: 00210 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Location Address: 65 RYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/26/2020 |
| NOC: RECORDED |
| Applicant name: NO CONTRACTOR OF RECORD |
| Owner: NOVAKOWSKI RICHARD V & MARIA GRENADA H&W |
|
Address 11631 SW 2ND STREET APT 206 PEMBROKE PINES, FL 33025 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤260,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
NO CONTRACTOR OF RECORD
| Status | State License Number |
| CANCEL | CGC1111111 (Exp: 05/20/2016) |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
WILLIAM D ALLEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
546 S. SHELL ROAD DEBARY, FL 32713 |
LQ27843 (Exp: 08/13/2024) | 386-668-9592 | (386)668-8577 |
Inspection History
| Type | Request Date | Result | Inspector |
| TIE BEAM / LINTEL | 09/30/2020 | APPROVED | JBODEN |
| FOUND SURVEY APPROVED (OFFICE) | 09/17/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/19/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/11/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/01/2020 | APPROVED | CSTONE |
| ELECTRIC TEMP POLE | 06/26/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:54 am | |||
| ELECTRIC - EARLY POWER | |||
| GAS ROUGH | |||
| GAS FINAL | |||
| GRAVITY SEWER TEST | |||
| FINAL SURVEY (OFFICE USE ONLY) | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/16/2020 | 09/16/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 05/13/2020 | 05/13/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 04/29/2020 | 04/29/2020 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 04/28/2020 | 04/28/2020 |
| Note: Held By: ELENS All comments have been addressed. Termination of easement documents have been received. The permit is now on hold for Zoning to obtain release of easements from City Utilities and to prepare the termination of easement agreement. Contractor will be contacted once the agreement is ready for signatures. | |||
| SW1 | COMPLETE | 04/28/2020 | 04/29/2020 |
| Note: Released By: CTROHA | |||
| MECH | COMPLETE | 04/28/2020 | 04/29/2020 |
| Note: Released By: CPISCITELLI | |||
| ELEC | HOLD | 04/28/2020 | 04/28/2020 |
| Note: Held By: JMUNSON Riser diagram says 300 amp service load calcs say 150. You need to say what size service is being installed on the home. | |||
| BLD | COMPLETE | 04/28/2020 | 05/04/2020 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/28/2020 | 05/04/2020 |
| Note: Released By: FREODICA | |||
| SWALE | COMPLETE | 04/09/2020 | 05/19/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 04/08/2020 | 04/16/2020 |
| Note: Held By: FREODICA Sheet A-3 : Floor plan 1. It appears there is fireplace at great room but not identified. If there is, provide manufacturer specifications and installation instructions. If gas is required for heating, provide gas riser diagram, size and location of tank on site plan, and gas sub-contractor per FS 489/FBCFG 6th ed. chapter 4. 2. Provide lavatory in toilet room at gym fitness area for sanitation purposes per FBCR 6th ed. sec. R306.1. Coordinate with plumbing for DWV riser diagram. FReodica -386-986-4734 | |||
| CUSVC | COMPLETE | 04/08/2020 | 04/08/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 04/08/2020 | 04/14/2020 |
| Note: Held By: JMUNSON Riser Diagram and load calculations do not match | |||
| ENGIN1 | COMPLETE | 04/08/2020 | 04/09/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 04/08/2020 | 04/16/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 04/08/2020 | 04/09/2020 |
| Note: Held By: CPISCITELLI 1. Plans show spray foam insulation on roof deck. Energy calcs say R30. Revise to match. 2. Energy Calcs and EPL card need to be signed by the builder. | |||
| PLUM | HOLD | 04/08/2020 | 04/16/2020 |
| Note: Held By: FREODICA Laundry tub is shown on sanitary riser diagram but not shown on floor plan. Coordinate for clarity per FBC 6th ed. sec. 107.2.1. FReodicaa-386-986-4734 | |||
| SW1 | HOLD | 04/08/2020 | 04/09/2020 |
| Note: Held By: CTROHA Applicant must match existing elevations at the property line of improved lots | |||
| UD1 | COMPLETE | 04/08/2020 | 04/16/2020 |
| Note: Released By: MBACON | |||
| ZON | HOLD | 04/08/2020 | 04/09/2020 |
| Note: Held By: AMOBLEY Please provide termination of easement application and letters from utilities releasing the easement for us to draw of the agreement and have city utilities release it as well Landscape says paver driveway but site plan says concrete. Please correct whichever is wrong If installing a paver driveway a right of way agreement must be signed by all owners and notarized then turned in to us for recording Landscape plan says 16 foundation plantings but only show 14 around foundation Garage space can not exceed fifty percent of the living square footage of house |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 05/26/2020 |
| WATER- TURN ON | ¤25.00 | 05/26/2020 |
| ADMIN FEE | ¤20.00 | 05/26/2020 |
| CONNECTION FEES | ¤1,002.88 | 05/26/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/26/2020 |
| ELECTRIC FEE | ¤216.00 | 05/26/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 05/26/2020 |
| IMPACT FEE FIRE | ¤223.38 | 05/26/2020 |
| IMPACT FEE PARKS | ¤849.24 | 05/26/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/26/2020 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 05/26/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 05/26/2020 |
| MECHANICAL FEE | ¤216.00 | 05/26/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/26/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/26/2020 |
| PLAN CHECK FEE | ¤104.00 | 05/26/2020 |
| PLUMBING FEE | ¤216.00 | 05/26/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤520.00 | 05/26/2020 |
| SITE PLAN 20 | ¤20.00 | 05/26/2020 |
| SURCHARGE FS 533.721 | ¤12.08 | 05/26/2020 |
| SURCHARGE - FS 468.631 | ¤18.12 | 05/26/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/26/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 05/26/2020 |
| SEWER CREDIT | (¤1,466.00) | 05/26/2020 |
| SEWER INSPECTION | ¤25.00 | 05/26/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 05/26/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 05/26/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,404.05 |