Permit #2020040552
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00360-0140 |
| CONDITIONED SPACE: 1723 sqft |
| GARAGE: 436 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| OPENED PORCH (WITH ROOF) : 218 sqft |
| Total Square Footage: 2440 sqft |
| Block: 00360 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-447-4151 |
| Location Address: 30 EASTWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/04/2020 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: SHRAGE,GENNADII & NIKOLAEVA,MARINA |
|
Address 50 LEANNI WAY PALM COAST, FL 32137 |
|
Address C-1 PALM COAST, FL 32137 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/26/2021 | FINAL APPROVED | MMESSER |
| U-CROSS CONNECTION | 01/15/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/15/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 01/07/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END trash in the swale needs to be cleaned up | |||
| ROW - FINAL APRON (AFTER POUR) | 01/07/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/06/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 01/06/2021 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 12/01/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 2:30 pm | |||
| ROW- PRE-APRON (PRE-POUR) | 11/25/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: PLEASE IF A RAIN BEFORE POUR CONCRETE, CHECK THE PIPE ELEVATION AGAIN | |||
| U - SEWER TIE IN | 10/23/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/23/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/30/2020 | APPROVED - AS NOTED | CSTONE |
| Note: TEMP. POWER WILL NEED TO MOVE PLEASE EMAIL ESERRANO@PALMCOASTGOV.COM WHEN THIS HAS BEEN DONE. | |||
| INSULATION | 09/25/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION Electrical wiring penetrations at top plate near master door need to be fire foamed. 9-25-2020... Deficiencies notred above resolved | |||
| INSULATION | 09/23/2020 | Disapproved -FEE REQUIRED | MMESSER |
| Note: Electrical wiring penetrations at top plate near master door need to be fire foamed. | |||
| LATH/BRICK/ WATER BARRIER | 09/18/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 09/14/2020 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 08/28/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Not ready. Still working at the time of my visit. 8/20/20 - Remove Shiners on roof above garage ans where needs it. Garage Wall Detail shows SP1's and SP2's (top) not H2's Cannot confirm straps according to Entry Detail. Covered up. 8/25/20 - Items corrected. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/20/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION Not ready. Still working at the time of my visit. 8/20/20 - Remove Shiners on roof above garage ans where needs it. Garage Wall Detail shows SP1's and SP2's (top) not H2's Cannot confirm straps according to Entry Detail. Covered up. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Not ready. Still working at the time of my visit. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/18/2020 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 07/31/2020 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 06/25/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/15/2020 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 06/09/2020 | APPROVED | FWILLIS |
| WATER METER INSTALLATION REQUEST | 05/20/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/18/2020 | 08/18/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 08/18/2020 | 08/18/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: CTROHA | |||
| MECH | COMPLETE | 04/22/2020 | 04/22/2020 |
| Note: Released By: CPISCITELLI | |||
| ELEC | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 04/22/2020 | 04/22/2020 |
| Note: Released By: AMOBLEY | |||
| UD1 | COMPLETE | 04/22/2020 | 04/23/2020 |
| Note: Released By: AHALL | |||
| ENGIN1 | COMPLETE | 04/22/2020 | 04/22/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 04/16/2020 | 05/27/2020 |
| Note: Released By: TBAKER | |||
| PLENV | COMPLETE | 04/16/2020 | 04/16/2020 |
| Note: Released By: JMYERS Staff conducted a site visit on 4/16/2020 and noted no Gopher Tortoise or their burrows on the property. Staff suggests that silt fence be put up to ensure that no Gopher Tortoise move into the lot prior to clearing. | |||
| BLD | COMPLETE | 04/15/2020 | 04/21/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/15/2020 | 04/16/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 04/15/2020 | 04/17/2020 |
| Note: Held By: JMUNSON Need to verify that solar permit will be pulled seperatly. | |||
| ENGIN1 | COMPLETE | 04/15/2020 | 04/16/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 04/15/2020 | 04/16/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 04/15/2020 | 04/17/2020 |
| Note: Held By: CPISCITELLI Energy calcs and EPL card need to be signed by the builder | |||
| PLUM | COMPLETE | 04/15/2020 | 04/21/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 04/15/2020 | 04/15/2020 |
| Note: Held By: CTROHA Applicant must match existing elevations at the property line of improved lots | |||
| UD1 | COMPLETE | 04/15/2020 | 04/17/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 04/15/2020 | 04/16/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/29/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 05/04/2020 |
| SITE PLAN 20 | ¤20.00 | 05/04/2020 |
| SURCHARGE FS 533.721 | ¤11.70 | 05/04/2020 |
| SURCHARGE - FS 468.631 | ¤17.55 | 05/04/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/04/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 05/04/2020 |
| SEWER CREDIT | (¤850.00) | 05/04/2020 |
| SEWER INSPECTION | ¤25.00 | 05/04/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 05/04/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 05/04/2020 |
| METER - DEPOSIT | ¤60.00 | 05/04/2020 |
| WATER- TURN ON | ¤25.00 | 05/04/2020 |
| ADMIN FEE | ¤20.00 | 05/04/2020 |
| CONNECTION FEES | ¤1,002.88 | 05/04/2020 |
| ELECTRIC FEE | ¤210.00 | 05/04/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 05/04/2020 |
| IMPACT FEE FIRE | ¤223.38 | 05/04/2020 |
| IMPACT FEE PARKS | ¤849.24 | 05/04/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/04/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 05/04/2020 |
| MECHANICAL FEE | ¤210.00 | 05/04/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/04/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/04/2020 |
| PLAN CHECK FEE | ¤100.00 | 05/04/2020 |
| PLUMBING FEE | ¤210.00 | 05/04/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,941.60 |