I want to search for...
Permit #2020040641
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00060-0160 |
| CONDITIONED SPACE: 1580 sqft |
| CONDITIONED SPACE: 1580 sqft |
| GARAGE: 530 sqft |
| GARAGE: 468 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| OPENED PORCH (WITH ROOF) : 147 sqft |
| OPENED PORCH (WITH ROOF) : 147 sqft |
| Total Square Footage: 4580 sqft |
| Block: 00060 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386)446-5161 |
| Location Address: 10 EMMONS LN |
| Type: DU - DUPLEX |
| Issue Date: 04/28/2020 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: SHODAN PROPERTIES LLC |
|
Address 6 EVANSMILL LANE PALM COAST, FL 32164 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/05/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 03/05/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 03/03/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Bare earth in swale across the street was from the city utility tie-in. | |||
| U-CROSS CONNECTION | 03/03/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation. No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/03/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/02/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/02/2021 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 01/27/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:00 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/15/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THE MITERED END IS NOT BUILT TO HOLD CONCRETE FROM SPILLING INTO THE SWALE BY GOING UNDER THE FORM BOARDS AT BOTH MITERED ENDS PIPE IS AT GOOD ELEVATION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/15/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THE MITERED END IS NOT BUILT TO HOLD CONCRETE FROM SPILLING INTO THE SWALE BY GOING UNDER THE FORM BOARDS AT BOTH MITERED ENDS 1/15/2021 CORRECTIONS MADE PIPE IS AT GOOD ELEVATION | |||
| U - SEWER TIE IN | 12/22/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/22/2020 | APPROVED | JGIBSON |
| INSULATION | 11/03/2020 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 10/29/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 10/29/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 10/20/2020 | APPROVED | FWILLIS |
| FIREWALL | 10/12/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/05/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Rod Couplings Missing as per Detail. (Highlighted) Truss's at Garage Door Entry not matching Truss Layout. 10 Plus, Retro Fitted Straps (both Units) Retro fitted straps are wrong type. Should be wood to CMU straps and must be installed as per manuf. spec. Need Detail Sheet for Bearing wall showing top plate connections to Truss's. INSPECTION STOPPED | |||
| ROOF VALLEY & METAL | 09/16/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/16/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Rod Couplings Missing as per Detail. (Highlighted) Truss's at Garage Door Entry not matching Truss Layout. 10 Plus, Retro Fitted Straps (both Units) Retro fitted straps are wrong type. Should be wood to CMU straps and must be installed as per manuf. spec. Need Detail Sheet for Bearing wall showing top plate connections to Truss's. INSPECTION STOPPED | |||
| TIE BEAM / LINTEL | 07/30/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 06/29/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/11/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/26/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 05/04/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/24/2020 | 10/01/2020 |
| Note: Released By: FREODICA Revision 2 dated 9-24-20 Sheets 3 &4 of 5 - changed interior bearing wall det. & truss layout/connectors. | |||
| BLD | COMPLETE | 09/09/2020 | 09/15/2020 |
| Note: Released By: FREODICA Revision: changed separation wall detail. | |||
| ZON | COMPLETE | 06/26/2020 | 06/26/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 06/26/2020 | 06/29/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 04/24/2020 | 04/27/2020 |
| Note: Released By: CTROHA | |||
| SWALE | COMPLETE | 04/21/2020 | 06/04/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 04/17/2020 | 04/23/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/17/2020 | 04/17/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 04/17/2020 | 04/21/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 04/17/2020 | 04/21/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 04/17/2020 | 04/21/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 04/17/2020 | 04/20/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 04/17/2020 | 04/23/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 04/17/2020 | 04/21/2020 |
| Note: Held By: CTROHA Sec.300.03 Maintain a thrnth of fall per every 20' | |||
| UD1 | COMPLETE | 04/17/2020 | 04/21/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 04/17/2020 | 04/17/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 03/10/2021 |
| REVISION | ¤40.00 | 03/10/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 03/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤77.94) | 04/28/2020 |
| SEWER CREDIT | (¤1,700.00) | 04/28/2020 |
| SEWER INSPECTION | ¤25.00 | 04/28/2020 |
| SEWER CAPITAL FACILITY | ¤9,192.14 | 04/28/2020 |
| WATER CAPITAL FACILITY FEE | ¤6,748.36 | 04/28/2020 |
| SITE PLAN 20 | ¤20.00 | 04/28/2020 |
| SURCHARGE FS 533.721 | ¤17.74 | 04/28/2020 |
| SURCHARGE - FS 468.631 | ¤26.61 | 04/28/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/28/2020 |
| METER - DEPOSIT | ¤120.00 | 04/28/2020 |
| WATER- TURN ON | ¤50.00 | 04/28/2020 |
| ADMIN FEE | ¤20.00 | 04/28/2020 |
| CONNECTION FEES | ¤2,005.76 | 04/28/2020 |
| ELECTRIC FEE | ¤305.40 | 04/28/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤13.40) | 04/28/2020 |
| IMPACT FEE FIRE | ¤446.76 | 04/28/2020 |
| IMPACT FEE PARKS | ¤1,698.48 | 04/28/2020 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 04/28/2020 |
| IMPACT FEE TRANSPORTATION | ¤2,598.00 | 04/28/2020 |
| MECHANICAL FEE | ¤305.40 | 04/28/2020 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/28/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 04/28/2020 |
| PLAN CHECK FEE | ¤163.60 | 04/28/2020 |
| PLUMBING FEE | ¤305.40 | 04/28/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤818.00 | 04/28/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,474.36 |