Permit #2020040784

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00270-0170
CONDITIONED SPACE: 2026 sqft
GARAGE: 685 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
SCREEN PORCH (SOLID ROOF) : 356 sqft
Total Square Footage: 3127 sqft
Block: 00270
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 386-960-7720
Location Address: 27 RED BARN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/21/2020
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC A FLORIDA CORP

Address

620 MALABAR ROAD SE SUITE 5

PALM BAY, FL 32907

Lot: 0170
Contracted Stated Job Value: ¤264,675.00
Job Description: Single Family Residence
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

DOUGLAS EDWARD RICHARDS
Status Location Address State License Number Phone Fax
INACTIVE

108 E INDIANA AVENUE

DELAND, FL 32724

CCC1328824 (Exp: 08/31/2024) 386-736-4226 386-740-0535
STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/13/2020 FINAL APPROVED JCOLASANTI
U-CROSS CONNECTION 11/13/2020 APPROVED - AS NOTED DHANEY
Note: Approved No IRR. No Cross CN.
U -UTILITY RESIDENTIAL FINAL 11/12/2020 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 11/10/2020 APPROVED GBERTOLA
ROW - STORMWATER FINAL 11/10/2020 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 11/10/2020 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 11/10/2020 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 10/26/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:10
GRAVITY SEWER TEST 10/19/2020 APPROVED JGIBSON
U - SEWER TIE IN 10/19/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 10/13/2020 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
LATH/BRICK/ WATER BARRIER 09/16/2020 APPROVED MMESSER
INSULATION 09/09/2020 APPROVED MMESSER
INSULATION 09/08/2020 CANCELLED BY APPLICANT WEB
PEP TANK INSTALLATION REQUEST 09/03/2020 APPROVED CSTONE
ALL ROUGH 09/02/2020 APPROVED MMESSER
ROOF VALLEY & METAL 08/26/2020 Disapproved - NO FEE MMESSER
Note: Not ready for inspection (no metal or paper lining at valleys).
ROOF VALLEY & METAL 08/26/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION Not ready for inspection (no metal or paper lining at valleys).
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/21/2020 APPROVED MMESSER
TIE BEAM / LINTEL 08/05/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 07/31/2020 APPROVED TBAKER
MONOLITHIC SLAB 07/14/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 07/10/2020 APPROVED MMESSER
WATER METER INSTALLATION REQUEST 06/24/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 07/30/2023 07/30/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 07/30/2020 07/31/2020
Note: Released By: TBAKER
PLUM COMPLETE 05/01/2020 05/01/2020
Note: Released By: PBUCKLEY
CUSVC COMPLETE 04/28/2020 04/28/2020
Note: Released By: HHAND
MECH COMPLETE 04/28/2020 04/29/2020
Note: Released By: CPISCITELLI
BLD COMPLETE 04/28/2020 04/28/2020
Note: Released By: JPI
ELEC COMPLETE 04/28/2020 04/28/2020
Note: Released By: JMUNSON
PLUM HOLD 04/28/2020 04/28/2020
Note: Held By: JPI 1. Plumbing - On the riser diagram, please provide an air gap for the washing machine. The washing machine connects at a tee with another fixture and the washing machine has pressurized flow. Consider connecting the LT fixture downstream to if an air gap is not preferred. R2902
BLD HOLD 04/22/2020 04/23/2020
Note: Held By: STHOMAS o Please separate your plans into individual pages and name them according to the document submittal guidelines - http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o Please note, if sealed copies are required for submittal, each page will require a digital signature and seal.
CUSVC HOLD 04/22/2020 04/22/2020
Note: Held By: HHAND Utility application is missing the property address and the property parcel number. Please correct and upload a new application.
ELEC HOLD 04/22/2020 04/23/2020
Note: Held By: STHOMAS o Please separate your plans into individual pages and name them according to the document submittal guidelines - http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o Please note, if sealed copies are required for submittal, each page will require a digital signature and seal.
ENGIN1 COMPLETE 04/22/2020 04/22/2020
Note: Released By: TBAKER
LOCATE COMPLETE 04/22/2020 04/24/2020
Note: Released By: CSTONE o Please separate your plans into individual pages and name them according to the document submittal guidelines - http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o Please note, if sealed copies are required for submittal, each page will require a digital signature and seal.
MECH HOLD 04/22/2020 04/23/2020
Note: Held By: CPISCITELLI Orientation of Energy calcs does not match the site plan. Revise to match
PLUM HOLD 04/22/2020 04/23/2020
Note: Held By: STHOMAS o Please separate your plans into individual pages and name them according to the document submittal guidelines - http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o Please note, if sealed copies are required for submittal, each page will require a digital signature and seal.
SW1 COMPLETE 04/22/2020 04/23/2020
Note: Released By: CTROHA
UD1 COMPLETE 04/22/2020 04/27/2020
Note: Released By: AHALL o Please separate your plans into individual pages and name them according to the document submittal guidelines - http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o Please note, if sealed copies are required for submittal, each page will require a digital signature and seal.
ZON COMPLETE 04/22/2020 04/22/2020
Note: Released By: ELENS
SWALE COMPLETE 04/22/2020 06/08/2020
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 05/21/2020
WATER- TURN ON ¤25.00 05/21/2020
ADMIN FEE ¤20.00 05/21/2020
CONNECTION FEES ¤1,002.88 05/21/2020
ELECTRIC FEE ¤218.81 05/21/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 05/21/2020
IMPACT FEE FIRE ¤223.38 05/21/2020
IMPACT FEE PARKS ¤849.24 05/21/2020
IMPACT FEE SCHOOL ¤3,600.00 05/21/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 05/21/2020
MECHANICAL FEE ¤218.80 05/21/2020
WATER -IRRIGATION INSPECTION ¤25.00 05/21/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/21/2020
PLAN CHECK FEE ¤105.87 05/21/2020
PLUMBING FEE ¤218.80 05/21/2020
NEW RESIDENTIAL INSPECTIONS ¤529.35 05/21/2020
SITE PLAN 20 ¤20.00 05/21/2020
SURCHARGE FS 533.721 ¤12.26 05/21/2020
SURCHARGE - FS 468.631 ¤18.39 05/21/2020
STORM WATER PERMIT FEES ¤80.00 05/21/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 05/21/2020
SEWER CREDIT (¤1,779.66) 05/21/2020
SEWER INSPECTION ¤25.00 05/21/2020
SEWER CAPITAL FACILITY ¤4,596.07 05/21/2020
WATER CREDIT (¤761.34) 05/21/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 05/21/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,273.63