Permit #2020040842

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-RP11I-0021
Total Square Footage: 1490 sqft
Block: RP11I
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 386-313-6950
Location Address: 1225 ROYAL PALMS PT
Type: CA - COMM ADDITION
Issue Date: 07/13/2020
NOC: RECORDED
Applicant name: MARK ANTHONY LANGELLO
Owner: GRACE PRESBYTERIAN CHURCH OF PALM COAST FLORIDA IN

Address

1225 ROYAL PALMS PKWY

PALM COAST, FL 32164

Lot: 0021
Contracted Stated Job Value: ¤190,000.00
Job Description: ADDITION -FELLOWSHIP HALL & KITCHEN
Type: CN

Contractor

M & M DEVELOPMENT & CONSTRUCTION LLC
Status Location Address State License Number Phone
CANCEL

2323 N. STATE ST

BUNNELL, FL 32110

RG291103911 (Exp: 08/31/2023) 386-313-6950

Sub Contractors

GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
ROBERT CARLTON LITTLE
Status Location Address State License Number Phone
ACTIVE

3050 EAST MOODY BLVD

BUNNELL, FL 32110

EC13003740 (Exp: 08/31/2026) 386-931-1708

Inspection History

Type Request Date Result Inspector
STORMWATER FINAL 03/02/2021 APPROVED GBERTOLA
Note: EVRETHING IS GOOD
FINAL SURVEY - OFFICE USE ONLY 03/02/2021 APPROVED - AS NOTED GBERTOLA
Note: I CAN'T PUT FINAL SURVEY INSPECTION EVRETHING IS GOOD
ELECTRIC FINAL 02/18/2021 APPROVED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION APPROVED ELECTRICAL PLAN AND PANEL SCHEDULE DOES NOT SHOW THE ADDITION OF THE 2ND AIR HANDLER AND A/C UNIT, NEED TO REVISE THE ELECTRICAL LOAD CALCULATIONS ALSO SHOWING THE CHANGE TO MAKE SURE THE 125A MAIN BREAKER WILL SUPPORT THE ADDITIONAL LOAD ON BOTH AIR HANDLERS AND A/C UNITS
BUILDING FINAL 02/18/2021 FINAL APPROVED JBODEN
Note: THIS IS A REINSPECTION
FIRE FINAL 02/18/2021 APPROVED JBODEN
Note: THIS IS A REINSPECTION
HVAC FINAL 02/17/2021 FINAL APPROVED CPISCITELLI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Did not change heat strips to match engineer letter
HVAC FINAL 02/08/2021 Disapproved -FEE REQUIRED CPISCITELLI
Note: THIS IS A REINSPECTION Did not change heat strips to match engineer letter
ELECTRIC FINAL 02/08/2021 CANCELLED BY APPLICANT RMARTIN
Note: THIS IS A REINSPECTION APPROVED ELECTRICAL PLAN AND PANEL SCHEDULE DOES NOT SHOW THE ADDITION OF THE 2ND AIR HANDLER AND A/C UNIT, NEED TO REVISE THE ELECTRICAL LOAD CALCULATIONS ALSO SHOWING THE CHANGE TO MAKE SURE THE 125A MAIN BREAKER WILL SUPPORT THE ADDITIONAL LOAD ON BOTH AIR HANDLERS AND A/C UNITS
FIRE FINAL 02/08/2021 CANCELLED BY APPLICANT JBODEN
BUILDING FINAL 02/08/2021 CANCELLED BY APPLICANT JBODEN
U - UTILITY COMMERCIAL FINAL 02/08/2021 FINAL APPROVED LFITZGERALD
LDSC- LANDSCAPE FINAL 01/20/2021 FINAL APPROVED LFITZGERALD
ELECTRIC FINAL 01/20/2021 Disapproved - NO FEE RMARTIN
Note: APPROVED ELECTRICAL PLAN AND PANEL SCHEDULE DOES NOT SHOW THE ADDITION OF THE 2ND AIR HANDLER AND A/C UNIT, NEED TO REVISE THE ELECTRICAL LOAD CALCULATIONS ALSO SHOWING THE CHANGE TO MAKE SURE THE 125A MAIN BREAKER WILL SUPPORT THE ADDITIONAL LOAD ON BOTH AIR HANDLERS AND A/C UNITS
PLUMBING FINAL 01/20/2021 APPROVED JGIBSON
HVAC FINAL 01/20/2021 Disapproved -FEE REQUIRED CPISCITELLI
Note: Missing volume dampers in fresh air and supply ducts
BLD - SEWER TIE IN 01/08/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS FOR GREASE AND SEWER TIE IN TO EXISTING GREASE AND SANITARY SEWER
ROOF VALLEY & METAL 10/16/2020 APPROVED JBODEN
INSULATION 10/09/2020 APPROVED MMESSER
LATH/BRICK/WATER BARRIER 10/09/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Need Expansion Joint on Gable as per plan and FBC. ADDED INSPECTION PER FOREST
LATH/BRICK/WATER BARRIER 10/08/2020 Disapproved - NO FEE FWILLIS
Note: Need Expansion Joint on Gable as per plan and FBC.
ELECTRIC 1ST ROUGH 10/06/2020 CANCELLED BY INSPECTOR JMUNSON
Note: Not needed. Needs to call in 2nd rough
ELECTRIC 2ND ROUGH 10/06/2020 APPROVED JMUNSON
HVAC ROUGH 10/06/2020 APPROVED JBODEN
PLUMBING 2ND ROUGH 10/06/2020 APPROVED JGIBSON
ALL ROUGH 10/06/2020 CANCELLED BY INSPECTOR JBODEN
ABOVE CEILING 10/06/2020 APPROVED - AS NOTED JBODEN
FOUND SURVEY APPROVED (OFFICE) 09/22/2020 APPROVED DRAMIREZ
ROOF SHEATHING / BRACE / TIE DOWN 08/28/2020 APPROVED MMESSER
Note: Remainder of work from partial ready
ROOF SHEATHING / BRACE / TIE DOWN 08/24/2020 PARTIALLY APPROVED FWILLIS
Note: Partial PARTIAL ROOFING ONLY SO CONTRACTOR CAN DRY-IN. STILL NEEDS BRACES, TIE DOWNS ETC.
LINTEL 08/14/2020 APPROVED MMESSER
Note: Please do inspection after 10 am
MONOLITHIC SLAB 08/11/2020 APPROVED MMESSER
Note: After 11:00 am if possible. Thank you.
PLUMBING 1ST ROUGH 08/05/2020 APPROVED JGIBSON

Review History

Department Status Date In Date Out
BLD COMPLETE 02/24/2021 02/26/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
PLENG COMPLETE 02/24/2021 02/26/2021
Note: Released By: DENNIS LEAP - - DLEAP@PALMCOASTGOV.COM
BADMIN HOLD 02/22/2021 02/22/2021
Note: Held By: LIBBY MUSGROVE - - lmusgrove@ci.palm-coast.fl.us Documents/Files named incorrectly Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf record retention accuracy. Please do not add anything to the file names
BADMIN COMPLETE 02/22/2021 02/22/2021
Note: Released By: LIBBY MUSGROVE - - lmusgrove@ci.palm-coast.fl.us
ELEC COMPLETE 02/05/2021 02/05/2021
Note: Released By: JMUNSON
DSD COMPLETE 09/21/2020 09/21/2020
Note: Released By: DRAMIREZ
BLD COMPLETE 09/04/2020 09/21/2020
Note: Released By: PBUCKLEY
PLENG COMPLETE 09/04/2020 09/08/2020
Note: Released By: DLEAP
BLD COMPLETE 07/28/2020 08/11/2020
Note: Released By: FREODICA Revision: moved slab 2 ft norh to align with existing bldg.
DSD HOLD 07/28/2020 07/28/2020
Note: Held By: JGONZALEZ Provide a revised site plan showing the relocation of the pad with it setbacks and dimensions.
ELEC COMPLETE 07/08/2020 07/09/2020
Note: Released By: JMUNSON
MECH COMPLETE 07/02/2020 07/06/2020
Note: Released By: CPISCITELLI
ELEC HOLD 07/02/2020 07/07/2020
Note: Held By: JMUNSON Load calcs done at the wrong volt amp. NEC 2014 art 220
ELEC HOLD 06/17/2020 06/23/2020
Note: Held By: JMUNSON 1. Show what size the existing service is. 2. Need show load calculations showing that the existing service can accommodate the new panel and its load. 2nd Request
MECH HOLD 06/17/2020 06/18/2020
Note: Held By: CPISCITELLI 1. Provide energy calcs showing equipment info on the summary short form. 2.. Provide Duct Drawing showing supply, return ans fresh air and ventilation. 3. Provide Manufacturers instructions for Warming Cabinet
FI1 COMPLETE 06/17/2020 06/30/2020
Note: Released By: WMILLER
PLUM COMPLETE 06/17/2020 06/22/2020
Note: Released By: PBUCKLEY
BLD COMPLETE 06/17/2020 06/22/2020
Note: Released By: PBUCKLEY
BADMIN COMPLETE 06/17/2020 06/17/2020
Note: Released By: LMUSGROVE
ARCHR COMPLETE 06/17/2020 06/17/2020
Note: Released By: BDAWSON
ARCHR COMPLETE 04/23/2020 05/05/2020
Note: Released By: BDAWSON
BLD HOLD 04/23/2020 05/08/2020
Note: Held By: FREODICA 1.Sheet LS: a. Identify the type of construction on the Code Analysis if it is Type IIIA or Type IIIB per FBC 6th Edition Table 601. b. Provide the total occupant load and total square footage of the new fellowship hall and existing adjacent church. This is required to determine if a fire sprinkler system is required per Section 903.2.1.3. If the intent is to not provide a fire sprinkler system throughout the church and fellowship hall, see comment a. below under Sheet A2a comments. c. Provide plumbing fixture calculations per Section 2902.1.1 and Table 2902.1 for both the church and fellowship hall in order to determine if fixtures in the fellowship hall in addition to those in the church provide sufficient fixtures for the new occupant load. d. Provide ASTM E119 or UL 263 2-hour fire-resistance rating of exterior walls to indicate compliance with FBC 6th Edition Section 602.3 and Table 601 as described in Section 703.3. You can use any of the six listed methods or procedures to determine the 2- hour fire-resistance rating. If referencing ASTM E119 or UL 263 provide complete listings. If providing designs from documented approved sources provide complete design details and references. 2. Sheet A2: a. Provide 2-hr fire resistance-rated fire barrier between new fellowship hall and existing adjacent church to create separate fire areas per FBC 6th Edition Table 601/707.3.10 and Table 707.3.10. b. Provide 2--hr fire-rated wall detail (fire barrier)per FBC 6th Edition Sec. 721/722 c. Provide automatic fire sprinkler system per FBC 6th Edition Sec. 903.2.1 depending on fire area and occupant load as mentioned above (LS b comment). 3. Provide Product approval for roofing material, underlayment, exterior windows and door, soffits, structural components such as wood connectors, wood anchors, truss plates and Administrative Code 9B-72. FReodica-386-986-4734
DSD COMPLETE 04/23/2020 04/24/2020
Note: Released By: JGONZALEZ
ELEC HOLD 04/23/2020 04/28/2020
Note: Held By: JMUNSON 1. Submit electrical plans. 2. Load Calcs to show new addition
FI1 HOLD 04/23/2020 05/07/2020
Note: Held By: WMILLER The combined occupant load of the existing building and addition will exceed the maximum threshold for fire sprinklers and alarms, and will need protection and notification under the provisions of [F] 903.2.1.3, [F] 907.2.1. Group A-3 or a fire barrier consistent with FBC 2017 707.3.10 and Table 707.3.10
MECH HOLD 04/23/2020 05/01/2020
Note: Held By: CPISCITELLI Submit Mechanical drawings and energy calcs for addition
PLUM HOLD 04/23/2020 05/07/2020
Note: Held By: FREODICA 1. Provide total occupant load of existing chapel and new fellowship hall to determine the required plumbing fixures for male and female such as water closet, urinal, lavatories (drinking fountain and service sink per FBCP 6th edition, sec. 403. 2. Provide sanitary, and domestic water (hot and cold) riser diagrams for the fellowship hall based item 1 above comment per FBC 6th ed. sec. 107.2.1. FReodica -386-986-4734
UD1 COMPLETE 04/23/2020 04/24/2020
Note: Released By: CJOHNSON

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/19/2021
REINSPECTION FEE ¤40.00 02/19/2021
REVISION ¤40.00 02/19/2021
SITE PLAN 20 ¤20.00 07/13/2020
SURCHARGE FS 533.721 ¤2.00 07/13/2020
SURCHARGE - FS 468.631 ¤2.00 07/13/2020
3% TRANS IMPACT FEE CREDIT (¤99.50) 07/13/2020
ADMIN COMMERCIAL ¤60.00 07/13/2020
INSPECTION - COMMERCIAL ADD ¤1,330.00 07/13/2020
BUILDING DISCOUNT 100% (¤2,130.50) 07/13/2020
ELECTRIC FEE ¤174.00 07/13/2020
3% FIRE IMPACT FEE CREDIT (¤12.74) 07/13/2020
IMPACT FEE FIRE ¤424.80 07/13/2020
IMPACT FEE TRANSPORTATION ¤3,316.50 07/13/2020
MECHANICAL FEE ¤174.00 07/13/2020
PLAN CHECK FEE ¤218.50 07/13/2020
PLUMBING FEE ¤174.00 07/13/2020
Fees Total Due: ¤0.00 Total Paid: ¤3,773.06