Permit #2020041002

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01020-0170
CONDITIONED SPACE: 2331 sqft
GARAGE: 610 sqft
OPENED PORCH (WITH ROOF) : 176 sqft
OPENED PORCH (WITH ROOF) : 96 sqft
Total Square Footage: 3213 sqft
Block: 01020
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: (386) 672-8285
Location Address: 82 EVANS DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/08/2020
NOC: RECORDED
Applicant name: JOSEPH TODD VANACORE
Owner: MILLER, LARRY & ANGELA

Address

LIFE ESTATE

JARRETTSVILLE, MD 21084

Address

1317 WILEY OAK DRIVE

JARRETTSVILLE, MD 21084

Lot: 0170
Contracted Stated Job Value: ¤258,900.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

VANACORE CONSTRUCTION INC.
Status Location Address Mailing Address State License Number Phone
INACTIVE

1451 N US HIGHWAY 1

Ormond Beach, FL 32174

SUITE 13

Ormond Beach, FL 32174

CBC058991 (Exp: 08/31/2024) (386) 672-8285

Sub Contractors

VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616
ALFRED N FYOCK JR
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

387 SAULS

ORMOND BEACH, FL 32174

ST

ORMOND BEACH, FL 32174

CCC1329075 (Exp: 08/31/2026) 386-566-6112 386-673-4299
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 12/18/2020 Approval - Private Provider PPROVIDER
HVAC FINAL 12/18/2020 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 12/18/2020 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 12/18/2020 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 12/16/2020 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 12/15/2020 APPROVED - AS NOTED KRUTH
Note: indentation in the back left side of the yard maybe a 5 gallon bucket of dirt to level the area spoke to super onsite and stated he would correct the issue in front of the tree planted in the back yard so it wouldnt hold water
ROW FIELD SURVEY /GRADING CERTIFICATION 12/11/2020 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 12/11/2020 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 12/09/2020 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION THERE IS CONCRETE OVER POUR ON THE MITERED ENDS OF THE PIPE THAT NEEDS TO BE CUT OFF FLUSH 12/9/2020CORRECTIONS MADE
U-CROSS CONNECTION 12/07/2020 APPROVED - AS NOTED JHARDING
Note: Approved. No cross connections.
ROW - FINAL APRON (AFTER POUR) 12/07/2020 Disapproved -FEE REQUIRED KRUTH
Note: THERE IS CONCRETE OVER POUR ON THE MITERED ENDS OF THE PIPE THAT NEEDS TO BE CUT OFF FLUSH
ELECTRIC - EARLY POWER 11/05/2020 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 11/02/2020 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 10/28/2020 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION 10/28/2020=correction made it
ROW- PRE-APRON (PRE-POUR) 10/27/2020 CANCELLED BY APPLICANT GBERTOLA
U - SEWER TIE IN 10/26/2020 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 10/26/2020 CANCELLED BY APPLICANT WEB
PEP TANK INSTALLATION REQUEST 09/02/2020 APPROVED CSTONE
INSULATION 08/26/2020 Approval - Private Provider PPROVIDER
ALL ROUGH 08/19/2020 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 08/12/2020 Approval - Private Provider PPROVIDER
EXTERIOR STRAP/CLIP 08/11/2020 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 07/29/2020 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/27/2020 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 07/13/2020 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 07/07/2020 APPROVED AMOBLEY
MONOLITHIC SLAB 06/22/2020 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 06/18/2020 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 06/02/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 07/06/2020 07/07/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 07/06/2020 07/07/2020
Note: Released By: TBAKER
ZON COMPLETE 05/08/2020 05/08/2020
Note: Released By: ELENS
SW1 COMPLETE 05/08/2020 05/08/2020
Note: Released By: CTROHA
SWALE COMPLETE 04/29/2020 06/10/2020
Note: Released By: TBAKER
CUSVC COMPLETE 04/28/2020 04/29/2020
Note: Released By: HHAND
ENGIN1 COMPLETE 04/28/2020 04/29/2020
Note: Released By: TBAKER
LOCATE COMPLETE 04/28/2020 04/30/2020
Note: Released By: CSTONE
SW1 HOLD 04/28/2020 04/29/2020
Note: Held By: CTROHA Applicant needs to revise site plan showing all stormwater draining to the front swale for treatment before going tinto the drainage ditch
UD1 COMPLETE 04/28/2020 05/01/2020
Note: Released By: AHALL
ZON HOLD 04/28/2020 04/28/2020
Note: Held By: ELENS Please provide width and material of walkway on the site plan. Have surveyor correct the FEMA map number. (...0226E) on the site plan and survey. Have surveyor correct the legal description on the survey/site plan. (Seminole Woods???) Once the survey and site plan are corrected, please upload both pages as one document.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/23/2020
SITE PLAN 20 ¤20.00 05/08/2020
SURCHARGE FS 533.721 ¤2.00 05/08/2020
SURCHARGE - FS 468.631 ¤2.18 05/08/2020
STORM WATER PERMIT FEES ¤80.00 05/08/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 05/08/2020
SEWER CREDIT (¤850.00) 05/08/2020
SEWER INSPECTION ¤25.00 05/08/2020
SEWER CAPITAL FACILITY ¤4,596.07 05/08/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 05/08/2020
METER - DEPOSIT ¤60.00 05/08/2020
WATER- TURN ON ¤25.00 05/08/2020
ADMIN FEE ¤125.00 05/08/2020
CONNECTION FEES ¤1,002.88 05/08/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 05/08/2020
IMPACT FEE FIRE ¤223.38 05/08/2020
IMPACT FEE PARKS ¤849.24 05/08/2020
IMPACT FEE SCHOOL ¤3,600.00 05/08/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 05/08/2020
WATER -IRRIGATION INSPECTION ¤25.00 05/08/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/08/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,791.53