Permit #2020050452
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00010-0220 |
| CONDITIONED SPACE: 2070 sqft |
| OPENED PORCH (WITH ROOF) : 215 sqft |
| OPENED PORCH (WITH ROOF) : 61 sqft |
| GARAGE: 438 sqft |
| Total Square Footage: 2784 sqft |
| Block: 00010 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: (386)446-5161 |
| Location Address: 92 PINE HAVEN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/19/2020 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: CANCEL PABLO |
|
Address 586 EAST 182ND STREET BRONX, NY 10457 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤275,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/19/2021 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION No hot water P2801.1 03-19-21... note above resolved | |||
| U -UTILITY RESIDENTIAL FINAL | 03/19/2021 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION circuit breaker for the pep tank required to be a 20 amp dedicated breaker(no gfi or arc fault) | |||
| U -UTILITY RESIDENTIAL FINAL | 03/18/2021 | Disapproved - NO FEE | LFITZGERALD |
| Note: circuit breaker for the pep tank required to be a 20 amp dedicated breaker(no gfi or arc fault) | |||
| BLD - BUILDING FINAL | 03/18/2021 | Disapproved - NO FEE | WMILLER |
| Note: No hot water P2801.1 | |||
| ROW - STORMWATER FINAL | 03/05/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END 03/03/2021=NO CHANGES FROM LAST INSPECTION NEED TO REMOVE THE OVERPOUR CONCRETE ON BOTH SIDES OF THE COLVERT I MARKED BY PINK SPRAY PAINT 03/05/2021= CORRECTION WERE MADE | |||
| ROW - FINAL APRON (AFTER POUR) | 03/05/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END 03/03/2021=NO CHANGES FROM LAST INSPECTION NEED TO REMOVE THE OVERPOUR CONCRETE ON BOTH SIDES OF THE COLVERT I MARKED BY PINK SPRAY PAINT 03/05/2021= CORRECTION WERE MADE | |||
| ROW - STORMWATER FINAL | 03/03/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END 03/03/2021=NO CHANGES FROM LAST INSPECTION NEED TO REMOVE THE OVERPOUR CONCRETE ON BOTH SIDES OF THE COLVERT I MARKED BY PINK SPRAY PAINT | |||
| ROW - FINAL APRON (AFTER POUR) | 03/03/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END 03/03/2021=NO CHANGES FROM LAST INSPECTION NEED TO REMOVE THE OVERPOUR CONCRETE ON BOTH SIDES OF THE COLVERT I MARKED BY PINK SPRAY PAINT | |||
| U-CROSS CONNECTION | 03/03/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/02/2021 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/02/2021 | APPROVED | GBERTOLA |
| U - SEWER TIE IN | 12/04/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/04/2020 | APPROVED | JGIBSON |
| ROW- PAVER RESTRAINTS | 11/25/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: I DID TALK TO THE SUPER NEED TO COMPACTED AGAIN SOME ONE DROVE IN THE SUB BASE AND LEFT IT LOOSE | |||
| ELECTRIC - EARLY POWER | 11/12/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:23 am | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION CULVERT OUT OF TOLERANCE. TOO HIGH. invert 4.15 BENCH MARK 6.20 PIPE R=4.24 = L=4.22 THERE IS AN ELEVATION TOLERENCE OF TWO TENTHS LOW AND ZERO TENTHS HIGH. DOUBLE CHECK THE ELEVATIONS ! 11/09/2020=READY TO POUR. HEAVY RAIN IN FORECAST. BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/06/2020 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: CULVERT OUT OF TOLERANCE. TOO HIGH. invert 4.15 BENCH MARK 6.20 PIPE R=4.24 = L=4.22 THERE IS AN ELEVATION TOLERENCE OF TWO TENTHS LOW AND ZERO TENTHS HIGH. DOUBLE CHECK THE ELEVATIONS ! | |||
| PEP TANK INSTALLATION REQUEST | 10/12/2020 | APPROVED | CSTONE |
| INSULATION | 09/29/2020 | APPROVED | MMESSER |
| LATH/BRICK/ WATER BARRIER | 09/22/2020 | APPROVED | MMESSER |
| ALL ROUGH | 09/22/2020 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 09/02/2020 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/01/2020 | APPROVED | MMESSER |
| TIE BEAM / LINTEL | 07/28/2020 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 07/09/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/24/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/22/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/03/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/08/2020 | 07/09/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 07/08/2020 | 07/08/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 06/11/2020 | 06/11/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 06/11/2020 | 06/12/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 06/11/2020 | 06/12/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 06/11/2020 | 06/12/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 05/19/2020 | 05/19/2020 |
| Note: Released By: TDOAK | |||
| SWALE | COMPLETE | 05/12/2020 | 06/18/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 05/11/2020 | 05/18/2020 |
| Note: Released By: FREODICA | |||
| CUSVC | COMPLETE | 05/11/2020 | 05/11/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 05/11/2020 | 05/12/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 05/11/2020 | 05/12/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/11/2020 | 05/14/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/11/2020 | 05/12/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 05/11/2020 | 05/18/2020 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 05/11/2020 | 05/12/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 05/11/2020 | 05/15/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/11/2020 | 05/14/2020 |
| Note: Held By: AMOBLEY Please mail original right of way agreement for paver driveway to City Hall Attn:Zoning |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/10/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 03/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 05/19/2020 |
| SEWER CREDIT | (¤1,804.25) | 05/19/2020 |
| SEWER INSPECTION | ¤25.00 | 05/19/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 05/19/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 05/19/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤550.00 | 05/19/2020 |
| SITE PLAN 20 | ¤20.00 | 05/19/2020 |
| SURCHARGE FS 533.721 | ¤12.65 | 05/19/2020 |
| SURCHARGE - FS 468.631 | ¤18.98 | 05/19/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/19/2020 |
| METER - DEPOSIT | ¤60.00 | 05/19/2020 |
| WATER- TURN ON | ¤25.00 | 05/19/2020 |
| ADMIN FEE | ¤20.00 | 05/19/2020 |
| CONNECTION FEES | ¤1,002.88 | 05/19/2020 |
| ELECTRIC FEE | ¤225.00 | 05/19/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 05/19/2020 |
| IMPACT FEE FIRE | ¤223.38 | 05/19/2020 |
| IMPACT FEE PARKS | ¤849.24 | 05/19/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/19/2020 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 05/19/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 05/19/2020 |
| MECHANICAL FEE | ¤225.00 | 05/19/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/19/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/19/2020 |
| PLAN CHECK FEE | ¤110.00 | 05/19/2020 |
| PLUMBING FEE | ¤225.00 | 05/19/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,178.73 |