Permit #2020050583
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00090-0090 |
| CONDITIONED SPACE: 1525 sqft |
| CONDITIONED SPACE: 1733 sqft |
| CONDITIONED SPACE: 98 sqft |
| GARAGE: 578 sqft |
| OPENED PORCH (WITH ROOF) : 290 sqft |
| OPENED PORCH (WITH ROOF) : 78 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| Total Square Footage: 4341 sqft |
| Block: 00090 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: (386) 246-6123 |
| Location Address: 1 SEA SPIRAL PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/29/2020 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PKWY STE 7 PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤286,938.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/27/2021 | FINAL APPROVED | TSTAUFFACHER |
| U-CROSS CONNECTION | 01/27/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/27/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 01/21/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THERE WAS ALOT OF DIRT DUMPED ON THE VACANT LOT THAT NEEDS TO BE SPREAD OUT AND HAVE SOME SEEAD AND STRAW OR PINE NEEDLES PUT ON IT CORRECTIONS MADE THE DIRT WAS DUMPED BY THE POOL GUYS | |||
| ROW - FINAL APRON (AFTER POUR) | 01/21/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/12/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 01/12/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 12/09/2020 | APPROVED - AS NOTED | KRUTH |
| Note: concrete at the garage needs to be chipped to have the 4'' min before pouring It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 11/25/2020 | APPROVED | TSTAUFFACHER |
| GRAVITY SEWER TEST | 11/25/2020 | APPROVED | TSTAUFFACHER |
| ELECTRIC - EARLY POWER | 11/24/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:25 | |||
| LATH/BRICK/ WATER BARRIER | 10/12/2020 | APPROVED | FWILLIS |
| WINDOW NAILING | 10/06/2020 | APPROVED | FWILLIS |
| INSULATION | 09/30/2020 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 09/28/2020 | APPROVED | CSTONE |
| ALL ROUGH | 09/25/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Inspection stopped, no all-rough inspection performed... Deficiencies noted on inspection 2460 on 9-8-2020 were not resolved and must be resolved. 9/25/20 - Header Detail For 2 Story House NOT clear. Shows One Jack One Stud on Right Side And Two Studs on Left NO Jacks. Also shows studs going through top and bottom plates. RFI Engineer for Clarification. Will Pass PENDING Engineering Letter. | |||
| ALL ROUGH | 09/24/2020 | Disapproved -FEE REQUIRED | WMILLER |
| Note: Inspection stopped, no all-rough inspection performed... Deficiencies noted on inspection 2460 on 9-8-2020 were not resolved and must be resolved. | |||
| ROOF VALLEY & METAL | 09/15/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/08/2020 | APPROVED - AS NOTED | FWILLIS |
| Note: Partial Inspection. Roof and Sheathing Passed. Braces and ties not complete. Header Detail at stairs needs to match the approved plans any changes must have Engineer Letter. (3 Headers in question) INSPECT ON NEXT INSPECTION. | |||
| TIE BEAM / LINTEL | 08/19/2020 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 08/13/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/22/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 07/20/2020 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/14/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/19/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/11/2020 | 12/18/2020 |
| Note: Released By: FREODICA Revision - added concrete walkway at rear corner of house. | |||
| SW1 | COMPLETE | 12/11/2020 | 12/18/2020 |
| Note: Released By: CTROHA Stormwater review not requested on Permit Correction/Revision Form | |||
| ZON | COMPLETE | 12/11/2020 | 12/14/2020 |
| Note: Released By: ELENS | |||
| ZON | COMPLETE | 11/16/2020 | 11/16/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 10/05/2020 | 10/09/2020 |
| Note: Released By: PBUCKLEY | |||
| ENGIN1 | COMPLETE | 08/12/2020 | 08/13/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 08/12/2020 | 08/12/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 05/27/2020 | 05/27/2020 |
| Note: Released By: ELENS | |||
| BLD | COMPLETE | 05/27/2020 | 05/28/2020 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 05/27/2020 | 05/28/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 05/14/2020 | 06/19/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 05/13/2020 | 05/18/2020 |
| Note: Held By: JPI 1. Identify egress windows – FRC 310. 2. Bearing wall and pony wall details on page 9.1 illustrate SP-4 at sole plate. Please correct if erroneous. 3. Provide full structural construction details for stairs and landing to include all attachments and tread and riser details. FRC 311.7 and 312.1. 4. Provide gable end wall detail at two story section where gable end will be atop the exterior wood bearing wall. 5. Provide details of end condition construction of roof at covered lanai at T15 truss | |||
| CUSVC | COMPLETE | 05/13/2020 | 05/14/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 05/13/2020 | 05/18/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 05/13/2020 | 05/14/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/13/2020 | 05/15/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/13/2020 | 05/14/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 05/13/2020 | 05/18/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 05/13/2020 | 05/18/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 05/13/2020 | 05/18/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/13/2020 | 05/13/2020 |
| Note: Held By: ELENS FEMA flood map number is incorrect on the survey and site plan. Please correct on both. (Please note that this parcel falls within two map numbers.) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/27/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 05/29/2020 |
| SEWER CREDIT | (¤685.39) | 05/29/2020 |
| SEWER INSPECTION | ¤25.00 | 05/29/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 05/29/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 05/29/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤824.00 | 05/29/2020 |
| SITE PLAN 20 | ¤20.00 | 05/29/2020 |
| SURCHARGE FS 533.721 | ¤17.86 | 05/29/2020 |
| SURCHARGE - FS 468.631 | ¤26.78 | 05/29/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/29/2020 |
| METER - DEPOSIT | ¤60.00 | 05/29/2020 |
| WATER- TURN ON | ¤25.00 | 05/29/2020 |
| ADMIN FEE | ¤20.00 | 05/29/2020 |
| CONNECTION FEES | ¤1,002.88 | 05/29/2020 |
| ELECTRIC FEE | ¤307.20 | 05/29/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 05/29/2020 |
| IMPACT FEE FIRE | ¤223.38 | 05/29/2020 |
| IMPACT FEE PARKS | ¤849.24 | 05/29/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/29/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 05/29/2020 |
| MECHANICAL FEE | ¤307.20 | 05/29/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/29/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/29/2020 |
| PLAN CHECK FEE | ¤164.80 | 05/29/2020 |
| PLUMBING FEE | ¤307.20 | 05/29/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,842.00 |