I want to search for...

Permit #2020050940

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7032-00230-0080
Block: 00230
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 386-227-2646
Location Address: 15 ROYAL PALM LN
Type: DR - DRIVEWAY
Issue Date: 06/01/2020
NOC: Unknown
Applicant name: JUAN P BARTOLOME HERNANDEZ
Owner: THOMPSON, WINSTON G & ANNA M

Address

TRUSTEES

PALM COAST, FL 32135

Address

PO BOX 350623

PALM COAST, FL 32135

Lot: 0080
Contracted Stated Job Value: ¤1,500.00
Job Description: ADD CONCRETE CIRCULAR DRIVEWAY 50 X 18
Type: CN

Contractor

A TOUCH OF SPAIN INC
Status Location Address Phone
INACTIVE

74 SEVEN WONDERS TRAIL

,

386-227-2646

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 09/18/2020 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 09/16/2020 FINAL APPROVED KHOWELL
ROW - FINAL INSPECTION 09/02/2020 Disapproved - NO FEE KHOWELL
Note: GUTTER DOWNSPOUT PIPES ARE NOT ALLOWED TO BE IN THE RIGHT-OF-WAY AND SHOULD HAVE A POP-UP ON THE END TO SLOW THE FLOW OF WATER DOWN. MISSING SOD BETWEEN THE NEW AND EXISTING DRIVEWAY ON LEFT SIDE.
ROW - FINAL APRON (AFTER POUR) 08/19/2020 APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) 08/14/2020 Disapproved - NO FEE KHOWELL
Note: THIS IS A REINSPECTION CLEAN THE DIRT AND CONCRETE OUT OF THE CULVERT PIPE
ROW - FINAL APRON (AFTER POUR) 08/04/2020 Disapproved -FEE REQUIRED KHOWELL
Note: CLEAN THE DIRT AND CONCRETE OUT OF THE CULVERT PIPE AND REMOVE SOD THAT IS UP THE MITERED END SECTIONS
ROW- PRE-APRON (PRE-POUR) 06/16/2020 APPROVED - AS NOTED KHOWELL
Note: ADJUST FRONT SIDEWQALK TO MAXIMUM OF 6' WIDE AT FRONT WALKWAY ONSITE WITH CONTRACTOR AND TOLD HIM IF IT IS WIDER THEN 6' IT WILL HAVE TO BE CUT OUT. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.

Review History

Department Status Date In Date Out
ZON COMPLETE 06/01/2020 06/01/2020
Note: Released By: AMOBLEY
ZON COMPLETE 05/29/2020 05/29/2020
Note: Released By: AMOBLEY
UD1 COMPLETE 05/29/2020 06/01/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 05/29/2020 06/01/2020
Note: Released By: TBAKER
ENGIN1 COMPLETE 05/20/2020 05/27/2020
Note: Released By: TBAKER
UD1 COMPLETE 05/20/2020 05/27/2020
Note: Released By: LFITZGERALD
ZON HOLD 05/20/2020 05/21/2020
Note: Held By: AMOBLEY Please show the 5ft setback from arc to property line Show the total width of driveway at the widest point

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 09/17/2020
SITE PLAN 20 ¤20.00 06/01/2020
SURCHARGE FS 533.721 ¤2.00 06/01/2020
SURCHARGE - FS 468.631 ¤2.00 06/01/2020
STORM WATER PERMIT FEES ¤40.00 06/01/2020
ADMIN FEE ¤20.00 06/01/2020
Fees Total Due: ¤0.00 Total Paid: ¤124.00