I want to search for...

Permit #2020050976

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00020-0210
CONDITIONED SPACE: 1280 sqft
CONDITIONED SPACE: 1280 sqft
GARAGE: 250 sqft
GARAGE: 250 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 3420 sqft
Block: 00020
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 386-864-2199
Location Address: 41 PINE HURST LN
Type: DU - DUPLEX
Issue Date: 07/09/2020
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: SANTOS VICTOR M & MARISOL M H&W

Address

545 JUNIPER LANE

BRIDGEWATER, NJ 08807

Lot: 0210
Contracted Stated Job Value: ¤300,000.00
Job Description: Duplex Construction
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
ARTUR ROBERT SMIETANOWSKI
Status Location Address State License Number Phone
ACTIVE

11 ABACUS AVE

ORMOND BEACH, FL 32174

CAC1817498 (Exp: 08/31/2026) 386-316-8333
FERNANDO MEZA SR
Status Location Address State License Number Phone
CANCEL

457 CHELSEA PLACE AV

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2022) 570-575-8139

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/29/2021 FINAL APPROVED MMESSER
Note: THIS IS A REINSPECTION AC condenser calls for 25 amp max fuse, 30 amp in panel - both units.
U-CROSS CONNECTION 04/26/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
BLD - BUILDING FINAL 04/26/2021 Disapproved - NO FEE MMESSER
Note: AC condenser calls for 25 amp max fuse, 30 amp in panel - both units.
U -UTILITY RESIDENTIAL FINAL 04/26/2021 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 04/23/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION SUPER ON SITE NEED TO REPAIER THE SWALE ON THE RIGHT SIDE SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE IN THE EMPTY LOTS OF TRASH AND DEBRIS CAN NOT BE LEFTED IN VACANTS OR SURROUNDING LOTS 4/22/2021=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED AT THE TIME OF THE INSPECTION EVERYTHING IS GOOD. 4/23/2021: approved earlier in the office should be done yesterday i don't know what happen yesterday
FINAL SURVEY (OFFICE USE ONLY) 04/21/2021 APPROVED GBERTOLA
Note: Walkway in front of the house is different from the site plan. New changes will reflect on final survey
ROW - FINAL APRON (AFTER POUR) 04/21/2021 APPROVED - AS NOTED GBERTOLA
Note: Walkway in front of the house is different from the site plan. New changes will reflect on final survey CORRECTION WERE MADE
ROW FIELD SURVEY /GRADING CERTIFICATION 04/21/2021 APPROVED GBERTOLA
Note:
ROW - FINAL INSPECTION 04/21/2021 Disapproved - NO FEE GBERTOLA
Note: SUPER ON SITE NEED TO REPAIER THE SWALE ON THE RIGHT SIDE SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE IN THE EMPTY LOTS OF TRASH AND DEBRIS CAN NOT BE LEFTED IN VACANTS OR SURROUNDING LOTS
ROW- PRE-APRON (PRE-POUR) 02/26/2021 APPROVED - AS NOTED GBERTOLA
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION NOT ALL FORMED AT TIME OF INSPECTION. BOTH COLVERTS ARE GOOD. NEED TO CHIP THE CONCRETE LIP AT THE END OF THE GARAGE DOOR BOTH SIDE AND BOTH SIDE WALKS NEED TO SHAVE DOWN I LEFT EVRETHING PAINTED WITH PINK SPRAY EASY TO SEE IT, PICTURE ATTACHED 02/26/2021=CORRECTION WERE MADE
ROW- PRE-APRON (PRE-POUR) 02/08/2021 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NOT ALL FORMED AT TIME OF INSPECTION. BOTH COLVERTS ARE GOOD. NEED TO CHIP THE CONCRETE LIP AT THE END OF THE GARAGE DOOR BOTH SIDE AND BOTH SIDE WALKS NEED TO SHAVE DOWN I LEFT EVRETHING PAINTED WITH PINK SPRAY EASY TO SEE IT, PICTURE ATTACHED
ROW- PRE-APRON (PRE-POUR) 02/04/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION NOT ALL FORMED AT TIME OF INSPECTION. BOTH COLVERTS ARE GOOD. NEED TO CHIP THE CONCRETE LIP AT THE END OF THE GARAGE DOOR BOTH SIDE AND BOTH SIDE WALKS NEED TO SHAVE DOWN I LEFT EVRETHING PAINTED WITH PINK SPRAY EASY TO SEE IT, PICTURE ATTACHED
ROW- PRE-APRON (PRE-POUR) 02/03/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: NOT ALL FORMED AT TIME OF INSPECTION.
U - SEWER TIE IN 01/27/2021 APPROVED JGIBSON
Note: THIS IS A REINSPECTION SEWER NOT TIED IN TO PEP TANK
GRAVITY SEWER TEST 01/27/2021 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NO TEST
GRAVITY SEWER TEST 01/25/2021 Disapproved - NO FEE JGIBSON
Note: NO TEST
U - SEWER TIE IN 01/25/2021 Disapproved - NO FEE JGIBSON
Note: SEWER NOT TIED IN TO PEP TANK
ELECTRIC - EARLY POWER 01/12/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:40
PEP TANK INSTALLATION REQUEST 12/14/2020 APPROVED CSTONE
PEP TANK INSTALLATION REQUEST 12/11/2020 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 12/09/2020 APPROVED MMESSER
INSULATION 12/01/2020 APPROVED MMESSER
ALL ROUGH 11/30/2020 APPROVED MMESSER
ROOF VALLEY & METAL 11/10/2020 APPROVED MMESSER
FIREWALL 11/10/2020 APPROVED MMESSER
Note:
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/04/2020 APPROVED MMESSER
TIE BEAM / LINTEL 10/22/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION Dowels missing at back porch.
TIE BEAM / LINTEL 10/20/2020 Disapproved - NO FEE MMESSER
Note: Dowels missing at back porch.
ROW- PROJECT STATUS 10/20/2020 APPROVED GBERTOLA
Note: CORRECTIONS MADE IT
ROW - DRAINAGE 10/13/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: I just got off the phone with a homeowner on this block complaining about the Duplex being built by Golden Magnolia. He claims the swale area is being blocked, so the water is backing up on his property. Could you please check this out, thank you I DID TALK TO SERGEI THE SUPER HE SAID HE IS GOING TO FIXED I BE BACK ON 10/20/2020 I DID TOLD HIM PU THE PIPE ON THE GROUND PIPE IS BENDING IN THE MIDDLE AND BOTH CORNERS ARE UP AT LIST 10 IONCH HIGH FROM THE SWALE
FOUND SURVEY APPROVED (OFFICE) 09/16/2020 APPROVED TBAKER
MONOLITHIC SLAB 09/04/2020 APPROVED - AS NOTED MMESSER
Note: THIS IS A REINSPECTION Clean washout around rebar.
MONOLITHIC SLAB 09/02/2020 CANCELLED BY APPLICANT MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 08/26/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION P-2503.5.1 HEAD TEST ON ''B'' SIDE NOT HOLDING
PLUMBING 1ST ROUGH UNDERGROUND 08/25/2020 Disapproved -FEE REQUIRED JGIBSON
Note: P-2503.5.1 HEAD TEST ON ''B'' SIDE NOT HOLDING
WATER METER INSTALLATION REQUEST 08/05/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH HOLD 12/28/2020 12/28/2020
Note: Held By: CPISCITELLI Provide heatload and duct layout signed by the AC contractor
MECH HOLD 12/28/2020 12/28/2020
Note: Held By: CPISCITELLI Provide heatload (Second Request)
MECH COMPLETE 12/28/2020 12/29/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 09/15/2020 09/15/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 09/15/2020 09/16/2020
Note: Released By: TBAKER
ELEC COMPLETE 06/05/2020 06/05/2020
Note: Released By: JMUNSON
ZON COMPLETE 06/03/2020 06/03/2020
Note: Released By: AMOBLEY
MECH COMPLETE 06/03/2020 06/03/2020
Note: Released By: CPISCITELLI
ELEC HOLD 06/03/2020 06/03/2020
Note: Held By: JMUNSON 2. Need outlets in back bathroom on both sides. NEC 2014 art 210.52 (D)
BLD COMPLETE 06/03/2020 06/04/2020
Note: Released By: JPI
BLD HOLD 05/21/2020 05/26/2020
Note: Held By: JPI 1. Provide the following basic/required design criteria: Design wind speed, Risk category, Exposure Category, Occupancy, Type of construction, Applicable Codes, etc.. R301. It appears that a cover page might be missing Page 1 of 9. 2. Smoke and Carbon monoxide detectors to maintain clearances from ductwork, bathrooms, etc… And to be installed in proper locations per R314/315. 3. Missing items from PA spec sheet: roof underlayment, roof vent, Single hung window, Zip system. 4. Provide full UL Design detail cut sheets for rated wall between units. 5. Identify egress windows – FRC 310. 6. For all attachment of wood framing to masonry, please call out distance from edge of member for first fastener. IE: Fastener start @ 6” from splice and edge of wood member. 7. Provide written response to comments with clouded revisions on plan.
CUSVC COMPLETE 05/21/2020 05/22/2020
Note: Released By: HHAND
ELEC HOLD 05/21/2020 05/26/2020
Note: Held By: JMUNSON 1. Submit load calculations 2. Need outlets in back bathroom on both sides. NEC 2014 art 210.52 (D)
ENGIN1 COMPLETE 05/21/2020 05/21/2020
Note: Released By: TBAKER
LOCATE COMPLETE 05/21/2020 05/21/2020
Note: Released By: CSTONE
MECH HOLD 05/21/2020 05/26/2020
Note: Held By: CPISCITELLI Duct Drawing needs to be signed by the Ac contractor
PLUM COMPLETE 05/21/2020 05/26/2020
Note: Released By: JPI
SW1 COMPLETE 05/21/2020 05/27/2020
Note: Released By: CTROHA
UD1 COMPLETE 05/21/2020 05/22/2020
Note: Released By: AHALL
ZON HOLD 05/21/2020 05/22/2020
Note: Held By: AMOBLEY Elevations labeled as floor plans on elevation page
SWALE COMPLETE 05/21/2020 06/29/2020
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 11/17/2021
CONTRACTOR CHANGE ¤40.00 11/17/2021
CONTRACTOR CHANGE ¤40.00 11/17/2021
REINSPECTION FEE ¤40.00 11/17/2021
REINSPECTION FEE ¤40.00 11/17/2021
STORMWATER REINSPECTION FEE ¤40.00 11/17/2021
STORMWATER REINSPECTION FEE ¤40.00 11/17/2021
3% TRANS IMPACT FEE CREDIT (¤77.94) 07/09/2020
SEWER CREDIT (¤2,294.00) 07/09/2020
SEWER INSPECTION ¤25.00 07/09/2020
SEWER CAPITAL FACILITY ¤9,192.14 07/09/2020
WATER CAPITAL FACILITY FEE ¤6,748.36 07/09/2020
NEW RESIDENTIAL INSPECTIONS ¤638.00 07/09/2020
SITE PLAN 20 ¤20.00 07/09/2020
SURCHARGE FS 533.721 ¤2.00 07/09/2020
SURCHARGE - FS 468.631 ¤2.00 07/09/2020
STORM WATER PERMIT FEES ¤80.00 07/09/2020
METER - DEPOSIT ¤120.00 07/09/2020
WATER- TURN ON ¤50.00 07/09/2020
ADMIN FEE ¤20.00 07/09/2020
CONNECTION FEES ¤2,005.76 07/09/2020
BUILDING DISCOUNT 100% (¤1,539.80) 07/09/2020
ELECTRIC FEE ¤251.40 07/09/2020
3% FIRE IMPACT FEE CREDIT (¤13.40) 07/09/2020
IMPACT FEE FIRE ¤446.76 07/09/2020
IMPACT FEE PARKS ¤1,698.48 07/09/2020
IMPACT FEE SCHOOL ¤7,200.00 07/09/2020
IMPACT FEE TRANSPORTATION ¤2,598.00 07/09/2020
MECHANICAL FEE ¤251.40 07/09/2020
WATER -IRRIGATION INSPECTION ¤50.00 07/09/2020
3% PARKS IMPACT FEE CREDIT (¤50.95) 07/09/2020
PLAN CHECK FEE ¤127.60 07/09/2020
PLUMBING FEE ¤251.40 07/09/2020
Fees Total Due: ¤0.00 Total Paid: ¤28,082.21