Permit #2020060023

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00400-0020
CONDITIONED SPACE: 1775 sqft
CONDITIONED SPACE: 2300 sqft
GARAGE: 680 sqft
OPENED PORCH (WITH ROOF) : 191 sqft
Total Square Footage: 4946 sqft
Block: 00400
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: 904-268-7730
Location Address: 12 UPSHIRE PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/05/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD RD STE 202

JACKSONVILLE, FL 32257

Lot: 0020
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/03/2020 FINAL APPROVED WMILLER
U -UTILITY RESIDENTIAL FINAL 12/03/2020 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 12/02/2020 APPROVED - AS NOTED KRUTH
Note: 12/2/2020 THE SWALE AREA ACROSS THE STREET IS BEING TAKEN CARE OF BY THE CITY DAMAGE WAS DONE BY THE CITY UTILITY DEPARTMENT SPOKE WITH HOLLY AND CORRECTIONS ARE MADE
ROW FIELD SURVEY /GRADING CERTIFICATION 12/02/2020 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION THE SWALE ON THE RIGHT SIDE OF THE PIPE IS TO LOW BRING UP AND RE SOD ALSO THERE ARE RUTS IN THE SWALE ON THE LEFT SIDE OF THE PIPE THAT NEEDS TO BE FIXED AND SOD ADDED THERE AND THERE ARE RUTS ACROSS THE STREET THAT NEEDS TO BE FIXED AND SOD ADDED AND ASPHAULT PACH NEEDS TO BE DONE BEFORE YOU WILL PASS YOUR ROW STORMWATER FINAL ALL OF THE DIRT IN THE SWALES NEED TO BE REMOVED AS WELL CORRECTIONS MADE 12/2/2020
ROW - STORMWATER FINAL 12/02/2020 APPROVED - AS NOTED KRUTH
Note: SWALE ACROSS THE STREET ARE BEING REPAIRED BY THE CITY UTILITY DEPARTMENT
ROW FIELD SURVEY /GRADING CERTIFICATION 11/30/2020 Disapproved -FEE REQUIRED KRUTH
Note: THE SWALE ON THE RIGHT SIDE OF THE PIPE IS TO LOW BRING UP AND RE SOD ALSO THERE ARE RUTS IN THE SWALE ON THE LEFT SIDE OF THE PIPE THAT NEEDS TO BE FIXED AND SOD ADDED THERE AND THERE ARE RUTS ACROSS THE STREET THAT NEEDS TO BE FIXED AND SOD ADDED AND ASPHAULT PACH NEEDS TO BE DONE BEFORE YOU WILL PASS YOUR ROW STORMWATER FINAL ALL OF THE DIRT IN THE SWALES NEED TO BE REMOVED AS WELL PIPES NEED TO BE CLEANED OUT TOO
FINAL SURVEY (OFFICE USE ONLY) 11/30/2020 APPROVED KRUTH
U - SEWER TIE IN 11/12/2020 APPROVED - AS NOTED JGIBSON
Note: UTILITY COMPANY MADE TAP
U-CROSS CONNECTION 11/12/2020 APPROVED - AS NOTED JHARDING
Note: this house does not have irrigation system. Approved no cross connections
ELECTRIC - EARLY POWER 10/28/2020 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1.Both main breakers need to be installed. 2. breaker openings in the meter main need to be filled NEC 2014 110.12 (A). 3. Riser diagram on plans need to match whats installed. 10/21/20 1. Breaker openiungs need to be filled in meter main. NEC 2014 110.12. 2. Riser diagram on plans needs to match whats installed. 10/27/20 Tape is not UL listed for breaker blanks. NEC 110.3. Breakers openings need to be filled by UL listed breaker blanks. NEC 2014 110. 12 10/28/20 Emailed FPL at 8:40 am
ELECTRIC - EARLY POWER 10/27/2020 Disapproved -FEE REQUIRED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1.Both main breakers need to be installed. 2. breaker openings in the meter main need to be filled NEC 2014 110.12 (A). 3. Riser diagram on plans need to match whats installed. 10/21/20 1. Breaker openiungs need to be filled in meter main. NEC 2014 110.12. 2. Riser diagram on plans needs to match whats installed. 10/27/20 Tape is not UL listed for breaker blanks. NEC 110.3. Breakers openings need to be filled by UL listed breaker blanks. NEC 2014 110. 12
ELECTRIC - EARLY POWER 10/21/2020 Disapproved -FEE REQUIRED JMUNSON
Note: THIS IS A REINSPECTION 1.Both main breakers need to be installed. 2. breaker openings in the meter main need to be filled NEC 2014 110.12 (A). 3. Riser diagram on plans need to match whats installed. 10/21/20 1. Breaker openiungs need to be filled in meter main. NEC 2014 110.12. 2. Riser diagram on plans needs to match whats installed.
ROW- PRE-APRON (PRE-POUR) 10/16/2020 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 10/15/2020 Disapproved -FEE REQUIRED KHOWELL
Note: * DIG FOOTERS OUT TO MINIMUM 6" DEEP * CULVERT PIPE IS REQUIRED TO BE HALF EXPOSED ON EACH SIDE PER CITY STANDARD DETAIL. * 5" MINIMUM THICK CONCRETE REQUIRED IN THE ROW. * FOOTER REBAR NOT ON SITE. * HIGH AREAS IN PAD 5" IN ROW AND 4" ABOVE THE ROW ARE THE MINIMUM REQUIREMENTS. * WATER IN CULVERT PIPE AT TIME OF INSPECTION.
ELECTRIC - EARLY POWER 10/15/2020 Disapproved - NO FEE JMUNSON
Note: 1.Both main breakers need to be installed. 2. breaker openings in the meter main need to be filled NEC 2014 110.12 (A). 3. Riser diagram on plans need to match whats installed.
ROW- PRE-APRON (PRE-POUR) 10/14/2020 CANCELLED BY APPLICANT KHOWELL
Note: HOLLY CALLED AND CANCELLED
LATH/BRICK/ WATER BARRIER 09/21/2020 APPROVED FWILLIS
INSULATION 08/31/2020 APPROVED FWILLIS
ALL ROUGH 08/26/2020 APPROVED FWILLIS
ROOF VALLEY & METAL 08/17/2020 APPROVED - AS NOTED FWILLIS
Note: Roof Valley Metal Inspection Passes.......However while performing this Inspection it was noticed that the Wall Sheathing was not secured properly left rear corner and in the rear of house. Would like to see those areas in question on next Inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/10/2020 APPROVED JBODEN
FOUND SURVEY APPROVED (OFFICE) 08/04/2020 APPROVED TBAKER
TIE BEAM / LINTEL 07/31/2020 APPROVED JBODEN
Note: Spoke to Robert inspection will be before 9. Thank you.
TIE BEAM / LINTEL 07/30/2020 CANCELLED BY APPLICANT FWILLIS
Note: After Hours Inspection will be needed
MONOLITHIC SLAB 07/24/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Exterior Footings Should be placed NOT LESS than 12" below the UNDISTURBED GROUND SURFACE. 7/22/20 -2017 RESIDENTIAL CODE, R403.1.4 SAYS FOOTINGS SHOULD BE PLACED NOT LESS THAN 12" BELOW UNDISTURBED GROUND SURFACE. PUSHING NON-COMPACTED DIRT TO THE TOP OF THE BATTER BOARDS IS NOT PART OF THE UNDISTURBED GROUND. THIS GOES FOR THE FRONT ENTRY ALSO. 7/24/20 - Corrected Footer Depth on house.
MONOLITHIC SLAB 07/23/2020 CANCELLED BY APPLICANT FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Exterior Footings Should be placed NOT LESS than 12" below the UNDISTURBED GROUND SURFACE. 7/22/20 -2017 RESIDENTIAL CODE, R403.1.4 SAYS FOOTINGS SHOULD BE PLACED NOT LESS THAN 12" BELOW UNDISTURBED GROUND SURFACE. PUSHING NON-COMPACTED DIRT TO THE TOP OF THE BATTER BOARDS IS NOT PART OF THE UNDISTURBED GROUND. THIS GOES FOR THE FRONT ENTRY ALSO.
MONOLITHIC SLAB 07/22/2020 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Exterior Footings Should be placed NOT LESS than 12" below the UNDISTURBED GROUND SURFACE. 7/22/20 -2017 RESIDENTIAL CODE, R403.1.4 SAYS FOOTINGS SHOULD BE PLACED NOT LESS THAN 12" BELOW UNDISTURBED GROUND SURFACE. PUSHING NON-COMPACTED DIRT TO THE TOP OF THE BATTER BOARDS IS NOT PART OF THE UNDISTURBED GROUND. THIS GOES FOR THE FRONT ENTRY ALSO.
MONOLITHIC SLAB 07/20/2020 Disapproved - NO FEE FWILLIS
Note: Exterior Footings Should be placed NOT LESS than 12" below the UNDISTURBED GROUND SURFACE.
PLUMBING 1ST ROUGH UNDERGROUND 07/16/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 07/16/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/19/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ELEC COMPLETE 10/23/2020 10/26/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/03/2020 08/04/2020
Note: Released By: TBAKER
ZON COMPLETE 08/03/2020 08/03/2020
Note: Released By: AMOBLEY
ELEC COMPLETE 06/04/2020 06/04/2020
Note: Released By: JMUNSON
ZON COMPLETE 06/04/2020 06/04/2020
Note: Released By: ELENS
BLD COMPLETE 06/01/2020 06/03/2020
Note: Released By: JPI
CUSVC COMPLETE 06/01/2020 06/01/2020
Note: Released By: HHAND
ELEC HOLD 06/01/2020 06/01/2020
Note: Held By: JMUNSON Riser diagram only shows 150 and 200 amp service. Load calculations say recommended service 300 amp minimum of 200 amp you need to specify which one is being used and if its a 300 amp service riser diagram needs to be uploaded for that.
ENGIN1 COMPLETE 06/01/2020 06/01/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/01/2020 06/03/2020
Note: Released By: CSTONE
MECH COMPLETE 06/01/2020 06/02/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 06/01/2020 06/03/2020
Note: Released By: JPI
SW1 COMPLETE 06/01/2020 06/01/2020
Note: Released By: CTROHA
UTL COMPLETE 06/01/2020 06/03/2020
Note: Released By: AHALL
ZON HOLD 06/01/2020 06/01/2020
Note: Held By: ELENS Please correct the legal description on the site plan and survey. It is lot 2, not lot 1. Please provide the color of both the siding and the stucco finish to demonstrate that the exterior is one color.
SWALE COMPLETE 06/01/2020 06/30/2020
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/04/2020
REINSPECTION FEE ¤40.00 12/04/2020
REINSPECTION FEE ¤40.00 12/04/2020
REINSPECTION FEE ¤40.00 12/04/2020
REINSPECTION FEE ¤40.00 12/04/2020
NEW RESIDENTIAL INSPECTIONS ¤974.00 06/05/2020
SITE PLAN 20 ¤20.00 06/05/2020
SURCHARGE FS 533.721 ¤20.71 06/05/2020
SURCHARGE - FS 468.631 ¤31.06 06/05/2020
STORM WATER PERMIT FEES ¤80.00 06/05/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 06/05/2020
SEWER CREDIT (¤850.00) 06/05/2020
SEWER INSPECTION ¤25.00 06/05/2020
SEWER CAPITAL FACILITY ¤4,596.07 06/05/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 06/05/2020
METER - DEPOSIT ¤60.00 06/05/2020
WATER- TURN ON ¤25.00 06/05/2020
ADMIN FEE ¤20.00 06/05/2020
CONNECTION FEES ¤1,002.88 06/05/2020
ELECTRIC FEE ¤352.20 06/05/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/05/2020
IMPACT FEE FIRE ¤223.38 06/05/2020
IMPACT FEE PARKS ¤849.24 06/05/2020
IMPACT FEE SCHOOL ¤3,600.00 06/05/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 06/05/2020
MECHANICAL FEE ¤352.20 06/05/2020
WATER -IRRIGATION INSPECTION ¤25.00 06/05/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/05/2020
PLAN CHECK FEE ¤194.80 06/05/2020
PLUMBING FEE ¤352.20 06/05/2020
Fees Total Due: ¤0.00 Total Paid: ¤17,119.52