Permit #2020060213

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01310-0270
CONDITIONED SPACE: 2081 sqft
GARAGE: 623 sqft
OPENED PORCH (WITH ROOF) : 159 sqft
OPENED PORCH (WITH ROOF) : 34 sqft
Total Square Footage: 2897 sqft
Block: 01310
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: (386) 672-8285
Location Address: 75 EDWARD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/10/2020
NOC: RECORDED
Applicant name: JOSEPH TODD VANACORE
Owner: RENDINO RICHARD & ELLEN H&W

Address

3232 W TARO LANE

PHOENIX, AZ 85027

Lot: 0270
Contracted Stated Job Value: ¤189,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

VANACORE CONSTRUCTION INC.
Status Location Address Mailing Address State License Number Phone
INACTIVE

1451 N US HIGHWAY 1

Ormond Beach, FL 32174

SUITE 13

Ormond Beach, FL 32174

CBC058991 (Exp: 08/31/2024) (386) 672-8285

Sub Contractors

VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
ALFRED N FYOCK JR
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

387 SAULS

ORMOND BEACH, FL 32174

ST

ORMOND BEACH, FL 32174

CCC1329075 (Exp: 08/31/2026) 386-566-6112 386-673-4299

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 02/01/2021 Approval - Private Provider PPROVIDER
Note: 02/01/2021 Building and MEP final inspections passed.
HVAC FINAL 02/01/2021 Approval - Private Provider PPROVIDER
Note: 02/01/2021 Building and MEP final inspections passed.
ELECTRIC FINAL 02/01/2021 Approval - Private Provider PPROVIDER
Note: 02/01/2021 Building and MEP final inspections passed.
BLD - BUILDING FINAL 02/01/2021 Approval - Private Provider PPROVIDER
Note: 02/01/2021 Building and MEP final inspections passed.
U -UTILITY RESIDENTIAL FINAL 01/28/2021 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 01/27/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION no final survey under general muni code sec 42-49 not ready for inspection CORRECTIONS MADE
ROW FIELD SURVEY /GRADING CERTIFICATION 01/27/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION ALL DISTURBED AREAS RESTORED TO LIKE OR BETTER CONDITIONS SEC 42-52 OF RESIDENTIAL MUNICODES THE GRAS IN THE SWALE NEEDS TO BE FIXED SOD REPLACEMENT NEEDS TO MATCH EXISTING SOD CORRECTIONS MADE
ROW - STORMWATER FINAL 01/27/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 01/26/2021 Disapproved -FEE REQUIRED KRUTH
Note: ALL DISTURBED AREAS RESTORED TO LIKE OR BETTER CONDITIONS SEC 42-52 OF RESIDENTIAL MUNICODES THE GRAS IN THE SWALE NEEDS TO BE FIXED SOD REPLACEMENT NEEDS TO MATCH EXISTING SOD
FINAL SURVEY (OFFICE USE ONLY) 01/26/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 01/22/2021 Disapproved -FEE REQUIRED KRUTH
Note: no final survey under general municode sec 42-49 not ready for inspection
U-CROSS CONNECTION 01/20/2021 APPROVED - AS NOTED LFITZGERALD
Note: well irrigation
ROW- PROJECT STATUS 01/14/2021 APPROVED - AS NOTED CTROHA
Note: Met on site with builder to discuss the swale elevations. Match existing elevations at the property lines and carry the flow line through which will bury the culvert aproximately 2 tenths
ROW- PRE-APRON (PRE-POUR) 01/05/2021 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. pipe is good
U - SEWER TIE IN 12/23/2020 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 12/23/2020 Approval - Private Provider PPROVIDER
ELECTRIC - EARLY POWER 12/11/2020 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 11/05/2020 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 10/29/2020 APPROVED CSTONE
INSULATION 10/28/2020 Approval - Private Provider PPROVIDER
ALL ROUGH 10/26/2020 Approval - Private Provider PPROVIDER
Note: All rough, window/door installation
ROOF VALLEY & METAL 10/05/2020 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/29/2020 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 09/16/2020 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 08/11/2020 APPROVED TBAKER
MONOLITHIC SLAB 08/05/2020 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 07/29/2020 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 06/17/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 08/10/2020 08/10/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 08/10/2020 08/11/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 06/05/2020 06/05/2020
Note: Released By: TDOAK Per recorded plat, section 34 Easthampton is in Seminole Woods
SWALE COMPLETE 06/05/2020 07/02/2020
Note: Released By: TBAKER
CUSVC COMPLETE 06/04/2020 06/05/2020
Note: Released By: HHAND
ENGIN1 COMPLETE 06/04/2020 06/05/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/04/2020 06/08/2020
Note: Released By: CSTONE
SW1 COMPLETE 06/04/2020 06/05/2020
Note: Released By: CTROHA
UTL COMPLETE 06/04/2020 06/08/2020
Note: Released By: AHALL
ZON HOLD 06/04/2020 06/04/2020
Note: Held By: ELENS Need to correct the legal description on the survey and site plan. (Says Seminole Woods)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
STORMWATER REINSPECTION FEE ¤40.00 01/27/2021
SEWER CREDIT (¤2,465.75) 06/10/2020
SEWER INSPECTION ¤25.00 06/10/2020
SEWER CAPITAL FACILITY ¤4,596.07 06/10/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 06/10/2020
METER - DEPOSIT ¤60.00 06/10/2020
WATER- TURN ON ¤25.00 06/10/2020
ADMIN FEE ¤20.00 06/10/2020
CONNECTION FEES ¤1,002.88 06/10/2020
IMPACT FEE FIRE ¤223.38 06/10/2020
IMPACT FEE PARKS ¤849.24 06/10/2020
IMPACT FEE SCHOOL ¤3,600.00 06/10/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 06/10/2020
WATER -IRRIGATION INSPECTION ¤25.00 06/10/2020
PERMIT FEE ¤125.00 06/10/2020
SITE PLAN 20 ¤20.00 06/10/2020
SURCHARGE FS 533.721 ¤2.00 06/10/2020
SURCHARGE - FS 468.631 ¤2.48 06/10/2020
STORM WATER PERMIT FEES ¤80.00 06/10/2020
Fees Total Due: ¤0.00 Total Paid: ¤13,278.48