Permit #2020060213
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01310-0270 |
| CONDITIONED SPACE: 2081 sqft |
| GARAGE: 623 sqft |
| OPENED PORCH (WITH ROOF) : 159 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| Total Square Footage: 2897 sqft |
| Block: 01310 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386) 672-8285 |
| Location Address: 75 EDWARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/10/2020 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: RENDINO RICHARD & ELLEN H&W |
|
Address 3232 W TARO LANE PHOENIX, AZ 85027 |
| Lot: 0270 |
| Contracted Stated Job Value: ¤189,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
Inspection History
| Type | Request Date | Result | Inspector |
| PLUMBING FINAL | 02/01/2021 | Approval - Private Provider | PPROVIDER |
| Note: 02/01/2021 Building and MEP final inspections passed. | |||
| HVAC FINAL | 02/01/2021 | Approval - Private Provider | PPROVIDER |
| Note: 02/01/2021 Building and MEP final inspections passed. | |||
| ELECTRIC FINAL | 02/01/2021 | Approval - Private Provider | PPROVIDER |
| Note: 02/01/2021 Building and MEP final inspections passed. | |||
| BLD - BUILDING FINAL | 02/01/2021 | Approval - Private Provider | PPROVIDER |
| Note: 02/01/2021 Building and MEP final inspections passed. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/28/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 01/27/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION no final survey under general muni code sec 42-49 not ready for inspection CORRECTIONS MADE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/27/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION ALL DISTURBED AREAS RESTORED TO LIKE OR BETTER CONDITIONS SEC 42-52 OF RESIDENTIAL MUNICODES THE GRAS IN THE SWALE NEEDS TO BE FIXED SOD REPLACEMENT NEEDS TO MATCH EXISTING SOD CORRECTIONS MADE | |||
| ROW - STORMWATER FINAL | 01/27/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/26/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: ALL DISTURBED AREAS RESTORED TO LIKE OR BETTER CONDITIONS SEC 42-52 OF RESIDENTIAL MUNICODES THE GRAS IN THE SWALE NEEDS TO BE FIXED SOD REPLACEMENT NEEDS TO MATCH EXISTING SOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/26/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 01/22/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: no final survey under general municode sec 42-49 not ready for inspection | |||
| U-CROSS CONNECTION | 01/20/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation | |||
| ROW- PROJECT STATUS | 01/14/2021 | APPROVED - AS NOTED | CTROHA |
| Note: Met on site with builder to discuss the swale elevations. Match existing elevations at the property lines and carry the flow line through which will bury the culvert aproximately 2 tenths | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2021 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. pipe is good | |||
| U - SEWER TIE IN | 12/23/2020 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 12/23/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 12/11/2020 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 11/05/2020 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 10/29/2020 | APPROVED | CSTONE |
| INSULATION | 10/28/2020 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/26/2020 | Approval - Private Provider | PPROVIDER |
| Note: All rough, window/door installation | |||
| ROOF VALLEY & METAL | 10/05/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/29/2020 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 09/16/2020 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 08/11/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/05/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/29/2020 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 06/17/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/10/2020 | 08/10/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 08/10/2020 | 08/11/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 06/05/2020 | 06/05/2020 |
| Note: Released By: TDOAK Per recorded plat, section 34 Easthampton is in Seminole Woods | |||
| SWALE | COMPLETE | 06/05/2020 | 07/02/2020 |
| Note: Released By: TBAKER | |||
| CUSVC | COMPLETE | 06/04/2020 | 06/05/2020 |
| Note: Released By: HHAND | |||
| ENGIN1 | COMPLETE | 06/04/2020 | 06/05/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/04/2020 | 06/08/2020 |
| Note: Released By: CSTONE | |||
| SW1 | COMPLETE | 06/04/2020 | 06/05/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 06/04/2020 | 06/08/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 06/04/2020 | 06/04/2020 |
| Note: Held By: ELENS Need to correct the legal description on the survey and site plan. (Says Seminole Woods) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/27/2021 |
| SEWER CREDIT | (¤2,465.75) | 06/10/2020 |
| SEWER INSPECTION | ¤25.00 | 06/10/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/10/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/10/2020 |
| METER - DEPOSIT | ¤60.00 | 06/10/2020 |
| WATER- TURN ON | ¤25.00 | 06/10/2020 |
| ADMIN FEE | ¤20.00 | 06/10/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/10/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/10/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/10/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/10/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/10/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/10/2020 |
| PERMIT FEE | ¤125.00 | 06/10/2020 |
| SITE PLAN 20 | ¤20.00 | 06/10/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/10/2020 |
| SURCHARGE - FS 468.631 | ¤2.48 | 06/10/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/10/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,278.48 |