Permit #2020060437
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00030-0020 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00030 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 904-268-7730 |
| Location Address: 3 PHOENIX LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/30/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD ROAD STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/19/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 11/19/2020 | FINAL APPROVED | LFITZGERALD |
| Note: water meter pit installed too far forwards not allowing ball valve to be open more than lass than a third-Rich from utility informed and said he woulod take care of | |||
| ROW - STORMWATER FINAL | 11/18/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION A LOT OF WATER ON THE RIGHT REAR SIDE OF THE HOUSE GOING TO ALL THE WAY TO THE RIGHT SIDE OF THE HOUSE FROM THE SPRINKLER IT'S ALL THE WAY TO THE RIGHT SIDE PLEASE REMOVE THE PIECES THE CONCRETE INSIDE THE PIPE RIGHT SIDE 11/16/2020= COLVERT PIPE IS CLEAN= IT SEEMS THAT THERE WERE NO CHANGES AT ALL IN THE REAR RIGHT SIDE 11/18/2020= CORRECTION MADE IT | |||
| ROW - STORMWATER FINAL | 11/16/2020 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION A LOT OF WATER ON THE RIGHT REAR SIDE OF THE HOUSE GOING TO ALL THE WAY TO THE RIGHT SIDE OF THE HOUSE FROM THE SPRINKLER IT'S ALL THE WAY TO THE RIGHT SIDE PLEASE REMOVE THE PIECES THE CONCRETE INSIDE THE PIPE RIGHT SIDE 11/16/2020= COLVERT PIPE IS CLEAN= IT SEEMS THAT THERE WERE NO CHANGES AT ALL IN THE REAR RIGHT SIDE | |||
| ROW - FINAL APRON (AFTER POUR) | 11/12/2020 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 11/12/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: A LOT OF WATER ON THE RIGHT REAR SIDE OF THE HOUSE GOING TO ALL THE WAY TO THE RIGHT SIDE OF THE HOUSE FROM THE SPRINKLER IT'S ALL THE WAY TO THE RIGHT SIDE PLEASE REMOVE THE PIECES THE CONCRETE INSIDE THE PIPE RIGHT SIDE | |||
| U-CROSS CONNECTION | 11/12/2020 | APPROVED - AS NOTED | JHARDING |
| Note: Approved. No irrigation. No cross connections | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/09/2020 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/09/2020 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 10/16/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:54 am | |||
| U - SEWER TIE IN | 10/09/2020 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 09/23/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: *LOWER FORM IS 1 1/2" WIDER THAN THE UPPER. *FIX ROAD FORM THAT IS LOWER. *I WOULD ADD A FORM TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE. *It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/21/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: NOT FORMED YET AND FULL OF WATER FROM OVER THE WEEKEND RAIN. | |||
| INSULATION | 09/08/2020 | APPROVED | MMESSER |
| PEP TANK INSTALLATION REQUEST | 09/04/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 08/31/2020 | APPROVED | FWILLIS |
| ALL ROUGH | 08/31/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/27/2020 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 08/26/2020 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 08/18/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/10/2020 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 08/03/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/28/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/28/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/02/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/17/2020 | 08/17/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 08/17/2020 | 08/18/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 07/02/2020 | 07/06/2020 |
| Note: Released By: ELENS | |||
| UTL | COMPLETE | 07/02/2020 | 07/07/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 06/25/2020 | 06/25/2020 |
| Note: Released By: ELENS | |||
| ELEC | COMPLETE | 06/25/2020 | 06/26/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 06/25/2020 | 06/25/2020 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 06/25/2020 | 06/26/2020 |
| Note: Released By: CPISCITELLI | |||
| SWALE | COMPLETE | 06/10/2020 | 07/07/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 06/10/2020 | 06/10/2020 |
| Note: Held By: ELENS The site plan and landscape plan are garage right and the floor plan is garage left. They all must match. | |||
| BLD | HOLD | 06/09/2020 | 06/10/2020 |
| Note: Held By: JPI 1. Provide dutch gable roof details. Provide section cut through with all bracing, attachments and construction details. 2. Provide valley truss attachment details. 3. Provide valley truss gable end details with all construction details. 4. Page 6.0 calls for Detail 3 (?) on page WF18A (?), cannot locate detail/page or note. | |||
| CUSVC | COMPLETE | 06/09/2020 | 06/10/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 06/09/2020 | 06/10/2020 |
| Note: Held By: JMUNSON Need smoke alarms in all bedrooms and need smoke/carbon alarms outside of all bedrooms. FBC 314.3 and 315.1 | |||
| ENGIN1 | COMPLETE | 06/09/2020 | 06/10/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/09/2020 | 06/11/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 06/09/2020 | 06/11/2020 |
| Note: Held By: CPISCITELLI 1. Heatload does not match the site plan. Revise to match. 2. Duct Drawing needs to be signed by the AC contractor | |||
| PLUM | COMPLETE | 06/09/2020 | 06/10/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 06/09/2020 | 06/10/2020 |
| Note: Released By: RGROSS | |||
| UTL | COMPLETE | 06/09/2020 | 06/12/2020 |
| Note: Released By: AHALL |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/23/2020 |
| REINSPECTION FEE | ¤40.00 | 11/23/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 06/30/2020 |
| SITE PLAN 20 | ¤20.00 | 06/30/2020 |
| SURCHARGE FS 533.721 | ¤11.51 | 06/30/2020 |
| SURCHARGE - FS 468.631 | ¤17.27 | 06/30/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/30/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 06/30/2020 |
| SEWER CREDIT | (¤650.00) | 06/30/2020 |
| SEWER INSPECTION | ¤25.00 | 06/30/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/30/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/30/2020 |
| METER - DEPOSIT | ¤60.00 | 06/30/2020 |
| WATER- TURN ON | ¤25.00 | 06/30/2020 |
| ADMIN FEE | ¤20.00 | 06/30/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/30/2020 |
| ELECTRIC FEE | ¤207.00 | 06/30/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/30/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/30/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/30/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/30/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/30/2020 |
| MECHANICAL FEE | ¤207.00 | 06/30/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/30/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/30/2020 |
| PLAN CHECK FEE | ¤98.00 | 06/30/2020 |
| PLUMBING FEE | ¤207.00 | 06/30/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,160.13 |