Permit #2020060503

Permit Details

Status: COED

Parcel Id: 05-11-31-5918-00000-0020
CONDITIONED SPACE: 2774 sqft
GARAGE: 623 sqft
OPENED PORCH (WITH ROOF) : 689 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 4160 sqft
Block: 00000
Subdivision: 2244 - VILLAGE AT PALM COAST PH 1
Job Phone: 386-447-4400
Location Address: 29 RIVERVIEW BEND S
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/13/2020
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: BROWN JAMES TAYLOR & VANESSA F BROWN H&W

Address

5 N VILLAGE DRIVE

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤520,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
FRANK E SEVERINO
Status Location Address State License Number Phone Fax
ACTIVE

1360 N NOVA RD

DAYTONA BEACH, FL 32117

CBC060543 (Exp: 08/31/2026) 386-253-1943 386-238-0139
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/27/2021 FINAL APPROVED RMARTIN
U -UTILITY RESIDENTIAL FINAL 09/27/2021 FINAL APPROVED LFITZGERALD
BLD - BUILDING FINAL 09/21/2021 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 09/08/2021 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 09/03/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 09/03/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 09/03/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 09/03/2021 APPROVED KRUTH
ELECTRIC - EARLY POWER 05/14/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:15
ROW- PRE-APRON (PRE-POUR) 05/05/2021 APPROVED KRUTH
INSULATION 03/15/2021 APPROVED BGREVE
ALL ROUGH 03/09/2021 APPROVED - AS NOTED WMILLER
Note: need the following by insulation inspection. complete the low voltage and add nail plates on low voltage (check all) missing screws at arched windows
LATH/BRICK/ WATER BARRIER 03/05/2021 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/19/2021 APPROVED WMILLER
ROOF VALLEY & METAL 01/19/2021 APPROVED WMILLER
ELECTRIC-TUG 12/21/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 11:40 am
TIE BEAM / LINTEL 12/14/2020 APPROVED JBODEN
FOUND SURVEY APPROVED (OFFICE) 12/04/2020 APPROVED TBAKER
MONOLITHIC SLAB 11/12/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 11/09/2020 CANCELLED BY APPLICANT TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 11/03/2020 APPROVED - AS NOTED JGIBSON
Note: 4'' FLOOR DRAIN IN GARAGE AREA IS FOR FUTURE ICE MACHINE ONLY
GRAVITY SEWER TEST 11/03/2020 APPROVED JGIBSON
U - SEWER TIE IN 11/03/2020 APPROVED JGIBSON
STEM WALL FOUNDATION 10/07/2020 APPROVED TSTAUFFACHER
FOOTER 09/17/2020 APPROVED MMESSER
WATER METER INSTALLATION REQUEST 07/24/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 01/20/2021 01/20/2021
Note: Released By: PBUCKLEY Permit is a 2020 permit and PRoduct Approval Numbers only need to conform to the 2017 FBCR, not the 2020 FBCR
BLD HOLD 01/14/2021 01/20/2021
Note: Held By: FREODICA Provide code version 2020 of all revised product approval FL 251.10 - for sliding glass door, FL 239.7 - for single hung window and FL 243.9 - for fixed window per F.S. 553.846. FReodica -386-986=4734.
ENGIN1 COMPLETE 12/03/2020 12/04/2020
Note: Released By: TBAKER
ZON COMPLETE 12/03/2020 12/03/2020
Note: Released By: TDOAK
BLD COMPLETE 07/29/2020 08/04/2020
Note: Released By: PBUCKLEY
BLD COMPLETE 06/23/2020 06/30/2020
Note: Released By: FREODICA
ZON COMPLETE 06/23/2020 06/23/2020
Note: Released By: ELENS
MECH COMPLETE 06/23/2020 06/23/2020
Note: Released By: CPISCITELLI
BLD HOLD 06/18/2020 06/18/2020
Note: Held By: PBUCKLEY 1. Product approval missing the following items: soffit, underlayment/roofing, roof vents, mullions and lintels.
BLD HOLD 06/10/2020 06/11/2020
Note: Held By: JPI 1. General note: smoke and carbon monoxide detectors to maintain clearances from supply/return ductwork, bathrooms, kitchen cooking appliances, etc… per R314/315. Smoke detectors to be placed in highest part of ceiling. 2. Provide design loads, both gravity and lateral are required, per R301. 3. Components and cladding pressures per fig R301.2(7). 4. Correct page numbers. Section cuts and pages are not correct. Suggest a cover sheet with drawing index be submitted. 5. Foundation plans illustrates change to footing at lanai from S1 to M3. S1 footing is called out for majority of structure but is not illustrated as a spread footing. Clarify. 6. Front entry calls for a spread footing with 20” columns, no pad footing. Clarify entire front footing details and call outs. 7. Uncovered concrete patio does not illustrate slope. 8. Identify hazardous glass locations. R308.4 9. Product approval missing the following items: soffit, underlayment/roofing, roof vents, mullions and lintels. 10. Energy calcs and EPL card must be signed by owner/agent/builder.
CUSVC COMPLETE 06/10/2020 06/10/2020
Note: Released By: HHAND
ELEC COMPLETE 06/10/2020 06/11/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/10/2020 06/11/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/10/2020 06/11/2020
Note: Released By: CSTONE
MECH HOLD 06/10/2020 06/11/2020
Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder
PLUM COMPLETE 06/10/2020 06/11/2020
Note: Released By: JPI
SW1 COMPLETE 06/10/2020 06/11/2020
Note: Released By: CTROHA
UTL COMPLETE 06/10/2020 06/12/2020
Note: Released By: AHALL
ZON HOLD 06/10/2020 06/11/2020
Note: Held By: ELENS Please provide driveway width at garage door. Also, walkway width to entry.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - FIELD SURVEY INSPECT ¤20.00 10/05/2021
STORM WATER PERMIT FEES ¤80.00 07/13/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 07/13/2020
SEWER INSPECTION ¤25.00 07/13/2020
SEWER CAPITAL FACILITY ¤4,596.07 07/13/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 07/13/2020
METER - DEPOSIT ¤60.00 07/13/2020
WATER-METER ¤434.59 07/13/2020
ADMIN FEE ¤20.00 07/13/2020
CONNECTION FEES ¤25.00 07/13/2020
BUILDING DISCOUNT 100% (¤2,384.00) 07/13/2020
ELECTRIC FEE ¤372.00 07/13/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/13/2020
IMPACT FEE FIRE ¤223.38 07/13/2020
IMPACT FEE PARKS ¤849.24 07/13/2020
IMPACT FEE SCHOOL ¤3,600.00 07/13/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 07/13/2020
MECHANICAL FEE ¤372.00 07/13/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/13/2020
PLAN CHECK FEE ¤208.00 07/13/2020
PLUMBING FEE ¤372.00 07/13/2020
NEW RESIDENTIAL INSPECTIONS ¤1,040.00 07/13/2020
SITE PLAN 20 ¤20.00 07/13/2020
SURCHARGE FS 533.721 ¤2.00 07/13/2020
SURCHARGE - FS 468.631 ¤2.00 07/13/2020
Fees Total Due: ¤0.00 Total Paid: ¤16,246.51