I want to search for...
Permit #2020060512
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00590-0010 |
| CONDITIONED SPACE: 1964 sqft |
| GARAGE: 579 sqft |
| OPENED PORCH (WITH ROOF) : 410 sqft |
| OPENED PORCH (WITH ROOF) : 146 sqft |
| Total Square Footage: 3099 sqft |
| Block: 00590 |
| Subdivision: - |
| Job Phone: 386-447-7007 |
| Location Address: 25 ZEPHYR LILY TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/31/2020 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: GRATI, IGOR |
|
Address 3845 MAPLE AVE BROOKLYN, NY 11224 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/08/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 09/17/2021 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION Top of pep tank broken. Called Ivan(9-14-21) with utilites to have fixed. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/14/2021 | CANCELLED BY APPLICANT | JHARDING |
| Note: Top of pep tank broken. Called Ivan(9-14-21) with utilites to have fixed. | |||
| U-CROSS CONNECTION | 09/14/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/13/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 09/13/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Finished Floor Elevation is not a minimum 0f 12 inches above the crown of the road. The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/13/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 09/13/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 09/10/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A REINSPECTION Finished Floor Elevation is not a minimum 0f 12 inches above the crown of the road. The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/02/2021 | Disapproved - NO FEE | RGROSS |
| Note: Finished Floor Elevation is not a minimum 0f 12 inches above the crown of the road. | |||
| ELECTRIC - EARLY POWER | 08/11/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Email FPL | |||
| ELECTRIC - EARLY POWER | 08/09/2021 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL DOORS LOCKED, NEED ACCESS FOR INSPECTION, YOU MAY LEAVE LOCK BOX CODE IN INSPECTION NOTES OR CALL INSPECTOR AND GIVE IT TO HIM, ALSO NEED TO PROTECT UFER GROUND CONDUCTOR PER.... NEC 250 | |||
| ROW- PROJECT STATUS | 05/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION ADDED ON 5/13/2021 12:12:01 PM Remove asphalt from swale that was taken from the canal by a resident who witnessed sub-contractor dumping it. Repair silt fencing Remove silt that washed in to the canal at the left rear IS ALMOST READY FOR SOD BUILDER NEED TO REPAIR THE BACK LEFT CORNER WITH SOD AND ANY WASH OUT RESULT IN BEFORE SOD | |||
| ROW- PROJECT STATUS | 05/13/2021 | Disapproved - NO FEE | CTROHA |
| Note: Remove asphalt from swale that was taken from the canal by a resident who witnessed sub-contractor dumping it. Repair silt fencing Remove silt that washed in to the canal at the left rear Reinspection scheduled for 5/19/21 | |||
| ELECTRIC - EARLY POWER | 05/04/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: Not ready | |||
| GRAVITY SEWER TEST | 04/06/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/06/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 04/05/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION 4/1/21 - 11:01am. Must be a minimum of 5 inches at the road edge. Face board cannot be placed over the edge of asphalt road. Photo attached. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/01/2021 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 04/01/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION 4/1/21 - 11:01am. Must be a minimum of 5 inches at the road edge. Face board cannot be placed over the edge of asphalt road. Photo attached. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/30/2021 | CANCELLED BY APPLICANT | RGROSS |
| PEP TANK INSTALLATION REQUEST | 03/16/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 02/24/2021 | APPROVED | TSTAUFFACHER |
| INSULATION | 02/10/2021 | APPROVED | MMESSER |
| ALL ROUGH | 02/05/2021 | APPROVED - AS NOTED | JBODEN |
| Note: Install framing around panel and at dryer vent and washer vent Missing screws in dining room transom window Install entry transom and exterior door at storage area where a/c is Seal longitudinal seams at 3x10 kitchen exhaust Provide 5ft of head pressure Check all at insulation | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/03/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Work not complete--01/05/2021--12:08 PM THIS IS A REINSPECTION Truss engineering not complete Sheathing is approved. OK to dry in | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/25/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Work not complete--01/05/2021--12:08 PM THIS IS A REINSPECTION Truss engineering not complete Sheathing is approved. OK to dry in | |||
| ROOF VALLEY & METAL | 01/22/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/19/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Truss engineering not complete Sheathing is approved. OK to dry in | |||
| TIE BEAM / LINTEL | 12/28/2020 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION cancelled per max (not ready for am inspection and could not be done in PM because of rout) | |||
| TIE BEAM / LINTEL | 12/22/2020 | Disapproved - NO FEE | WMILLER |
| Note: cancelled per max (not ready for am inspection and could not be done in PM because of rout) | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/14/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/06/2020 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION Proof of Compaction results not in Construction Box. | |||
| MONOLITHIC SLAB | 11/06/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 11/05/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Proof of Compaction results not in Construction Box. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/27/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 09/29/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/11/2020 | 12/14/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 12/11/2020 | 12/11/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 06/24/2020 | 06/24/2020 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 06/18/2020 | 06/18/2020 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 06/18/2020 | 06/18/2020 |
| Note: Held By: AMOBLEY On floor plan page of plans bedroom 4 and bath 3 are not labeled | |||
| BLD | COMPLETE | 06/18/2020 | 06/23/2020 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 06/18/2020 | 06/23/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 06/11/2020 | 07/07/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 06/10/2020 | 06/12/2020 |
| Note: Held By: JPI 1. Provide structural construction details for all wood frame bearing walls. R301. 2. For all attachment of wood framing to masonry, please call out distance from edge of member for first fastener. IE: Fastener start @ 6” from splice and edge of wood member. 3. Page 7 indicates a double 2 x 8 ledger at and adjacent to entry. Provide details for attachment to structure as well as truss attachment to ledger. Provide section cut through area detailing construction. 4. Provide structural cross sections, page 8, indicating all fasteners and tie downs. R301. 5. All cross sections mislabeled on pages 2 and 3. Should reference page 8 rather than page 5. Correct. 6. Product approval submittal lacking items: Zip system, Ply deck roof system, Single hung windows, mullions, transom/casement windows, and roof underlayment (if req with zip system.) | |||
| CUSVC | COMPLETE | 06/10/2020 | 06/12/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 06/10/2020 | 06/11/2020 |
| Note: Held By: JMUNSON 1. Submit load calculations and riser diagram. 2. Need outlet in back bathroom NEC 2014 art 210.52 (D) 3. Need switch and light by door in gargage leading outside. NEC 2014 art 210. 70(2) (b) | |||
| ENGIN1 | COMPLETE | 06/10/2020 | 06/11/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/10/2020 | 06/11/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/10/2020 | 06/11/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 06/10/2020 | 06/12/2020 |
| Note: Held By: JPI 1. Submit riser diagram | |||
| SW1 | COMPLETE | 06/10/2020 | 06/11/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 06/10/2020 | 06/12/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 06/10/2020 | 06/11/2020 |
| Note: Held By: AMOBLEY One additional tree needed on landscape plan. Lot size requires a total of 5 trees. On floor plan page bedroom 4 and bath 3 are not labeled Another form of articulation required in front. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/26/2021 |
| REINSPECTION FEE | ¤40.00 | 10/26/2021 |
| REINSPECTION FEE | ¤40.00 | 10/26/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/26/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 10/26/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 08/31/2020 |
| SEWER CREDIT | (¤850.00) | 08/31/2020 |
| SEWER INSPECTION | ¤25.00 | 08/31/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 08/31/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 08/31/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/31/2020 |
| METER - DEPOSIT | ¤60.00 | 08/31/2020 |
| WATER- TURN ON | ¤25.00 | 08/31/2020 |
| ADMIN FEE | ¤20.00 | 08/31/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤600.00 | 08/31/2020 |
| SITE PLAN 20 | ¤20.00 | 08/31/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/31/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/31/2020 |
| CONNECTION FEES | ¤1,002.88 | 08/31/2020 |
| BUILDING DISCOUNT 100% | (¤1,460.00) | 08/31/2020 |
| ELECTRIC FEE | ¤240.00 | 08/31/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/31/2020 |
| IMPACT FEE FIRE | ¤223.38 | 08/31/2020 |
| IMPACT FEE PARKS | ¤849.24 | 08/31/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/31/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 08/31/2020 |
| MECHANICAL FEE | ¤240.00 | 08/31/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/31/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/31/2020 |
| PLAN CHECK FEE | ¤120.00 | 08/31/2020 |
| PLUMBING FEE | ¤240.00 | 08/31/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,806.35 |