I want to search for...
Permit #2020060558
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00450-0090 |
| CONDITIONED SPACE: 1646 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 177 sqft |
| Total Square Footage: 2273 sqft |
| Block: 00450 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 386-447-7007 |
| Location Address: 7 RYBERRY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/31/2020 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: GOLDEN MAGNOLIA INC |
|
Address 1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤220,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| CANCEL |
457 CHELSEA PLACE AV ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2022) | 570-575-8139 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/27/2021 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION No approved prints on site no energy calulations. Missing insulation placard. Unable to test smoke due to dust covers still in place Closet door in tub unable to test. No cooking appliance. The range circut braker installed is 35 amp minimum of 4O required. However unable to confirm size necessary due to missing prints. | |||
| BLD - BUILDING FINAL | 09/23/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: No approved prints on site no energy calulations. Missing insulation placard. Unable to test smoke due to dust covers still in place Closet door in tub unable to test. No cooking appliance. The range circut braker installed is 35 amp minimum of 4O required. However unable to confirm size necessary due to missing prints. Cut out dry wall and insulation in kitchen . | |||
| BLD - BUILDING FINAL | 09/15/2021 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 09/13/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 09/13/2021 | APPROVED | RGROSS |
| Note: LEFT FRONT SWALE HAS SOME SPOTS THAT ARE HIGHER. THEY NEED TO LOWER THOSE SPOT. THE LEFT SIDE OF THE HOUSE HAS SOME PIECES OF SOD THAT NEED TO FIXED. THEY ARE BLOCKING THE WATER FLOW I ALSO SPRAY PAINTED THE AREA IN PINK | |||
| U -UTILITY RESIDENTIAL FINAL | 09/13/2021 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/10/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: LEFT FRONT SWALE HAS SOME SPOTS THAT ARE HIGHER. THEY NEED TO LOWER THOSE SPOT. THE LEFT SIDE OF THE HOUSE HAS SOME PIECES OF SOD THAT NEED TO FIXED. THEY ARE BLOCKING THE WATER FLOW I ALSO SPRAY PAINTED THE AREA IN PINK | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/10/2021 | APPROVED | GBERTOLA |
| U-CROSS CONNECTION | 09/02/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U-CROSS CONNECTION | 09/01/2021 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 08/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Mitered ends NO EQUALS. Top of mitered board ends must be a miminum of 18 inches from the side of the culvert. RIGHT SIDE IS 15 INCHES CHECK THAT THERE IS AT LEAST 18 INCHES FROM EACH SIDE OF THE PIPE TO THE FORM BOARD AT THE TOP OF THE DRIVEWAY SHOULDER CULVERT PIPE IS GOOD culvert pipe is lower then other driveway 2/10 and half i will contac stormwater engineers 08/19/2021=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/18/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A REINSPECTION Mitered ends NO EQUALS. Top of mitered board ends must be a miminum of 18 inches from the side of the culvert. RIGHT SIDE IS 15 INCHES CHECK THAT THERE IS AT LEAST 18 INCHES FROM EACH SIDE OF THE PIPE TO THE FORM BOARD AT THE TOP OF THE DRIVEWAY SHOULDER CULVERT PIPE IS GOOD culvert pipe is lower then other driveway on the right side 2/10 and half. i will contac stormwater engineers for revise | |||
| ROW- PRE-APRON (PRE-POUR) | 08/17/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: Mitered ends NO EQUALS. Top of mitered board ends must be a miminum of 18 inches from the side of the culvert. RIGHT SIDE IS 15 INCHES CHECK THAT THERE IS AT LEAST 18 INCHES FROM EACH SIDE OF THE PIPE TO THE FORM BOARD AT THE TOP OF THE DRIVEWAY SHOULDER CULVERT PIPE IS GOOD | |||
| ELECTRIC - EARLY POWER | 08/05/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Email FPL | |||
| GRAVITY SEWER TEST | 07/26/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 07/26/2021 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 07/12/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 06/24/2021 | APPROVED | MMESSER |
| ALL ROUGH | 06/23/2021 | APPROVED | MMESSER |
| INSULATION | 06/23/2021 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 04/30/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/22/2021 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 04/21/2021 | APPROVED | JGONZALEZ |
| Note: THIS IS A REINSPECTION ADDED ON 3/2/2021 2:15:15 PM | |||
| TIE BEAM / LINTEL | 02/16/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 01/22/2021 | Disapproved - NO FEE | TDOAK |
| MONOLITHIC SLAB | 12/30/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/21/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION PLUMBING SUB-CONTRACTOR HAS CHANGED, NO RISER AT TIME OF INSPECTION, MUST HAVE RISER DRAWN UP BY CORRECT PLUMBING CONTRACTOR | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/18/2020 | Disapproved - NO FEE | JGIBSON |
| Note: PLUMBING SUB-CONTRACTOR HAS CHANGED, NO RISER AT TIME OF INSPECTION, MUST HAVE RISER DRAWN UP BY CORRECT PLUMBING CONTRACTOR | |||
| WATER METER INSTALLATION REQUEST | 09/29/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 04/21/2021 | 04/21/2021 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3753 - JGONZALEZ@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/02/2021 | 03/02/2021 |
| Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM No revised foundation survey has been received showing the house meeting the minimum side setback. | |||
| ZON | COMPLETE | 01/20/2021 | 01/20/2021 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 01/20/2021 | 01/27/2021 |
| Note: Released By: FREODICA Revision - changed foundation, floor plan and elevation views. | |||
| ENGIN1 | COMPLETE | 01/20/2021 | 01/21/2021 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 01/20/2021 | 01/21/2021 |
| Note: Released By: CPISCITELLI | |||
| ENGIN1 | COMPLETE | 01/15/2021 | 01/19/2021 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 01/15/2021 | 01/15/2021 |
| Note: Held By: TDOAK House does not meet minimum 7.5' required side setback. | |||
| PLUM | COMPLETE | 12/21/2020 | 12/30/2020 |
| Note: Released By: FREODICA No change in saniary riser diagram - only plumber. | |||
| BLD | COMPLETE | 08/03/2020 | 08/10/2020 |
| Note: Released By: JPI | |||
| BLD | HOLD | 07/14/2020 | 07/16/2020 |
| Note: Held By: JPI 1. Provide structural construction details for all wood frame bearing walls. 2. Provide splicing and mating details for top plate of bearing wall. 3. Provide full structural cross sections indication all fasteners and tie downs. Page 5. 4. Provide accurate and complete details of roof connections at parapet wall intersections at garage and bedroom. Truss drawings do not appear to take that area into consideration and no details have been provided. Truss plan, page 6/detail 1 does not illustrate truss behind parapet wall. Please clarify. Elevations on page 4 are also in conflict. Please clarify construction in this area. 5. Provide structural construction details for clearstory wall with attachment and window framing details. Provide a full structural construction cross section thru structure at clearstory area. R301. 6. Section 5 illustrates a 2 x 8 frame wall on top of block wall. Please provide details and cross section illustrating full structural construction details. Wall is exterior and subject to wind loads. R301. 7. Section 3 illustrates awning over kitchen window. Provide a full structural construction cross section illustrating method of construction. This overhang is subject to wind loads, full details required. 8. Product approval submittal lacking items: Zip system and roof underlayment (if applicable). 9. Garage floor should indicate slope towards door, R309.1. No response provided. 10. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided. | |||
| CUSVC | COMPLETE | 07/02/2020 | 07/08/2020 |
| Note: Released By: HHAND | |||
| ZON | COMPLETE | 07/02/2020 | 07/06/2020 |
| Note: Released By: ELENS | |||
| MECH | COMPLETE | 07/02/2020 | 07/06/2020 |
| Note: Released By: CPISCITELLI | |||
| ELEC | COMPLETE | 07/02/2020 | 07/06/2020 |
| Note: Released By: JMUNSON | |||
| BLD | HOLD | 07/02/2020 | 07/08/2020 |
| Note: Held By: JPI Held By: JPI 1. Please provide a detailed written response to the comments with revisions clouded on plan and page numbers of new details provided. Or a comparable means of tracking the location of the revisions in the plans. | |||
| SWALE | COMPLETE | 06/12/2020 | 07/09/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 06/11/2020 | 06/15/2020 |
| Note: Held By: JPI 1. Provide structural construction details for all wood frame bearing walls. 2. Provide splicing and mating details for top plate of bearing wall. 3. For all attachment of wood framing to masonry, please call out distance from edge of member for first fastener. IE: Fastener start @ 6” from splice and edge of wood member. 4. Provide size of attic access per R807. 5. Provide full structural cross sections indication all fasteners and tie downs. Page 5. 6. Cross section through lanai mislabeled on Page 3. Should be 5 as there is no 6. Correct. 7. Elevations on Page 4 call out two right elevations. Correct. 8. Provide accurate and complete details of roof connections at parapet wall intersections at garage and bedroom. Truss drawings do not appear to take that area into consideration and not details have been provided. 9. Provide design loads, both lateral and gravity. R301. 10. There is no door schedule, therefore no notes on rating of garage to dwelling door. 11. Provide wall sheathing nailing pattern. 12. Provide structural construction details for clearstory wall with attachment and window framing details. Provide a full structural construction cross section thru structure at clearstory area. 13. Section 5 illustrates a 2 x 8 (exterior?) frame wall on top of block wall. Please provide details and cross section illustrating full structural construction details. 14. Section 3 illustrates awning over kitchen window. Provide a full structural construction cross section illustrating method of construction. 15. Dimension attic access R807. 16. There is no carbon monoxide detector illustrated 10 feet from bedrooms 2 and 3. R315. 17. Product approval submittal lacking items: Zip system, Ply deck roof system, Single hung windows, and roof underlayment (if applicable). 18. Garage floor should indicate slope towards door, R309.1. | |||
| CUSVC | HOLD | 06/11/2020 | 06/12/2020 |
| Note: Held By: HHAND The utility application needs to be corrected. Duplex is checked off rather than single family. | |||
| ELEC | HOLD | 06/11/2020 | 06/15/2020 |
| Note: Held By: JMUNSON 1. Submit load calculations and riser diagram. 2. Need outlets by bathroom sinks NEC 2014 art 210.52 (D) 3. Smoke alarm outside of bedrooms needs to be a smoke/carbon combo. FBC 2017 314.3 and 315.1 | |||
| ENGIN1 | COMPLETE | 06/11/2020 | 06/12/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/11/2020 | 06/16/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 06/11/2020 | 06/15/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of Energy calcs and heatload does not match the site plan. Revise to match the site plan. 2. Duct Drawing needs to be signed by the AC contractor | |||
| PLUM | COMPLETE | 06/11/2020 | 06/15/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 06/11/2020 | 06/12/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 06/11/2020 | 06/17/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 06/11/2020 | 06/12/2020 |
| Note: Held By: AMOBLEY A total of 5 trees needed so one additional tree needed for this lot size Must have a total of 4 shrubs along each side. Left side needs one more shrub |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/17/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/17/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 11/17/2021 |
| REVISION | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2021 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 06/14/2021 |
| ZONING REVIEW | ¤250.00 | 06/14/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 08/31/2020 |
| MECHANICAL FEE | ¤192.00 | 08/31/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/31/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/31/2020 |
| PLAN CHECK FEE | ¤88.00 | 08/31/2020 |
| PLUMBING FEE | ¤192.00 | 08/31/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤440.00 | 08/31/2020 |
| CONNECTION FEES | ¤1,002.88 | 08/31/2020 |
| METER - DEPOSIT | ¤60.00 | 08/31/2020 |
| WATER- TURN ON | ¤25.00 | 08/31/2020 |
| ADMIN FEE | ¤20.00 | 08/31/2020 |
| SITE PLAN 20 | ¤20.00 | 08/31/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/31/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/31/2020 |
| BUILDING DISCOUNT 100% | (¤1,124.00) | 08/31/2020 |
| ELECTRIC FEE | ¤192.00 | 08/31/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/31/2020 |
| IMPACT FEE FIRE | ¤223.38 | 08/31/2020 |
| IMPACT FEE PARKS | ¤849.24 | 08/31/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/31/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/31/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 08/31/2020 |
| SEWER CREDIT | (¤2,850.92) | 08/31/2020 |
| SEWER INSPECTION | ¤25.00 | 08/31/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 08/31/2020 |
| WATER CREDIT | (¤614.58) | 08/31/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 08/31/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,724.85 |