I want to search for...
Permit #2020060734
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7004-00290-0060 |
| Block: 00290 |
| Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE |
| Job Phone: 386-931-0764 |
| Location Address: 251 CORAL REEF CT N |
| Type: SW - SEAWALL |
| Issue Date: 06/16/2020 |
| NOC: RECORDED |
| Applicant name: KEVIN A PECK |
| Owner: AGOSTINHO, SERGIO |
|
Address 22 E CEDAR STREET COLONIA, NJ 07067 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤25,000.00 |
| Job Description: SEAWALL GRAY IN COLOR |
| Type: CN |
Contractor
KEVIN A PECK, INC
| Status | Location Address | Phone |
| INACTIVE |
5845 WALNUT AVE BUNNELL, FL 32110 |
386-931-0764 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEAWALL FINAL | 09/30/2020 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION still needs sealed at west end 9-30-2020... deficiencies above resolved | |||
| SEAWALL FINAL | 09/28/2020 | PARTIALLY APPROVED | WMILLER |
| Note: still needs sealed at west end | |||
| SEAWALL DEADMAN CAP | 09/15/2020 | APPROVED | WMILLER |
| Note: Approved per notes durring turbidity barrier by inspector TS (see turbidity barrier notes for info) | |||
| TURBIDITY BARRIER | 09/14/2020 | FINAL APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Barrier needs to be enclosed on the sides and must encompass the entire scope of the project. 09/14/2020--Turbidity has been corrected. Steel was also complete and I approved to pour. Inspection will be called in for 09/15/2020 It can be approved. | |||
| TURBIDITY BARRIER | 09/08/2020 | Disapproved - NO FEE | MMESSER |
| Note: Barrier needs to be enclosed on the sides and must encompass the entire scope of the project. | |||
| LDSC-PRE-CLEARING | 09/02/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THE OWNER OF THE LOT CLEARED THE WHOLE LOT TO BUILD A HOUSE. THIS INSPECTION IS FOR THE SEAWALL ONLY TO ENSURE THAT THE BUILDER PROTECT EXISTING VEGETATION. THERE IS NO LONGER ANYTHING TO PROTECT. THEREFORE BEING APPROVED AS NOTED. HOMEOWNER TO TALK TO THE BUILDING AND ZONING DEPT ABOUT CLEARING THE LOT BEFORE HAVING THERE APPROVAL. | |||
| LDSC-PRE-CLEARING | 09/01/2020 | CANCELLED BY APPLICANT | WEB |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/16/2020 | 06/16/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 06/16/2020 | 06/16/2020 |
| Note: Released By: RGROSS | |||
| ZON | COMPLETE | 06/16/2020 | 06/16/2020 |
| Note: Released By: TDOAK |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 06/16/2020 |
| PLAN CHECK FEE | ¤40.00 | 06/16/2020 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 06/16/2020 |
| SITE PLAN 20 | ¤20.00 | 06/16/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/16/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/16/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/16/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤204.00 |