Permit #2020060766
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-1240 |
| GARAGE: 642 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| OPENED PORCH (WITH ROOF) : 302 sqft |
| CONDITIONED SPACE: 2224 sqft |
| Total Square Footage: 3210 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: (386)383-0376 |
| Location Address: 6 TURKEY OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/17/2020 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: ROVEGNO ROBERT W & JUDITH M EDWARD JTWROS |
|
Address 58 HEMINGWAY LN SIMPSONVILLE, SC 29681 |
| Lot: 1240 |
| Contracted Stated Job Value: ¤410,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
WILLIAM D ALLEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
546 S. SHELL ROAD DEBARY, FL 32713 |
LQ27843 (Exp: 08/13/2024) | 386-668-9592 | (386)668-8577 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/23/2021 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION need to connect DWV and Supply at laundry room sink for test 7-23-21... notes above resolved | |||
| BLD - BUILDING FINAL | 07/22/2021 | Disapproved - NO FEE | WMILLER |
| Note: need to connect DWV and Supply at laundry room sink for test | |||
| ROW - FINAL APRON (AFTER POUR) | 07/16/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 07/16/2021 | APPROVED | RGROSS |
| Note: Met on site with builder and grader I advised to have the sides drain to the rear due to elevtions of the utilities fire hydrant etc per (Kalen Ruth) | |||
| U -UTILITY RESIDENTIAL FINAL | 07/16/2021 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 07/14/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: re-claim for irrigation-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/13/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 07/13/2021 | APPROVED | RGROSS |
| Note: Met on site with builder and grader I advised to have the left side drain to the rear and keep the drainage split on the right side per (Kalen Ruth) | |||
| GAS FINAL | 06/18/2021 | APPROVED | JGIBSON |
| GAS ROUGH | 06/14/2021 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 06/09/2021 | APPROVED - AS NOTED | KRUTH |
| Note: Met on site with builder and grader I advised to have the left side drain to the rear and keep the drainage split on the right side per (Kalen Ruth) | |||
| ELECTRIC - EARLY POWER | 05/10/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2021 | APPROVED | RGROSS |
| ROW- PAVER RESTRAINTS | 03/22/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 02/24/2021 | APPROVED | GBERTOLA |
| U - SEWER TIE IN | 01/27/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/27/2021 | APPROVED | JGIBSON |
| ALL ROUGH | 12/18/2020 | APPROVED | JBODEN |
| INSULATION | 12/18/2020 | APPROVED | JBODEN |
| LATH/BRICK/ WATER BARRIER | 12/14/2020 | APPROVED | JBODEN |
| ALL ROUGH | 12/04/2020 | APPROVED - AS NOTED | WMILLER |
| Note: need the following by insulation 1. fire blocking material at fire place ceiling, FIREBLOCKING MATERIALS R302.11.1 (1-8) (needs to be doubled up) 2. need to box out electric panel 3. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 4. TUB TRENCH SEALED APPENDIX F 303.3.4.2 | |||
| ROOF VALLEY & METAL | 12/03/2020 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/03/2020 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING | 11/06/2020 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING | 11/03/2020 | CANCELLED BY APPLICANT | WMILLER |
| ELECTRIC-TUG | 11/03/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: 1. Emailed FPL at 10:28 am 2. Need to have revision on service by Early Power inspection | |||
| ROOF SHEATHING | 11/02/2020 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. ROOF SHEATHING PANELS NEED TO BE FASTENED TO ROOF FRAMING. PER R803.2.3.1 WOOD STRUCTURAL PANEL SHEATHING SHALL BE FASTENED TO ROOF FRAMING panel sheathing shall be fastened to roof framing 2. ZIP SYSTEM PANELS NEED TO BE INSTALLED SO THAT EIGHT FOOT EDGE IS ORIENTED PERPENDICULAR TO THE FRAMING MEMBERS (PER MANUFACTURER) 3. ZIP SYSTEM PANELS NEED TO BE INSTALLED SO THAT ENTIRE FOUR FOOT EDGE IS SUPPORTED FRAMING MEMBERS (PER MANUFACTURER) | |||
| ROOF SHEATHING | 11/02/2020 | CANCELLED BY APPLICANT | WMILLER |
| Note: This was set accidentally for the 2nd, it was supposed to be set up for the 3rd | |||
| TIE BEAM / LINTEL | 09/22/2020 | APPROVED | WMILLER |
| Note: deficiencies resolve and viewed later at apprixmately 2:48 pm via Vidio conference | |||
| ELEV CERT-FOUNDATION APPROVAL | 09/16/2020 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 09/16/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/28/2020 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/25/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/03/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 07/12/2021 | 07/12/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been accepted. | |||
| BADMIN | HOLD | 06/24/2021 | 06/24/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO TERMITE.PDF | |||
| BADMIN | COMPLETE | 06/24/2021 | 06/24/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/01/2021 | 02/01/2021 |
| Note: Released By: JMUNSON | |||
| ELEC | COMPLETE | 01/29/2021 | 02/01/2021 |
| Note: Released By: JMUNSON | |||
| BLD | CANCEL | 01/19/2021 | 01/20/2021 |
| Note: not needed | |||
| ELEC | HOLD | 01/19/2021 | 01/20/2021 |
| Note: Held By: JMUNSON Plan needs to match the changes. | |||
| BLD | COMPLETE | 11/18/2020 | 11/25/2020 |
| Note: Released By: FREODICA Revision - truss repair | |||
| BADMIN | HOLD | 09/15/2020 | 09/15/2020 |
| Note: Held By: LMUSGROVE Document names and File names must match, No numbers or extra names Ex – site plan=site plan. | |||
| BADMIN | COMPLETE | 09/15/2020 | 09/15/2020 |
| Note: Released By: LMUSGROVE | |||
| ZON | COMPLETE | 09/15/2020 | 09/16/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 09/15/2020 | 09/16/2020 |
| Note: Released By: TBAKER | |||
| PLFM | COMPLETE | 09/15/2020 | 09/16/2020 |
| Note: Released By: JMYERS The Building elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 06/19/2020 | 06/19/2020 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 06/19/2020 | 06/22/2020 |
| Note: Released By: JPI | |||
| PLFM | COMPLETE | 06/17/2020 | 06/17/2020 |
| Note: Released By: JMYERS The Construction elevation certificate has been approved. Please provide Building and Final prior to receiving CO. | |||
| BLD | HOLD | 06/16/2020 | 06/17/2020 |
| Note: Held By: JPI 1. Provide manufacturers installation instructions on linear fireplace. Need to determine if installation in combustible structure is acceptable. | |||
| CUSVC | COMPLETE | 06/16/2020 | 06/17/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 06/16/2020 | 06/17/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 06/16/2020 | 06/18/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/16/2020 | 06/16/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/16/2020 | 06/18/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 06/16/2020 | 06/17/2020 |
| Note: Held By: JPI 1. Provide size of all piping and vents on isometric. | |||
| SW1 | COMPLETE | 06/16/2020 | 06/16/2020 |
| Note: Released By: RGROSS | |||
| UTL | COMPLETE | 06/16/2020 | 06/17/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 06/16/2020 | 06/17/2020 |
| Note: Held By: AMOBLEY Please provide a landscape plan for review The one attached and labeled landscape was a survey not a landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 07/27/2021 |
| REVISION | ¤40.00 | 07/27/2021 |
| REINSPECTION FEE | ¤40.00 | 07/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤820.00 | 07/17/2020 |
| SITE PLAN 20 | ¤20.00 | 07/17/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/17/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/17/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/17/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 07/17/2020 |
| SEWER INSPECTION | ¤25.00 | 07/17/2020 |
| METER - DEPOSIT | ¤60.00 | 07/17/2020 |
| WATER-METER | ¤434.59 | 07/17/2020 |
| WATER-METER | ¤361.04 | 07/17/2020 |
| ADMIN FEE | ¤20.00 | 07/17/2020 |
| CONNECTION FEES | ¤25.00 | 07/17/2020 |
| BUILDING DISCOUNT 100% | (¤1,922.00) | 07/17/2020 |
| ELECTRIC FEE | ¤306.00 | 07/17/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/17/2020 |
| IMPACT FEE FIRE | ¤223.38 | 07/17/2020 |
| IMPACT FEE PARKS | ¤849.24 | 07/17/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/17/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 07/17/2020 |
| MECHANICAL FEE | ¤306.00 | 07/17/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/17/2020 |
| PLAN CHECK FEE | ¤164.00 | 07/17/2020 |
| PLUMBING FEE | ¤306.00 | 07/17/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤8,737.30 |