Permit #2020060813
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00060-0410 |
| CONDITIONED SPACE: 2286 sqft |
| GARAGE: 588 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 3235 sqft |
| Block: 00060 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 66 BANNERWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/30/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD ROAD SUITE 202 JACKSONVILLE, FL 32257 |
| Lot: 0410 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL SURVEY (OFFICE USE ONLY) | 12/21/2020 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Right side drainage conveyance does not consistantly flow forward from back to front. Compare property elevations coming forward 26.45, 26.35. 26.40, 26.50. Then see just inside the same property line 26.35, 26.70. These elevations indicate that the water will pond in the right rear of the property. 12/17/2020=Right side drainage conveyance does not consistantly flow forward from back to front right side in the back we have 26.40 -26.60 -26,30 water will pond in the right rear of the property. Left side we have 26.75- 26.70 and 26.80 water will pond in the left rear of the property. correction made it | |||
| BLD - BUILDING FINAL | 12/21/2020 | FINAL APPROVED | WMILLER |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/21/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION 12/17/2020=Right side drainage conveyance does not consistantly flow forward from back to front right side in the back we have 26.40 -26.60 -26,30 water will pond in the right rear of the property. Left side we have 26.75- 26.70 and 26.80- 26.45 water will pond in the left rear of the property. grass need to be under the fence line or 4 inch away berm running flat on the left side at the end of the property line we need to raise to prevent water go to the neighbour property 12.21/2020=CORRECTION MADE | |||
| U -UTILITY RESIDENTIAL FINAL | 12/21/2020 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 12/18/2020 | APPROVED | GBERTOLA |
| ROW - FINAL APRON (AFTER POUR) | 12/18/2020 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/17/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: 12/17/2020=Right side drainage conveyance does not consistantly flow forward from back to front right side in the back we have 26.40 -26.60 -26,30 water will pond in the right rear of the property. Left side we have 26.75- 26.70 and 26.80- 26.45 water will pond in the left rear of the property. grass need to be under the fence line or 4 inch away berm running flat on the left side at the end of the property line we need to raise to prevent water go to the neighbour property | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/17/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A REINSPECTION Right side drainage conveyance does not consistantly flow forward from back to front. Compare property elevations coming forward 26.45, 26.35. 26.40, 26.50. Then see just inside the same property line 26.35, 26.70. These elevations indicate that the water will pond in the right rear of the property. 12/17/2020=Right side drainage conveyance does not consistantly flow forward from back to front right side in the back we have 26.40 -26.60 -26,30 water will pond in the right rear of the property. Left side we have 26.75- 26.70 and 26.80 water will pond in the left rear of the property. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/03/2020 | Disapproved - NO FEE | RGROSS |
| Note: Right side drainage conveyance does not consistantly flow forward from back to front. Compare property elevations coming forward 26.45, 26.35. 26.40, 26.50. Then see just inside the same property line 26.35, 26.70. These elevations indicate that the water will pond in the right rear of the property. | |||
| U-CROSS CONNECTION | 11/23/2020 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN. | |||
| U - SEWER TIE IN | 11/05/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 11/02/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION COULD NOT LOCATE UFER GROUND CONNECTION POINT, NEC 250.66 A !0/22/20 UFER STILL COVERED, CONTRACTOR NEEDS TO MEET ON SITE ON RE-INSPECTION 11:2/20 EMAILED FPL RELEASED POWER 10:25 | |||
| ELECTRIC - EARLY POWER | 10/22/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: THIS IS A REINSPECTION COULD NOT LOCATE UFER GROUND CONNECTION POINT, NEC 250.66 A !0/22/20 UFER STILL COVERED, CONTRACTOR NEEDS TO MEET ON SITE ON RE-INSPECTION | |||
| ELECTRIC - EARLY POWER | 10/21/2020 | Disapproved - NO FEE | RMARTIN |
| Note: COULD NOT LOCATE UFER GROUND CONNECTION POINT, NEC 250.66 A | |||
| ROW- PRE-APRON (PRE-POUR) | 10/01/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION SUB BASE TO SOFT TO POUR, WATER UNDER AND INSIDE THE PIPE, FACE BOARD NEED TO BE SECURE AND STRAIGHT 10/01/2020 BY THE GARAGE ARE IS NOT 4 INCH THICK TALK TO SUPER AND HIS IS WORKING ON IT | |||
| ROW- PRE-APRON (PRE-POUR) | 09/28/2020 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 09/28/2020 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: SUB BASE TO SOFT TO POUR, WATER UNDER AND INSIDE THE PIPE, FACE BOARD NEED TO BE SECURE AND STRAIGHT | |||
| LATH/BRICK/ WATER BARRIER | 09/04/2020 | APPROVED | JBODEN |
| INSULATION | 09/03/2020 | APPROVED - AS NOTED | JBODEN |
| Note: seal penetrations at exterior garage walls | |||
| ALL ROUGH | 09/01/2020 | APPROVED | JBODEN |
| ROOF VALLEY & METAL | 08/26/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need to twist strap and tapcon at front entrance | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/18/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/13/2020 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 08/12/2020 | APPROVED | JCOLASANTI |
| Note: PLEASE SCHULES TO INSPECT LAT AFTERNOON PLEASE thanks Holly 904-495-3024 | |||
| MONOLITHIC SLAB | 08/04/2020 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/29/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/29/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/16/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/17/2020 | 08/17/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 08/17/2020 | 08/18/2020 |
| Note: Released By: TBAKER | |||
| PLUM | COMPLETE | 06/23/2020 | 06/23/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 06/18/2020 | 07/10/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 06/17/2020 | 06/18/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/17/2020 | 06/19/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 06/17/2020 | 06/17/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 06/17/2020 | 06/18/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/17/2020 | 06/17/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 06/17/2020 | 06/19/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 06/17/2020 | 06/18/2020 |
| Note: Held By: JPI 1. Isometric indicates a tub in hall bath adjacent to den. Shower shown on plans. 2. Length of wet vent for washing machine to vent at laundry tub must meet requirements of P3108.5 and Table 3105.1. Please verify vent length. Based on scaled plans it would exceed the requirement. | |||
| SW1 | COMPLETE | 06/17/2020 | 06/17/2020 |
| Note: Released By: RGROSS | |||
| UTL | COMPLETE | 06/17/2020 | 06/18/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 06/17/2020 | 06/17/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/18/2020 |
| REINSPECTION FEE | ¤40.00 | 12/18/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 06/30/2020 |
| SITE PLAN 20 | ¤20.00 | 06/30/2020 |
| SURCHARGE FS 533.721 | ¤13.33 | 06/30/2020 |
| SURCHARGE - FS 468.631 | ¤20.00 | 06/30/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/30/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 06/30/2020 |
| SEWER CREDIT | (¤1,138.66) | 06/30/2020 |
| SEWER INSPECTION | ¤25.00 | 06/30/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/30/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/30/2020 |
| METER - DEPOSIT | ¤60.00 | 06/30/2020 |
| WATER- TURN ON | ¤25.00 | 06/30/2020 |
| ADMIN FEE | ¤20.00 | 06/30/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/30/2020 |
| ELECTRIC FEE | ¤235.80 | 06/30/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/30/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/30/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/30/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/30/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/30/2020 |
| MECHANICAL FEE | ¤235.80 | 06/30/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/30/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/30/2020 |
| PLAN CHECK FEE | ¤117.20 | 06/30/2020 |
| PLUMBING FEE | ¤235.80 | 06/30/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,877.62 |