Permit #2020060837

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00330-0130
CONDITIONED SPACE: 1817 sqft
GARAGE: 433 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
Total Square Footage: 2474 sqft
Block: 00330
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: (386)437-1508
Location Address: 74 RALEIGH DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/24/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: YOUNG JOE

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0130
Contracted Stated Job Value: ¤180,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/11/2021 FINAL APPROVED MMESSER
U -UTILITY RESIDENTIAL FINAL 01/11/2021 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 01/08/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE REPAIR THE SWALES ON BOTH SIDE 01/08/2021= correction made
ROW - STORMWATER FINAL 01/07/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE REPAIR THE SWALES ON BOTH SIDE
ROW - FINAL APRON (AFTER POUR) 01/07/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION BEFORE YOU SCHEDULE A FINAL-APRON (AFTER-POUR) ? CHECK FOR AN EXPANSION JOINT CUT DOWN THE CENTER AND LENGTH OF THE PIPE. ? CHECK FOR DIRT AND SOD. COMPACTED DIRT AND SOD MUST BE PLACED AROUND ALL EDGES OF THE POURED CONCRETE INCLUDING THE DRIVEWAY SHOULDERS TO PREVENT WASHOUT. ? CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT. ? CHECK PIPE ELEVATION TO BE SURE IT DID NOT CHANGE ELEVATION DURING THE POUR 01/07/2021=correctiom made it
U-CROSS CONNECTION 01/04/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
ROW FIELD SURVEY /GRADING CERTIFICATION 01/04/2021 APPROVED - AS NOTED GBERTOLA
Note: FOR THE STORM WATER FINAL :SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE FOR THE ROW FINAL REPAIR THE SWALE , AND REMOVE THE POTTY FROM THE SWALE AND PLACE ON THE DRIVEWAY
FINAL SURVEY (OFFICE USE ONLY) 01/04/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 11/23/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 12:00
ROW - FINAL APRON (AFTER POUR) 11/19/2020 Disapproved -FEE REQUIRED KRUTH
Note: BEFORE YOU SCHEDULE A FINAL-APRON (AFTER-POUR) ? CHECK FOR AN EXPANSION JOINT CUT DOWN THE CENTER AND LENGTH OF THE PIPE. ? CHECK FOR DIRT AND SOD. COMPACTED DIRT AND SOD MUST BE PLACED AROUND ALL EDGES OF THE POURED CONCRETE INCLUDING THE DRIVEWAY SHOULDERS TO PREVENT WASHOUT. ? CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT. ? CHECK PIPE ELEVATION TO BE SURE IT DID NOT CHANGE ELEVATION DURING THE POUR
ROW- PRE-APRON (PRE-POUR) 11/04/2020 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. IS NOT HALF WAY UP .YOU HAVE 15 ' IN EACH SID CHECK THAT THERE IS AT LEAST 18 INCHES FROM EACH SIDE OF THE PIPE TO THE FORM BOARD AT THE TOP OF THE DRIVEWAY SHOULDER.YOU HAVE 15 ' IN EACH SIDE REBARD ON SITE IS 18 INCH MINIMUM IS 24 MINIMUM. CHECK THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. ON THE LEFT SIDE 24 INCH DRIVEWAY APRON.MINIMUM IS CHECK THAT THERE IS 36 INCHES OF FLARE ON THE DRIVEWAY APRON. BY THE GARAGE DOOR NEED TO CHIP THE CONCRETE IS ONLY 2 INCH HIGH,NEED 4 INCH PIPE IS GOOD 11/4/2020 corrections made
ROW- PRE-APRON (PRE-POUR) 10/30/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. IS NOT HALF WAY UP .YOU HAVE 15 ' IN EACH SID CHECK THAT THERE IS AT LEAST 18 INCHES FROM EACH SIDE OF THE PIPE TO THE FORM BOARD AT THE TOP OF THE DRIVEWAY SHOULDER.YOU HAVE 15 ' IN EACH SIDE REBARD ON SITE IS 18 INCH MINIMUM IS 24 MINIMUM. CHECK THAT AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. ON THE LEFT SIDE 24 INCH DRIVEWAY APRON.MINIMUM IS CHECK THAT THERE IS 36 INCHES OF FLARE ON THE DRIVEWAY APRON. BY THE GARAGE DOOR NEED TO CHIP THE CONCRETE IS ONLY 2 INCH HIGH,NEED 4 INCH PIPE IS GOOD
U - SEWER TIE IN 10/23/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 10/23/2020 APPROVED JGIBSON
INSULATION 09/29/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION Fire caulk or block at both sides of range hood vent. Fire caulk missed hole above electric panel.
INSULATION 09/28/2020 Disapproved - NO FEE TSTAUFFACHER
Note: Fire caulk or block at both sides of range hood vent. Fire caulk missed hole above electric panel.
PEP TANK INSTALLATION REQUEST 09/24/2020 APPROVED CSTONE
ALL ROUGH 09/22/2020 APPROVED - AS NOTED TSTAUFFACHER
Note: THIS IS A REINSPECTION Studs are notched > 40% by drain pipes at master sink & laundry. Need to add stud near notched studs or add repair plate to existing notched stud. NOTES from 09/22/2020 Thremostat wire is below the truss line in hallway. Not code related, but should be secured. In master area hall, wire is stapled below the truss line, forcing the wire to be caught between the drywall and deadwood. Install back ordered window in shower area. Window is on backorder. Hall bath vent pipe has come loose from fan housing.
LATH/BRICK/ WATER BARRIER 09/22/2020 APPROVED TSTAUFFACHER
ALL ROUGH 09/21/2020 Disapproved -FEE REQUIRED MMESSER
Note: Studs are notched > 40% by drain pipes at master sink & laundry. Need to add stud near notched studs or add repair plate to existing notched stud.
ROOF VALLEY & METAL 08/27/2020 APPROVED MMESSER
LATH/BRICK/ WATER BARRIER 08/18/2020 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/18/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 08/10/2020 APPROVED TBAKER
TIE BEAM / LINTEL 08/05/2020 APPROVED MMESSER
MONOLITHIC SLAB 07/21/2020 APPROVED MMESSER
WATER METER INSTALLATION REQUEST 07/20/2020 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 07/15/2020 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ZON COMPLETE 08/17/2020 08/17/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 08/07/2020 08/10/2020
Note: Released By: TBAKER
ZON COMPLETE 08/07/2020 08/07/2020
Note: Released By: AMOBLEY
ZON COMPLETE 06/23/2020 06/24/2020
Note: Released By: ELENS
MECH COMPLETE 06/23/2020 06/23/2020
Note: Released By: CPISCITELLI
SWALE COMPLETE 06/18/2020 07/10/2020
Note: Released By: TBAKER
BLD COMPLETE 06/17/2020 06/22/2020
Note: Released By: JPI
CUSVC COMPLETE 06/17/2020 06/22/2020
Note: Released By: HHAND
ELEC COMPLETE 06/17/2020 06/18/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/17/2020 06/18/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/17/2020 06/17/2020
Note: Released By: CSTONE
MECH HOLD 06/17/2020 06/19/2020
Note: Held By: CPISCITELLI 1. Energy Calcs and EPL card need to be signed by the builder 2. Duct Drawing needs to be signed by the AC contractor
PLUM COMPLETE 06/17/2020 06/22/2020
Note: Released By: JPI
SW1 COMPLETE 06/17/2020 06/17/2020
Note: Released By: RGROSS
UTL COMPLETE 06/17/2020 06/19/2020
Note: Released By: LFITZGERALD
ZON HOLD 06/17/2020 06/18/2020
Note: Held By: ELENS Please include the "optional" arch on the front elevation, or add another form of articulation: 13.03.03. Facade design. B.Articulation. Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or string courses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least two feet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course, saltwater canal, or other similar highly visible areas.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/12/2021
REINSPECTION FEE ¤40.00 01/12/2021
REINSPECTION FEE ¤40.00 01/12/2021
REINSPECTION FEE ¤40.00 01/12/2021
NEW RESIDENTIAL INSPECTIONS ¤458.00 06/24/2020
SITE PLAN 20 ¤20.00 06/24/2020
SURCHARGE FS 533.721 ¤10.90 06/24/2020
SURCHARGE - FS 468.631 ¤16.35 06/24/2020
STORM WATER PERMIT FEES ¤80.00 06/24/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 06/24/2020
SEWER INSPECTION ¤25.00 06/24/2020
SEWER CAPITAL FACILITY ¤4,596.07 06/24/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 06/24/2020
METER - DEPOSIT ¤60.00 06/24/2020
WATER- TURN ON ¤25.00 06/24/2020
ADMIN FEE ¤20.00 06/24/2020
CONNECTION FEES ¤1,002.88 06/24/2020
ELECTRIC FEE ¤197.40 06/24/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/24/2020
IMPACT FEE FIRE ¤223.38 06/24/2020
IMPACT FEE PARKS ¤849.24 06/24/2020
IMPACT FEE SCHOOL ¤3,600.00 06/24/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 06/24/2020
MECHANICAL FEE ¤197.40 06/24/2020
WATER -IRRIGATION INSPECTION ¤25.00 06/24/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/24/2020
PLAN CHECK FEE ¤91.60 06/24/2020
PLUMBING FEE ¤197.40 06/24/2020
Fees Total Due: ¤0.00 Total Paid: ¤16,821.40