I want to search for...

Permit #2020060847

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00170-0290
CONDITIONED SPACE: 1921 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
GARAGE: 701 sqft
Total Square Footage: 2846 sqft
Block: 00170
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: (386)437-1508
Location Address: 10 POPE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/25/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: YOUNG JOE

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0290
Contracted Stated Job Value: ¤190,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/11/2021 FINAL APPROVED MMESSER
ROW - FINAL APRON (AFTER POUR) 01/11/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE RUTS IN THE NEIGHBORS SWALE FROM A CONSTRUCTION TRUCK MUST BE REPAIRED. FOR THE ROW FINAL REPAIR THE SWALE , AND REMOVE THE POTTY FROM THE SWALE AND PLACE ON THE DRIVEWAY RIGTH SIDE BERM NEED TO BE BUILD UP TO PREVENT WATER GO INTO THE NEIGHBOUR PROPERTY The subject lots drainage must not negatively impact any adjacent property. (B) Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) 01/08/2021=CORRECTION MADE
ROW - STORMWATER FINAL 01/11/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION 12/30/2020=THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END DIRT AND SOD. COMPACTED DIRT AND SOD MUST BE PLACED AROUND ALL EDGES EXPANSION JOINT CUT DOWN THE CENTER AND LENGTH OF THE PIPE. WE NEED TO APROVE THE PRE POUR FINAL SURVEY FIELD SURVEY AFTER POUR ROW FINAL 01/08/2021=CORRECTIOM MADE
U -UTILITY RESIDENTIAL FINAL 01/11/2021 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 01/08/2021 APPROVED - AS NOTED GBERTOLA
Note: correction made
FINAL SURVEY (OFFICE USE ONLY) 01/08/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 12/30/2020 Disapproved - NO FEE GBERTOLA
Note: 12/30/2020=THE DRIVEWAY PIPE NEEDS TO HAVE THE CONCRETE OVERPOUR REMOVED SO THAT WHEN WE REGRADE THE SWALE THE GRADALL DOES NOT HIT THE OVERPOUR AND POTENTIALLY BREAK THE MITERED END DIRT AND SOD. COMPACTED DIRT AND SOD MUST BE PLACED AROUND ALL EDGES EXPANSION JOINT CUT DOWN THE CENTER AND LENGTH OF THE PIPE. WE NEED TO APROVE THE PRE POUR FINAL SURVEY FIELD SURVEY AFTER POUR ROW FINAL
U-CROSS CONNECTION 12/30/2020 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
ROW - FINAL APRON (AFTER POUR) 12/30/2020 Disapproved - NO FEE GBERTOLA
Note: SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE RUTS IN THE NEIGHBORS SWALE FROM A CONSTRUCTION TRUCK MUST BE REPAIRED. FOR THE ROW FINAL REPAIR THE SWALE , AND REMOVE THE POTTY FROM THE SWALE AND PLACE ON THE DRIVEWAY RIGTH SIDE BERM NEED TO BE BUILD UP TO PREVENT WATER GO INTO THE NEIGHBOUR PROPERTY The subject lots drainage must not negatively impact any adjacent property. (B) Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW- PRE-APRON (PRE-POUR) 12/23/2020 Disapproved -FEE REQUIRED KRUTH
Note: the miter end form does not meet the city specs needs the lower form board at both mitered ends to prevent concrete overpour going into the swale pipe needs compacted material half way up the sides of the pipe pipe looks like it is twisted mitered ends are not straight
ROW- PRE-APRON (PRE-POUR) 12/23/2020 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION the miter end form does not meet the city specs needs the lower form board at both mitered ends to prevent concrete overpour going into the swale pipe needs compacted material half way up the sides of the pipe pipe looks like it is twisted mitered ends are not straight 12/23/2020 all corrections made
U - SEWER TIE IN 12/17/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 12/17/2020 APPROVED JGIBSON
ELECTRIC - EARLY POWER 12/15/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:40
PEP TANK INSTALLATION REQUEST 11/13/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 11/10/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION not ready for inspection
INSULATION 10/26/2020 APPROVED MMESSER
ALL ROUGH 10/20/2020 APPROVED MMESSER
LATH/BRICK/ WATER BARRIER 10/15/2020 Disapproved - NO FEE MMESSER
Note: THIS IS A REINSPECTION not ready for inspection
ROOF VALLEY & METAL 10/09/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/05/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 09/14/2020 APPROVED TBAKER
TIE BEAM / LINTEL 09/01/2020 APPROVED MMESSER
MONOLITHIC SLAB 08/14/2020 APPROVED MMESSER
LATH/BRICK/ WATER BARRIER 08/14/2020 CANCELLED BY APPLICANT MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 08/12/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/03/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 09/22/2020 09/22/2020
Note: Released By: TDOAK
BADMIN COMPLETE 09/22/2020 09/22/2020
Note: Released By: LMUSGROVE
ZON HOLD 09/21/2020 09/21/2020
Note: Held By: TDOAK Revised color sheet submitted is blank. The form is there but nothing is filled in.
BADMIN HOLD 09/21/2020 09/21/2020
Note: Held By: LMUSGROVE Document names and File names must match, No numbers or extra names Ex – site plan=site plan.
ZON COMPLETE 09/11/2020 09/11/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 09/11/2020 09/14/2020
Note: Released By: TBAKER
MECH COMPLETE 06/24/2020 06/24/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 06/23/2020 06/23/2020
Note: Released By: AMOBLEY
MECH HOLD 06/23/2020 06/23/2020
Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder. (Second Request)
SWALE COMPLETE 06/18/2020 07/13/2020
Note: Released By: TBAKER
BLD COMPLETE 06/17/2020 06/22/2020
Note: Released By: JPI
CUSVC COMPLETE 06/17/2020 06/22/2020
Note: Released By: HHAND
ELEC COMPLETE 06/17/2020 06/18/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/17/2020 06/18/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/17/2020 06/17/2020
Note: Released By: CSTONE
MECH HOLD 06/17/2020 06/19/2020
Note: Held By: CPISCITELLI 1. Energy Calcs and EPL card need to be signed by the builder 2. Duct Drawing needs to be signed by the AC contractor
PLUM COMPLETE 06/17/2020 06/22/2020
Note: Released By: JPI
SW1 COMPLETE 06/17/2020 06/17/2020
Note: Released By: RGROSS
UTL COMPLETE 06/17/2020 06/19/2020
Note: Released By: LFITZGERALD
ZON HOLD 06/17/2020 06/18/2020
Note: Held By: AMOBLEY Please provide color of garage door being installed on color sheet Landscape plan must list the sod type Must have a total of 16 foundation plantings. At least 8 along the front and 4 along each side wrapping both corners. Right side is missing foundation plantings

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/12/2021
NEW RESIDENTIAL INSPECTIONS ¤502.00 06/25/2020
SITE PLAN 20 ¤20.00 06/25/2020
SURCHARGE FS 533.721 ¤11.74 06/25/2020
SURCHARGE - FS 468.631 ¤17.61 06/25/2020
STORM WATER PERMIT FEES ¤80.00 06/25/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 06/25/2020
SEWER CREDIT (¤650.00) 06/25/2020
SEWER INSPECTION ¤25.00 06/25/2020
SEWER CAPITAL FACILITY ¤4,596.07 06/25/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 06/25/2020
METER - DEPOSIT ¤60.00 06/25/2020
WATER- TURN ON ¤25.00 06/25/2020
ADMIN FEE ¤20.00 06/25/2020
CONNECTION FEES ¤1,002.88 06/25/2020
ELECTRIC FEE ¤210.60 06/25/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/25/2020
IMPACT FEE FIRE ¤223.38 06/25/2020
IMPACT FEE PARKS ¤849.24 06/25/2020
IMPACT FEE SCHOOL ¤3,600.00 06/25/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 06/25/2020
MECHANICAL FEE ¤210.60 06/25/2020
WATER -IRRIGATION INSPECTION ¤25.00 06/25/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/25/2020
PLAN CHECK FEE ¤100.40 06/25/2020
PLUMBING FEE ¤210.60 06/25/2020
Fees Total Due: ¤0.00 Total Paid: ¤16,145.90