I want to search for...
Permit #2020060941
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00100-0020 |
| CONDITIONED SPACE: 1527 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 1991 sqft |
| Block: 00100 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: (386)437-1508 |
| Location Address: 83 PONY EXPRESS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/25/2020 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: YOUNG JOE |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMIY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/10/2021 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 02/09/2021 | FINAL APPROVED | MMESSER |
| ROW - STORMWATER FINAL | 02/08/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE IN TE BACK YARD BY THE DITCH LINE ALL BARE SPOTS MUST BE SEEDED AND COVERED W/STRAW AND/OR PINE 02/08/2021=CORRECTION MADE | |||
| ROW - STORMWATER FINAL | 02/04/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD. ALL RUTTS AND BARE SPOTS MUST BE FILLED AND SODDED, NOT SEEDED OR COVERED W/STRAW AND/OR PINE NEEDLE IN TE BACK YARD BY THE DITCH LINE ALL BARE SPOTS MUST BE SEEDED AND COVERED W/STRAW AND/OR PINE | |||
| U-CROSS CONNECTION | 02/04/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation | |||
| ROW - FINAL APRON (AFTER POUR) | 02/04/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: CULVERT PIPE IS GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/02/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 02/02/2021 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 01/04/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:21 am | |||
| ROW- PRE-APRON (PRE-POUR) | 12/16/2020 | APPROVED - AS NOTED | KRUTH |
| Note: NEED TO ADD A BOARD AT THE BOTTOM OF THE FORM AT BOTH MITER ENDS TO PREVENT OVERPOUR INTO THE SWALE It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 12/03/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/03/2020 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 10/20/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 10/16/2020 | APPROVED | MMESSER |
| INSULATION | 10/15/2020 | APPROVED | MMESSER |
| ALL ROUGH | 10/12/2020 | APPROVED - AS NOTED | MMESSER |
| Note: Fire block both sides of range hood vent. | |||
| ROOF VALLEY & METAL | 09/28/2020 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/21/2020 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/18/2020 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 09/14/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/08/2020 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 08/19/2020 | APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION Footers to be 12" below undisturbed ground or in compacted soil. Slab had a lot of washout due to rain. | |||
| MONOLITHIC SLAB | 08/17/2020 | Disapproved - NO FEE | MMESSER |
| Note: Footers to be 12" below undisturbed ground or in compacted soil. Slab had a lot of washout due to rain. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/13/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/30/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/11/2020 | 09/11/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 09/11/2020 | 09/14/2020 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 06/24/2020 | 06/24/2020 |
| Note: Released By: CPISCITELLI | |||
| MECH | HOLD | 06/23/2020 | 06/23/2020 |
| Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder (Second Request) | |||
| ZON | COMPLETE | 06/23/2020 | 06/23/2020 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 06/19/2020 | 07/13/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 06/18/2020 | 06/22/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/18/2020 | 06/22/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 06/18/2020 | 06/19/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 06/18/2020 | 06/19/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 06/18/2020 | 06/22/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 06/18/2020 | 06/19/2020 |
| Note: Held By: CPISCITELLI 1. Energy Calcs and EPL card need to be signed by the builder. 2. Duct Drawing is flipped from house floor plan and needs to be signed by the AC contractor. | |||
| PLUM | COMPLETE | 06/18/2020 | 06/22/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 06/18/2020 | 06/19/2020 |
| Note: Released By: RGROSS | |||
| UTL | COMPLETE | 06/18/2020 | 06/23/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 06/18/2020 | 06/19/2020 |
| Note: Held By: AMOBLEY Please specify the specific type of magnolias you are using on landscape plan One additional shrub needed on right side. Should have a total of four along each side. Screening for the ac does not count |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 06/25/2020 |
| WATER- TURN ON | ¤25.00 | 06/25/2020 |
| ADMIN FEE | ¤20.00 | 06/25/2020 |
| CONNECTION FEES | ¤1,002.88 | 06/25/2020 |
| ELECTRIC FEE | ¤172.80 | 06/25/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/25/2020 |
| IMPACT FEE FIRE | ¤223.38 | 06/25/2020 |
| IMPACT FEE PARKS | ¤849.24 | 06/25/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/25/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 06/25/2020 |
| MECHANICAL FEE | ¤172.80 | 06/25/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/25/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/25/2020 |
| PLAN CHECK FEE | ¤75.20 | 06/25/2020 |
| PLUMBING FEE | ¤172.80 | 06/25/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤376.00 | 06/25/2020 |
| SITE PLAN 20 | ¤20.00 | 06/25/2020 |
| SURCHARGE FS 533.721 | ¤9.34 | 06/25/2020 |
| SURCHARGE - FS 468.631 | ¤14.02 | 06/25/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/25/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 06/25/2020 |
| SEWER CREDIT | (¤2,465.75) | 06/25/2020 |
| SEWER INSPECTION | ¤25.00 | 06/25/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 06/25/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 06/25/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,019.56 |