Permit #2020060991

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00630-0010
CONDITIONED SPACE: 1527 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
Total Square Footage: 1991 sqft
Block: 00630
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: (386)437-1508
Location Address: 29 RYARBOR DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/25/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: YOUNG JOE

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0010
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/09/2021 FINAL APPROVED MMESSER
U -UTILITY RESIDENTIAL FINAL 02/08/2021 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION no power into pep panel
U -UTILITY RESIDENTIAL FINAL 02/04/2021 Disapproved - NO FEE LFITZGERALD
Note: no power into pep panel
ROW - FINAL APRON (AFTER POUR) 02/02/2021 APPROVED - AS NOTED GBERTOLA
Note: 02/02/2021= CULVERT PIPE IS GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 02/02/2021 APPROVED GBERTOLA
ROW - DRAINAGE 02/02/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION 12/8/2020 a silt fence needs to be installed When necessary, an Erosion Control Inspection will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other stormwater conveyance. A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, or at the discretion of the Stormwater Inspector. The Builder will be notified if additional Erosion Control Measures are required at the time the permit is issued. Lot clearing cannot begin prior to the permit being issued. 12/11/2020 reinspection datE CORRECTION MADE
ROW - STORMWATER FINAL 02/02/2021 APPROVED GBERTOLA
FINAL SURVEY (OFFICE USE ONLY) 02/02/2021 APPROVED GBERTOLA
U-CROSS CONNECTION 01/04/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
ELECTRIC - EARLY POWER 12/29/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:11 am
ROW - DRAINAGE 12/08/2020 Disapproved - NO FEE KRUTH
Note: 12/8/2020 a silt fence needs to be installed When necessary, an Erosion Control Inspection will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other stormwater conveyance. A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, or at the discretion of the Stormwater Inspector. The Builder will be notified if additional Erosion Control Measures are required at the time the permit is issued. Lot clearing cannot begin prior to the permit being issued. 12/11/2020 reinspection date
ROW- PRE-APRON (PRE-POUR) 11/25/2020 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION TOO MUCH WATER IN THE POUR AREA AND IN THE PIPE. BUTTER SOFT MUD ALL ALONG THE PIPE'S OUTSIDE EDGE MATERIAL IS NOT COMPACTED= MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. I DIDN'T CHECK THE ELEVATION TOO MUCH WATER INSIDE 11/25/2020=CORRECTION MADE IT PLEASE IF A RAIN BEFORE POUR CONCRETE, CHECK THE PIPE ELEVATION AGAIN,
ROW- PRE-APRON (PRE-POUR) 11/23/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: TOO MUCH WATER IN THE POUR AREA AND IN THE PIPE. BUTTER SOFT MUD ALL ALONG THE PIPE'S OUTSIDE EDGE MATERIAL IS NOT COMPACTED= MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. I DIDN'T CHECK THE ELEVATION TOO MUCH WATER INSIDE FOOTERS HAVE WASHED IN NEED TO BE DUG OUT.
U - SEWER TIE IN 11/09/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 11/09/2020 APPROVED JGIBSON
INSULATION 10/12/2020 APPROVED MMESSER
PEP TANK INSTALLATION REQUEST 10/08/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 10/07/2020 APPROVED MMESSER
ALL ROUGH 10/06/2020 APPROVED - AS NOTED MMESSER
Note: Fire block needed on sides of range hood vent.
ALL ROUGH 10/05/2020 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 09/28/2020 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/21/2020 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 09/17/2020 APPROVED AMOBLEY
TIE BEAM / LINTEL 09/04/2020 APPROVED MMESSER
MONOLITHIC SLAB 08/14/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 08/10/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/28/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 09/16/2020 09/17/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 09/16/2020 09/17/2020
Note: Released By: TBAKER
MECH COMPLETE 06/24/2020 06/24/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 06/24/2020 06/24/2020
Note: Released By: ELENS
SWALE COMPLETE 06/22/2020 07/14/2020
Note: Released By: TBAKER
ZON COMPLETE 06/22/2020 06/22/2020
Note: Released By: ELENS
BLD COMPLETE 06/19/2020 06/22/2020
Note: Released By: JPI
CUSVC COMPLETE 06/19/2020 06/23/2020
Note: Released By: HHAND
ELEC COMPLETE 06/19/2020 06/22/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/19/2020 06/22/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/19/2020 06/22/2020
Note: Released By: CSTONE
MECH HOLD 06/19/2020 06/22/2020
Note: Held By: CPISCITELLI 1. Energy Calcs and EPL Card need to be signed by the builder 2. Duct Drawing needs to have company name and signature. (signature is not legible on current drawing)
PLUM COMPLETE 06/19/2020 06/22/2020
Note: Released By: JPI
SW1 COMPLETE 06/19/2020 06/22/2020
Note: Released By: RGROSS
UTL COMPLETE 06/19/2020 06/23/2020
Note: Released By: AHALL

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/09/2021
NEW RESIDENTIAL INSPECTIONS ¤376.00 06/25/2020
SITE PLAN 20 ¤20.00 06/25/2020
SURCHARGE FS 533.721 ¤9.34 06/25/2020
SURCHARGE - FS 468.631 ¤14.02 06/25/2020
STORM WATER PERMIT FEES ¤80.00 06/25/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 06/25/2020
SEWER INSPECTION ¤25.00 06/25/2020
SEWER CAPITAL FACILITY ¤4,596.07 06/25/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 06/25/2020
METER - DEPOSIT ¤60.00 06/25/2020
WATER- TURN ON ¤25.00 06/25/2020
ADMIN FEE ¤20.00 06/25/2020
CONNECTION FEES ¤1,002.88 06/25/2020
ELECTRIC FEE ¤172.80 06/25/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/25/2020
IMPACT FEE FIRE ¤223.38 06/25/2020
IMPACT FEE PARKS ¤849.24 06/25/2020
IMPACT FEE SCHOOL ¤3,600.00 06/25/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 06/25/2020
MECHANICAL FEE ¤172.80 06/25/2020
WATER -IRRIGATION INSPECTION ¤25.00 06/25/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/25/2020
PLAN CHECK FEE ¤75.20 06/25/2020
PLUMBING FEE ¤172.80 06/25/2020
Fees Total Due: ¤0.00 Total Paid: ¤16,525.31