Permit #2020061157

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00700-0010
CONDITIONED SPACE: 1817 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
GARAGE: 433 sqft
Total Square Footage: 2474 sqft
Block: 00700
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: (386)437-1508
Location Address: 20 RYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/30/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: YOUNG JOE

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0010
Contracted Stated Job Value: ¤180,000.00
Job Description: Residential Home
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/23/2021 FINAL APPROVED MMESSER
ROW - DRAINAGE 02/23/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION PER ROBERT GROSS WHO RECIEVED A CALL 12/3 ABOUT THE THIS CONSTRUCTION SITE. BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE AND INSTALL A SILT FENCE ALONG THE DITCH SIDE OF THE HOUSE. NOTE TO INSPECTOR: FAIL THIS INSPECTION WITH NO FEE AND GIVE THEM 3 TO 5 DAYS TO MAKE THE CORRECTIONS. CONTACT SUPER AND GIVE THEM A VERBAL INSTRUCTION ON WHAT NEEDS DONE. 12/04/2020=NO SILT FENCE ALONG THE DITCH LINE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED 12/8/2020 NO SILT FENCE ALONG THE DITCH LINE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED 02/23/2021= CULVERT PIPE IS IN THE GROUND
U -UTILITY RESIDENTIAL FINAL 02/12/2021 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 02/12/2021 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 02/11/2021 APPROVED KRUTH
U-CROSS CONNECTION 02/11/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
ROW - FINAL APRON (AFTER POUR) 02/11/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 02/10/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 02/10/2021 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 01/22/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THE PIPE IS AT GOOD ELEVATIONS BUT THE CONCRETE NEEDS TO BE CHIPPED TO GET THE 4 INCH MINIMUM AT THE FRONT DOOR AND THE GARAGE 01/22/2021=READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 01/21/2021 Disapproved -FEE REQUIRED KRUTH
Note: THE PIPE IS AT GOOD ELEVATIONS BUT THE CONCRETE NEEDS TO BE CHIPPED TO GET THE 4 INCH MINIMUM AT THE FRONT DOOR AND THE GARAGE
ELECTRIC - EARLY POWER 01/13/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:26 am
GRAVITY SEWER TEST 01/12/2021 APPROVED JGIBSON
U - SEWER TIE IN 01/12/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 01/08/2021 CANCELLED BY APPLICANT WEB
ROW - DRAINAGE 12/08/2020 Disapproved -FEE REQUIRED KRUTH
Note: THIS IS A REINSPECTION PER ROBERT GROSS WHO RECIEVED A CALL 12/3 ABOUT THE THIS CONSTRUCTION SITE. BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE AND INSTALL A SILT FENCE ALONG THE DITCH SIDE OF THE HOUSE. NOTE TO INSPECTOR: FAIL THIS INSPECTION WITH NO FEE AND GIVE THEM 3 TO 5 DAYS TO MAKE THE CORRECTIONS. CONTACT SUPER AND GIVE THEM A VERBAL INSTRUCTION ON WHAT NEEDS DONE. 12/04/2020=NO SILT FENCE ALONG THE DITCH LINE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED 12/8/2020 NO SILT FENCE ALONG THE DITCH LINE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED
PEP TANK INSTALLATION REQUEST 12/07/2020 APPROVED - AS NOTED CSTONE
Note: Dumpster will need to move email ESerrano@palmcoastgov.com when this is done
ROW - DRAINAGE 12/04/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: PER ROBERT GROSS WHO RECIEVED A CALL 12/3 ABOUT THE THIS CONSTRUCTION SITE. BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE AND INSTALL A SILT FENCE ALONG THE DITCH SIDE OF THE HOUSE. NOTE TO INSPECTOR: FAIL THIS INSPECTION WITH NO FEE AND GIVE THEM 3 TO 5 DAYS TO MAKE THE CORRECTIONS. CONTACT SUPER AND GIVE THEM A VERBAL INSTRUCTION ON WHAT NEEDS DONE. 12/04/2020=NO SILT FENCE ALONG THE DITCH LINE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED
LATH/BRICK/ WATER BARRIER 11/10/2020 APPROVED MMESSER
INSULATION 11/05/2020 APPROVED MMESSER
ALL ROUGH 10/30/2020 APPROVED - AS NOTED MMESSER
Note: Blocking needed at range hood vent.
ROOF VALLEY & METAL 10/20/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/12/2020 APPROVED MMESSER
TIE BEAM / LINTEL 09/24/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 09/17/2020 APPROVED AMOBLEY
MONOLITHIC SLAB 08/14/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 08/10/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/28/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 09/16/2020 09/17/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 09/16/2020 09/17/2020
Note: Released By: TBAKER
MECH COMPLETE 06/29/2020 06/29/2020
Note: Released By: CPISCITELLI
SWALE COMPLETE 06/24/2020 07/14/2020
Note: Released By: TBAKER
BLD COMPLETE 06/23/2020 06/25/2020
Note: Released By: JPI
CUSVC COMPLETE 06/23/2020 06/24/2020
Note: Released By: HHAND
ELEC COMPLETE 06/23/2020 06/24/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/23/2020 06/24/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/23/2020 06/26/2020
Note: Released By: CSTONE
MECH HOLD 06/23/2020 06/24/2020
Note: Held By: CPISCITELLI 1. Energy Calc needs to be signed by the builder 2. Duct drawing need to be signed with AC contractor name
PLUM COMPLETE 06/23/2020 06/25/2020
Note: Released By: JPI
SW1 COMPLETE 06/23/2020 06/25/2020
Note: Released By: CTROHA
UTL COMPLETE 06/23/2020 06/29/2020
Note: Released By: AHALL
ZON COMPLETE 06/23/2020 06/24/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/23/2021
STORMWATER REINSPECTION FEE ¤40.00 02/23/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 06/30/2020
SEWER INSPECTION ¤25.00 06/30/2020
SEWER CAPITAL FACILITY ¤4,596.07 06/30/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 06/30/2020
NEW RESIDENTIAL INSPECTIONS ¤458.00 06/30/2020
SITE PLAN 20 ¤20.00 06/30/2020
SURCHARGE FS 533.721 ¤10.90 06/30/2020
SURCHARGE - FS 468.631 ¤16.35 06/30/2020
STORM WATER PERMIT FEES ¤80.00 06/30/2020
METER - DEPOSIT ¤60.00 06/30/2020
WATER- TURN ON ¤25.00 06/30/2020
ADMIN FEE ¤20.00 06/30/2020
CONNECTION FEES ¤1,002.88 06/30/2020
ELECTRIC FEE ¤197.40 06/30/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/30/2020
IMPACT FEE FIRE ¤223.38 06/30/2020
IMPACT FEE PARKS ¤849.24 06/30/2020
IMPACT FEE SCHOOL ¤3,600.00 06/30/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 06/30/2020
MECHANICAL FEE ¤197.40 06/30/2020
WATER -IRRIGATION INSPECTION ¤25.00 06/30/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/30/2020
PLAN CHECK FEE ¤91.60 06/30/2020
PLUMBING FEE ¤197.40 06/30/2020
Fees Total Due: ¤0.00 Total Paid: ¤16,741.40