I want to search for...

Permit #2020061214

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00690-0040
CONDITIONED SPACE: 2286 sqft
GARAGE: 588 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
OPENED PORCH (WITH ROOF) : 307 sqft
Total Square Footage: 3235 sqft
Block: 00690
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 904-268-7730
Location Address: 3 SETON CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/07/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD RD STE 202

JACKSONVILLE, FL 32257

Lot: 0040
Contracted Stated Job Value: ¤130,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
GARI STINE
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

7225 JACKSONVILLE CT

WINTER PARK, FL 32792

SUITE 1

JACKSONVILE, FL 32256

CAC1818134 (Exp: 08/31/2020) 407-629-6920 407-629-9307
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/03/2020 FINAL APPROVED WMILLER
U -UTILITY RESIDENTIAL FINAL 12/03/2020 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 12/02/2020 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 12/02/2020 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 11/23/2020 APPROVED - AS NOTED GBERTOLA
Note: FOR THE ROW FINAL REMOVE THE PORTA POTTY AND PLACE ON THE DRIVEWAY,SWALE DAMAGE NEED TO BE COMPLETELY REPAIR AND RE-SOD, REMOVE THE 2X4 ON THE LEFT SIDE EMPTY LOT FOR THE AFTER POUR PLEASE CLEAN THE PIPE, REMOVE THE SAND
FINAL SURVEY (OFFICE USE ONLY) 11/23/2020 APPROVED GBERTOLA
U-CROSS CONNECTION 11/17/2020 APPROVED - AS NOTED JHARDING
Note: Approved. No cross connections.
ELECTRIC - EARLY POWER 11/03/2020 APPROVED JBODEN
U - SEWER TIE IN 10/15/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 10/15/2020 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 10/14/2020 CANCELLED BY APPLICANT KHOWELL
Note: HOLLY CALLED AND CANCELLED
INSULATION 09/23/2020 APPROVED - AS NOTED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 09/21/2020 APPROVED FWILLIS
ALL ROUGH 09/18/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION ELECTRIC PANEL AND WIRING STILL INSTALLING AT THE TIME OF MY VISIT. 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes. NAIL PLATES MISSING. INSPECTION STOPPED 9/18/20 Items have been addressed and corrected.
ALL ROUGH 09/17/2020 Disapproved -FEE REQUIRED FWILLIS
Note: ELECTRIC PANEL AND WIRING STILL INSTALLING AT THE TIME OF MY VISIT. 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes. NAIL PLATES MISSING. INSPECTION STOPPED
ROOF VALLEY & METAL 09/16/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/15/2020 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 09/14/2020 APPROVED TBAKER
TIE BEAM / LINTEL 08/24/2020 APPROVED FWILLIS
MONOLITHIC SLAB 08/14/2020 APPROVED - AS NOTED FWILLIS
Note: Need Proof of Compaction for NEXT Inspection.
MONOLITHIC SLAB 08/11/2020 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 08/10/2020 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 08/07/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 08/07/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/23/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON HOLD 09/09/2020 09/09/2020
Note: Held By: AMOBLEY foundation survey for a different address
ENGIN1 COMPLETE 09/09/2020 09/14/2020
Note: Released By: TBAKER
ZON COMPLETE 09/09/2020 09/10/2020
Note: Released By: AMOBLEY
SWALE COMPLETE 06/26/2020 07/15/2020
Note: Released By: TBAKER
BLD COMPLETE 06/24/2020 06/25/2020
Note: Released By: JPI
CUSVC COMPLETE 06/24/2020 06/30/2020
Note: Released By: AROSCOE
ELEC COMPLETE 06/24/2020 06/25/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 06/24/2020 06/26/2020
Note: Released By: TBAKER
LOCATE COMPLETE 06/24/2020 06/26/2020
Note: Released By: CSTONE
MECH COMPLETE 06/24/2020 06/25/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 06/24/2020 06/25/2020
Note: Released By: JPI
SW1 COMPLETE 06/24/2020 06/29/2020
Note: Released By: RGROSS
UTL COMPLETE 06/24/2020 06/29/2020
Note: Released By: AHALL
ZON COMPLETE 06/24/2020 06/25/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/08/2020
NEW RESIDENTIAL INSPECTIONS ¤586.00 07/07/2020
SITE PLAN 20 ¤20.00 07/07/2020
SURCHARGE FS 533.721 ¤13.33 07/07/2020
SURCHARGE - FS 468.631 ¤20.00 07/07/2020
STORM WATER PERMIT FEES ¤80.00 07/07/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 07/07/2020
SEWER CREDIT (¤6,876.70) 07/07/2020
SEWER INSPECTION ¤25.00 07/07/2020
SEWER CAPITAL FACILITY ¤4,596.07 07/07/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 07/07/2020
07/07/2020
METER - DEPOSIT ¤60.00 07/07/2020
WATER- TURN ON ¤25.00 07/07/2020
ADMIN FEE ¤20.00 07/07/2020
CONNECTION FEES ¤1,002.88 07/07/2020
ELECTRIC FEE ¤235.80 07/07/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/07/2020
IMPACT FEE FIRE ¤223.38 07/07/2020
IMPACT FEE PARKS ¤849.24 07/07/2020
IMPACT FEE SCHOOL ¤3,600.00 07/07/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 07/07/2020
MECHANICAL FEE ¤235.80 07/07/2020
WATER -IRRIGATION INSPECTION ¤25.00 07/07/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/07/2020
PLAN CHECK FEE ¤117.20 07/07/2020
PLUMBING FEE ¤235.80 07/07/2020
Fees Total Due: ¤0.00 Total Paid: ¤10,099.58