I want to search for...
Permit #2020070038
Permit Details
Status: COED
| Parcel Id: 21-10-30-5410-00000-2290 |
| CONDITIONED SPACE: 1006 sqft |
| CONDITIONED SPACE: 1213 sqft |
| GARAGE: 367 sqft |
| OPENED PORCH (WITH ROOF) : 200 sqft |
| OPENED PORCH (WITH ROOF) : 46 sqft |
| Total Square Footage: 2832 sqft |
| Subdivision: 2135 - SAWMILL CREEK SUBDIVISION |
| Job Phone: 904-268-7730 |
| Location Address: 36 RIDGE RD |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/29/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: PALM COAST FLORIDA HOLDINGS LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 229 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/08/2020 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 12/08/2020 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 12/07/2020 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 12/04/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 12/04/2020 | APPROVED | RGROSS |
| Note: ON SITE WITH SUPER ABOUT ROW MEASURMENTS FROM EOP TO BACK OF CURB THROUGHOUT THE SUB-DIVISION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/30/2020 | APPROVED - AS NOTED | RGROSS |
| Note: Note that before the final stormwater sand in gutter needs removed. seed and straw needs placed five feet out from finished property sod lines and any bare earth in the rear will need sod for stabilization of the pond bank. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/30/2020 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 11/06/2020 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No Cross connection | |||
| ELECTRIC - EARLY POWER | 11/05/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:40 | |||
| ROW- PRE-APRON (PRE-POUR) | 10/22/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION * APRON FULL OF WATER. * LEFT FRON CORNER OF FRONT ENTRANCE NEED MORE FOUNDATION OVERPOUR REMOVED TO AVOID FUTURE CHIPPING. 10/22/20 - ON SITE WITH SUB WHO IS PUMPING THE LAST BIT OF WATER OUR. AFTER THAT...READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 10/20/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: * APRON FULL OF WATER. * LEFT FRON CORNER OF FRONT ENTRANCE NEED MORE FOUNDATION OVERPOUR REMOVED TO AVOID FUTURE CHIPPING. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2020 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 10/14/2020 | APPROVED | JGIBSON |
| INSULATION | 10/02/2020 | APPROVED - AS NOTED | JBODEN |
| Note: second floor window needs to be installed and spray foam applied. Left out for drywall stocking | |||
| LATH/BRICK/ WATER BARRIER | 09/30/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION per test | |||
| LATH/BRICK/ WATER BARRIER | 09/29/2020 | CANCELLED BY APPLICANT | JCOLASANTI |
| Note: per test | |||
| ALL ROUGH | 09/28/2020 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 09/23/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/21/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 09/18/2020 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 09/08/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 08/31/2020 | APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Not ready, Steel not placed. etc. | |||
| MONOLITHIC SLAB | 08/28/2020 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION Not ready, Steel not placed. etc. | |||
| MONOLITHIC SLAB | 08/27/2020 | CANCELLED BY APPLICANT | MMESSER |
| GRAVITY SEWER TEST | 08/13/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION NOT RAN NO PLUMBING | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/13/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION NOT READY | |||
| GRAVITY SEWER TEST | 08/12/2020 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/12/2020 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/11/2020 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NOT READY | |||
| GRAVITY SEWER TEST | 08/11/2020 | Disapproved - NO FEE | JGIBSON |
| Note: NOT RAN NO PLUMBING | |||
| WATER METER INSTALLATION REQUEST | 07/31/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/04/2020 | 12/04/2020 |
| Note: Released By: GBERTOLA | |||
| ZON | COMPLETE | 12/03/2020 | 12/03/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 12/03/2020 | 12/04/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 10/15/2020 | 10/15/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 09/18/2020 | 09/18/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 09/18/2020 | 09/18/2020 |
| Note: Released By: TDOAK | |||
| ZON | COMPLETE | 07/21/2020 | 07/21/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 07/21/2020 | 07/27/2020 |
| Note: Released By: JPI | |||
| UD1 | COMPLETE | 07/21/2020 | 07/23/2020 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 07/21/2020 | 07/22/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 07/21/2020 | 07/21/2020 |
| Note: Released By: CTROHA Stormwater not requested on Permit Correction/Revision Form | |||
| ZON | HOLD | 07/10/2020 | 07/10/2020 |
| Note: Held By: AMOBLEY Landscape plan must specify height,material and color of fence for AC screening Site plan/survey has ac pad in a different location than the plans and landscape plan. They must all match | |||
| BADMIN | HOLD | 07/10/2020 | 07/10/2020 |
| Note: Held By: STHOMAS 7-10-20 1. REMOVE '36 RIDGE' FROM ALL FILE NAMES 2. RENAME TO SITE PLAN.PDF, LANDSCAPE.PDF,... | |||
| BADMIN | COMPLETE | 07/10/2020 | 07/10/2020 |
| Note: Released By: STHOMAS | |||
| BLD | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/01/2020 | 07/07/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/01/2020 | 07/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/01/2020 | 07/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 07/01/2020 | 07/10/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 07/01/2020 | 07/02/2020 |
| Note: Held By: AMOBLEY In subdivisions which typically have 5’ side setbacks, we are requiring fencing as screening around the mechanical equipment, one panel in the front and one on the side (City approved fence material and height) in lieu of the 7 gallon shrubs due to potential drainage issues. Survey must show all platted easements Survey states one story but plans are for a two story. Please correct survey | |||
| URB | COMPLETE | 07/01/2020 | 07/08/2020 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/09/2020 |
| REINSPECTION FEE | ¤40.00 | 12/09/2020 |
| REINSPECTION FEE | ¤40.00 | 12/09/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤542.00 | 07/29/2020 |
| SITE PLAN 20 | ¤20.00 | 07/29/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/29/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/29/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/29/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 07/29/2020 |
| SEWER INSPECTION | ¤25.00 | 07/29/2020 |
| SEWER CAPITAL FACILITY | ¤2,389.36 | 07/29/2020 |
| WATER CAPITAL FACILITY FEE | ¤2,234.43 | 07/29/2020 |
| METER - DEPOSIT | ¤60.00 | 07/29/2020 |
| WATER-METER | ¤434.59 | 07/29/2020 |
| WATER-METER | ¤361.04 | 07/29/2020 |
| ADMIN FEE | ¤20.00 | 07/29/2020 |
| CONNECTION FEES | ¤25.00 | 07/29/2020 |
| BUILDING DISCOUNT 100% | (¤1,338.20) | 07/29/2020 |
| ELECTRIC FEE | ¤222.60 | 07/29/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/29/2020 |
| IMPACT FEE FIRE | ¤223.38 | 07/29/2020 |
| IMPACT FEE PARKS | ¤849.24 | 07/29/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 07/29/2020 |
| MECHANICAL FEE | ¤222.60 | 07/29/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/29/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/29/2020 |
| PLAN CHECK FEE | ¤108.40 | 07/29/2020 |
| PLUMBING FEE | ¤222.60 | 07/29/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,786.09 |