I want to search for...

Permit #2020070038

Permit Details

Status: COED

Parcel Id: 21-10-30-5410-00000-2290
CONDITIONED SPACE: 1006 sqft
CONDITIONED SPACE: 1213 sqft
GARAGE: 367 sqft
OPENED PORCH (WITH ROOF) : 200 sqft
OPENED PORCH (WITH ROOF) : 46 sqft
Total Square Footage: 2832 sqft
Subdivision: 2135 - SAWMILL CREEK SUBDIVISION
Job Phone: 904-268-7730
Location Address: 36 RIDGE RD
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/29/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: PALM COAST FLORIDA HOLDINGS LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 229
Contracted Stated Job Value: ¤125,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/08/2020 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 12/08/2020 FINAL APPROVED DHANEY
BLD - BUILDING FINAL 12/07/2020 CANCELLED BY APPLICANT WEB
ROW - FINAL APRON (AFTER POUR) 12/04/2020 APPROVED RGROSS
ROW - STORMWATER FINAL 12/04/2020 APPROVED RGROSS
Note: ON SITE WITH SUPER ABOUT ROW MEASURMENTS FROM EOP TO BACK OF CURB THROUGHOUT THE SUB-DIVISION.
ROW FIELD SURVEY /GRADING CERTIFICATION 11/30/2020 APPROVED - AS NOTED RGROSS
Note: Note that before the final stormwater sand in gutter needs removed. seed and straw needs placed five feet out from finished property sod lines and any bare earth in the rear will need sod for stabilization of the pond bank.
FINAL SURVEY (OFFICE USE ONLY) 11/30/2020 APPROVED RGROSS
U-CROSS CONNECTION 11/06/2020 APPROVED - AS NOTED DHANEY
Note: Approved No Cross connection
ELECTRIC - EARLY POWER 11/05/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:40
ROW- PRE-APRON (PRE-POUR) 10/22/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION * APRON FULL OF WATER. * LEFT FRON CORNER OF FRONT ENTRANCE NEED MORE FOUNDATION OVERPOUR REMOVED TO AVOID FUTURE CHIPPING. 10/22/20 - ON SITE WITH SUB WHO IS PUMPING THE LAST BIT OF WATER OUR. AFTER THAT...READY TO POUR
ROW- PRE-APRON (PRE-POUR) 10/20/2020 Disapproved -FEE REQUIRED RGROSS
Note: * APRON FULL OF WATER. * LEFT FRON CORNER OF FRONT ENTRANCE NEED MORE FOUNDATION OVERPOUR REMOVED TO AVOID FUTURE CHIPPING.
ROW- PRE-APRON (PRE-POUR) 10/16/2020 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 10/14/2020 APPROVED JGIBSON
INSULATION 10/02/2020 APPROVED - AS NOTED JBODEN
Note: second floor window needs to be installed and spray foam applied. Left out for drywall stocking
LATH/BRICK/ WATER BARRIER 09/30/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION per test
LATH/BRICK/ WATER BARRIER 09/29/2020 CANCELLED BY APPLICANT JCOLASANTI
Note: per test
ALL ROUGH 09/28/2020 APPROVED JCOLASANTI
ROOF VALLEY & METAL 09/23/2020 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/21/2020 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 09/18/2020 APPROVED TDOAK
TIE BEAM / LINTEL 09/08/2020 APPROVED JCOLASANTI
MONOLITHIC SLAB 08/31/2020 APPROVED JBODEN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Not ready, Steel not placed. etc.
MONOLITHIC SLAB 08/28/2020 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION Not ready, Steel not placed. etc.
MONOLITHIC SLAB 08/27/2020 CANCELLED BY APPLICANT MMESSER
GRAVITY SEWER TEST 08/13/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NOT RAN NO PLUMBING
PLUMBING 1ST ROUGH UNDERGROUND 08/13/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NOT READY
GRAVITY SEWER TEST 08/12/2020 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 08/12/2020 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 08/11/2020 Disapproved -FEE REQUIRED JGIBSON
Note: NOT READY
GRAVITY SEWER TEST 08/11/2020 Disapproved - NO FEE JGIBSON
Note: NOT RAN NO PLUMBING
WATER METER INSTALLATION REQUEST 07/31/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/04/2020 12/04/2020
Note: Released By: GBERTOLA
ZON COMPLETE 12/03/2020 12/03/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 12/03/2020 12/04/2020
Note: Released By: TBAKER
ZON COMPLETE 10/15/2020 10/15/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 09/18/2020 09/18/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 09/18/2020 09/18/2020
Note: Released By: TDOAK
ZON COMPLETE 07/21/2020 07/21/2020
Note: Released By: AMOBLEY
BLD COMPLETE 07/21/2020 07/27/2020
Note: Released By: JPI
UD1 COMPLETE 07/21/2020 07/23/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 07/21/2020 07/22/2020
Note: Released By: TBAKER
SW1 COMPLETE 07/21/2020 07/21/2020
Note: Released By: CTROHA Stormwater not requested on Permit Correction/Revision Form
ZON HOLD 07/10/2020 07/10/2020
Note: Held By: AMOBLEY Landscape plan must specify height,material and color of fence for AC screening Site plan/survey has ac pad in a different location than the plans and landscape plan. They must all match
BADMIN HOLD 07/10/2020 07/10/2020
Note: Held By: STHOMAS 7-10-20 1. REMOVE '36 RIDGE' FROM ALL FILE NAMES 2. RENAME TO SITE PLAN.PDF, LANDSCAPE.PDF,...
BADMIN COMPLETE 07/10/2020 07/10/2020
Note: Released By: STHOMAS
BLD COMPLETE 07/01/2020 07/06/2020
Note: Released By: JPI
CUSVC COMPLETE 07/01/2020 07/07/2020
Note: Released By: HHAND
ELEC COMPLETE 07/01/2020 07/06/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/01/2020 07/02/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/01/2020 07/09/2020
Note: Released By: CSTONE
MECH COMPLETE 07/01/2020 07/06/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 07/01/2020 07/06/2020
Note: Released By: JPI
SW1 COMPLETE 07/01/2020 07/06/2020
Note: Released By: CTROHA
UTL COMPLETE 07/01/2020 07/10/2020
Note: Released By: AHALL
ZON HOLD 07/01/2020 07/02/2020
Note: Held By: AMOBLEY In subdivisions which typically have 5’ side setbacks, we are requiring fencing as screening around the mechanical equipment, one panel in the front and one on the side (City approved fence material and height) in lieu of the 7 gallon shrubs due to potential drainage issues. Survey must show all platted easements Survey states one story but plans are for a two story. Please correct survey
URB COMPLETE 07/01/2020 07/08/2020
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/09/2020
REINSPECTION FEE ¤40.00 12/09/2020
REINSPECTION FEE ¤40.00 12/09/2020
NEW RESIDENTIAL INSPECTIONS ¤542.00 07/29/2020
SITE PLAN 20 ¤20.00 07/29/2020
SURCHARGE FS 533.721 ¤2.00 07/29/2020
SURCHARGE - FS 468.631 ¤2.00 07/29/2020
STORM WATER PERMIT FEES ¤80.00 07/29/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 07/29/2020
SEWER INSPECTION ¤25.00 07/29/2020
SEWER CAPITAL FACILITY ¤2,389.36 07/29/2020
WATER CAPITAL FACILITY FEE ¤2,234.43 07/29/2020
METER - DEPOSIT ¤60.00 07/29/2020
WATER-METER ¤434.59 07/29/2020
WATER-METER ¤361.04 07/29/2020
ADMIN FEE ¤20.00 07/29/2020
CONNECTION FEES ¤25.00 07/29/2020
BUILDING DISCOUNT 100% (¤1,338.20) 07/29/2020
ELECTRIC FEE ¤222.60 07/29/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/29/2020
IMPACT FEE FIRE ¤223.38 07/29/2020
IMPACT FEE PARKS ¤849.24 07/29/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 07/29/2020
MECHANICAL FEE ¤222.60 07/29/2020
WATER -IRRIGATION INSPECTION ¤25.00 07/29/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/29/2020
PLAN CHECK FEE ¤108.40 07/29/2020
PLUMBING FEE ¤222.60 07/29/2020
Fees Total Due: ¤0.00 Total Paid: ¤9,786.09