I want to search for...
Permit #2020070055
Permit Details
Status: COED
| Parcel Id: 21-10-30-5410-00000-1880 |
| CONDITIONED SPACE: 1851 sqft |
| GARAGE: 408 sqft |
| OPENED PORCH (WITH ROOF) : 251 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 2564 sqft |
| Subdivision: 2135 - SAWMILL CREEK SUBDIVISION |
| Job Phone: 904-268-7730 |
| Location Address: 127 OAKLEAF WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/31/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: PALM COAST FLORIDA HOLDINGS LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 188 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/27/2021 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 01/27/2021 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 01/26/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION *SAND ALONG THE CURB NEEDS REMOVED. *SOD FROM THE CURB TO THE METER BOX IS ALL THROWN AROUND AND VERY UNEVEN FOR DRAINAGE. *LOW SPOT OFF THE RIGHT REAR CORNER OF THE BACK PORCH THAT WILL HOLD WATER.. 1/25/21 - STILL HAS A LOW SPOT OFF THE RIGHT REAR CORNER OF THE BACK PORCH THAT WILL HOLD WATER.. | |||
| ROW - STORMWATER FINAL | 01/25/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION *SAND ALONG THE CURB NEEDS REMOVED. *SOD FROM THE CURB TO THE METER BOX IS ALL THROWN AROUND AND VERY UNEVEN FOR DRAINAGE. *LOW SPOT OFF THE RIGHT REAR CORNER OF THE BACK PORCH THAT WILL HOLD WATER.. 1/25/21 - STILL HAS A LOW SPOT OFF THE RIGHT REAR CORNER OF THE BACK PORCH THAT WILL HOLD WATER.. | |||
| ROW - STORMWATER FINAL | 01/19/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: *SAND ALONG THE CURB NEEDS REMOVED. *SOD FROM THE CURB TO THE METER BOX IS ALL THROWN AROUND AND VERY UNEVEN FOR DRAINAGE. *LOW SPOT OFF THE RIGHT REAR CORNER OF THE BACK PORCH THAT WILL HOLD WATER.. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/19/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/28/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 12/28/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 11/16/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 11/12/2020 | CANCELLED BY APPLICANT | RGROSS |
| U-CROSS CONNECTION | 11/06/2020 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No Cross connection No Irr. | |||
| U - SEWER TIE IN | 11/06/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 11/03/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:41 AM | |||
| INSULATION | 10/05/2020 | APPROVED | JCOLASANTI |
| INSULATION | 10/05/2020 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 10/02/2020 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 09/30/2020 | APPROVED | JCOLASANTI |
| LATH/BRICK/ WATER BARRIER | 09/30/2020 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 09/28/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/08/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 08/31/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/17/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 08/11/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION not ready | |||
| MONOLITHIC SLAB | 08/10/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: not ready | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/04/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/03/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/31/2020 | 08/31/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 08/31/2020 | 08/31/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 07/29/2020 | 07/29/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 07/29/2020 | 07/29/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | HOLD | 07/28/2020 | 07/28/2020 |
| Note: Held By: CTROHA Corrections have not met codes Read checklist for corrections | |||
| ZON | COMPLETE | 07/21/2020 | 07/21/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | HOLD | 07/21/2020 | 07/21/2020 |
| Note: Held By: CTROHA See uploaded checklist and make corrections | |||
| BLD | COMPLETE | 07/21/2020 | 07/27/2020 |
| Note: Released By: JPI | |||
| ZON | HOLD | 07/10/2020 | 07/10/2020 |
| Note: Held By: AMOBLEY Landscape plan must specify height,material and color of fence for AC screening Site plan/survey has ac pad in a different location than the plans and landscape plan. They must all match | |||
| SW1 | HOLD | 07/10/2020 | 07/13/2020 |
| Note: Held By: CTROHA No changes have been made to site plan See previous notes | |||
| URB | COMPLETE | 07/02/2020 | 07/08/2020 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 07/01/2020 | 07/02/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/01/2020 | 07/07/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/01/2020 | 07/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/01/2020 | 07/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/01/2020 | 07/06/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 07/01/2020 | 07/02/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 07/01/2020 | 07/06/2020 |
| Note: Held By: CTROHA APPLICANT NEEDS TO RECHECK ELEVATIONS PLATTED PROPOSED FFE FOR THIS LOT IS 27.20 AS-BUILT STATES C/L ELEVATION OF ROAD IS 24.97 | |||
| UTL | COMPLETE | 07/01/2020 | 07/10/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 07/01/2020 | 07/02/2020 |
| Note: Held By: AMOBLEY Lot width at top of lot on survey/site plan incorrect We are requiring fencing as screening around the mechanical equipment, one panel in the front and one on the side (City approved fence material and height) in lieu of the 7 gallon shrubs due to potential drainage issues. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/28/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/28/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/28/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 07/31/2020 |
| SEWER INSPECTION | ¤25.00 | 07/31/2020 |
| SEWER CAPITAL FACILITY | ¤2,389.36 | 07/31/2020 |
| WATER CAPITAL FACILITY FEE | ¤2,234.43 | 07/31/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤470.00 | 07/31/2020 |
| SITE PLAN 20 | ¤20.00 | 07/31/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/31/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/31/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/31/2020 |
| METER - DEPOSIT | ¤60.00 | 07/31/2020 |
| WATER-METER | ¤434.59 | 07/31/2020 |
| WATER-METER | ¤361.04 | 07/31/2020 |
| ADMIN FEE | ¤20.00 | 07/31/2020 |
| CONNECTION FEES | ¤25.00 | 07/31/2020 |
| BUILDING DISCOUNT 100% | (¤1,187.00) | 07/31/2020 |
| ELECTRIC FEE | ¤201.00 | 07/31/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/31/2020 |
| IMPACT FEE FIRE | ¤223.38 | 07/31/2020 |
| IMPACT FEE PARKS | ¤849.24 | 07/31/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 07/31/2020 |
| MECHANICAL FEE | ¤201.00 | 07/31/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/31/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/31/2020 |
| PLAN CHECK FEE | ¤94.00 | 07/31/2020 |
| PLUMBING FEE | ¤201.00 | 07/31/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,786.09 |