Permit #2020070071

Permit Details

Status: FINAL

Parcel Id: 20-12-31-2950-00000-0170
GARAGE: 289 sqft
Total Square Footage: 289 sqft
Block: 00000
Subdivision: 2133 - GRAND LANDINGS - PHASE 1
Job Phone: 386-313-6922
Location Address: 106 SOUTH HUMMINGBIRD PL
Type: BA - BUILDING ADDITION
Issue Date: 08/10/2020
NOC: RECORDED
Applicant name: FRANK JOSEPH WHALEN
Owner: MOORE JOSEPH A & LESA SHARRON BOCKHORN JTWROS

Address

106 S HUMMINGBIRD PLACE

PALM COAST, FL 32137

Lot: 0170
Contracted Stated Job Value: ¤35,435.00
Job Description: GARAGE ADDITION
Type: CN

Contractor

EAST COAST BUILDING CORP
Status Location Address State License Number Phone Fax
ACTIVE

321 BRIARWOOD DRIVE

BUNNELL, FL 32110

CGC057860 (Exp: 08/31/2026) 386-313-6922 386-313-6922

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 02/05/2021 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 02/04/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 02/04/2021 APPROVED KRUTH
ROW - FINAL INSPECTION 02/04/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 02/03/2021 APPROVED KRUTH
LATH/BRICK/ WATER BARRIER 01/07/2021 APPROVED TSTAUFFACHER
ROW- PRE-APRON (PRE-POUR) 11/02/2020 APPROVED KRUTH
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/29/2020 APPROVED JBODEN
Note: THIS IS A REINSPECTION Need approved plans on site for follow-up inspections. notes are based on un-approved plans on site and are subject to change if approved plans differ. 1. New roof rafter connections to existing roof are not as proposed, please conform to plans or obtain approved revision and have on site for next inspection. (ok to dry in for protection of existing structure)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/25/2020 Disapproved - NO FEE WMILLER
Note: Need approved plans on site for follow-up inspections. notes are based on un-approved plans on site and are subject to change if approved plans differ. 1. New roof rafter connections to existing roof are not as proposed, please conform to plans or obtain approved revision and have on site for next inspection. (ok to dry in for protection of existing structure)
TIE BEAM / LINTEL 09/22/2020 CANCELLED BY APPLICANT FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Could not Verify Rebar into the existing as per page 3 of 5. 6" embedment drilled and Epoxied. 4 each side. 9/21/20 - STILL COULD NOT VERIFY REBAR DRILLED AND EPOXIED EVERY 24" AS PER PLAN IN EXISTING BUILDING. CONTRACTOR SHOULD HAVE SCHEDULED A DOWEL INSPECTION BEFORE LAYING BLOCK.
TIE BEAM / LINTEL 09/22/2020 APPROVED JBODEN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Could not Verify Rebar into the existing as per page 3 of 5. 6" embedment drilled and Epoxied. 4 each side. 9/21/20 - STILL COULD NOT VERIFY REBAR DRILLED AND EPOXIED EVERY 24" AS PER PLAN IN EXISTING BUILDING. CONTRACTOR SHOULD HAVE SCHEDULED A DOWEL INSPECTION BEFORE LAYING BLOCK.
TIE BEAM / LINTEL 09/21/2020 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION Could not Verify Rebar into the existing as per page 3 of 5. 6" embedment drilled and Epoxied. 4 each side. 9/21/20 - STILL COULD NOT VERIFY REBAR DRILLED AND EPOXIED EVERY 24" AS PER PLAN IN EXISTING BUILDING. CONTRACTOR SHOULD HAVE SCHEDULED A DOWEL INSPECTION BEFORE LAYING BLOCK.
TIE BEAM / LINTEL 09/17/2020 Disapproved - NO FEE FWILLIS
Note: Could not Verify Rebar into the existing as per page 3 of 5. 6" embedment drilled and Epoxied. 4 each side.
MONOLITHIC SLAB 09/01/2020 APPROVED FWILLIS
ALL ROUGH APPROVED TSTAUFFACHER
BLD - BUILDING FINAL APPROVED TSTAUFFACHER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/30/2020 11/02/2020
Note: Released By: TBAKER
ZON COMPLETE 10/30/2020 10/30/2020
Note: Released By: ELENS
UTL COMPLETE 10/30/2020 11/05/2020
Note: Released By: LFITZGERALD
SW1 COMPLETE 10/30/2020 11/02/2020
Note: Released By: CTROHA Stormwater review not requested on Permit Correction/Revision Form
BLD COMPLETE 10/22/2020 10/29/2020
Note: Released By: JBODEN
BLD COMPLETE 08/03/2020 08/10/2020
Note: Released By: FREODICA
ZON COMPLETE 07/24/2020 07/27/2020
Note: Released By: AMOBLEY
BLD HOLD 07/24/2020 07/31/2020
Note: Held By: FREODICA Provide Florida product approval of garage door as previously requested per FS 553.842. The submitted FL # 224537.2 can not be found on FL product approval listing. Most likely it should have been FL # 24537.2, however, the design pressure for this garage door shows +17.7/19.7 PSF and it does not meet the required design pressure of +22.4/-30.5 PSF as shown on plan. Please clarify. FReodica-386-986-4734
BLD HOLD 07/01/2020 07/10/2020
Note: Held By: FREODICA 1. Provide foundation plan and truss layout with connectors per FBC 6th Ed. Sec. 107.3.5. 2. Provide product approval for garage door, soffits and lintel per FS 553. 842. 3. Structural plan and Details (Sheet S1) indicated on Cover page is missing. FReodica -386-986-4734
ELEC COMPLETE 07/01/2020 07/06/2020
Note: Released By: JMUNSON
MECH COMPLETE 07/01/2020 07/06/2020
Note: Released By: CPISCITELLI
PLUM CANCEL 07/01/2020 07/10/2020
SW1 COMPLETE 07/01/2020 07/06/2020
Note: Released By: CTROHA
ZON HOLD 07/01/2020 07/02/2020
Note: Held By: TDOAK 1. There is a final survey available for this property. Please use the final survey (which includes all improvements (to include flatwork) when submitting corrections to site plan. 2. All garages must have driveways. Please show the driveway along with its material and dimensions on the proposed site plan. A three car garage must have a minimum 24' wide driveway. 3. Site plan must show setback from proposed garage addition to adjacent property lines. 4. Site plan must show new location of mechanical equipment, its dimensions and setbacks.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 08/10/2020
BUILDING DISCOUNT 100% (¤367.20) 08/10/2020
ELECTRIC FEE ¤81.60 08/10/2020
PLAN CHECK FEE ¤40.00 08/10/2020
PLUMBING FEE ¤81.60 08/10/2020
REMODEL/ADDITION/ACCES INSPECT ¤144.00 08/10/2020
SITE PLAN 20 ¤20.00 08/10/2020
SURCHARGE FS 533.721 ¤2.00 08/10/2020
SURCHARGE - FS 468.631 ¤2.00 08/10/2020
STORM WATER PERMIT FEES ¤80.00 08/10/2020
Fees Total Due: ¤0.00 Total Paid: ¤104.00