I want to search for...

Permit #2020070112

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00450-0020
CONDITIONED SPACE: 1876 sqft
GARAGE: 414 sqft
OPENED PORCH (WITH ROOF) : 300 sqft
OPENED PORCH (WITH ROOF) : 68 sqft
Total Square Footage: 2658 sqft
Block: 00450
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 904-268-7730
Location Address: 28 LANGDON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/21/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD RD STE 202

JACKSONVILLE, FL 32257

Lot: 0020
Contracted Stated Job Value: ¤125,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/23/2020 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 12/23/2020 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 12/23/2020 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 12/23/2020 APPROVED - AS NOTED DHANEY
Note: Approved will have sewer dept. finish pep tank
ROW - STORMWATER FINAL 12/22/2020 APPROVED GBERTOLA
ROW - FINAL APRON (AFTER POUR) 12/22/2020 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION I DID SPOKE WITH THE SUPER THEY OVERPOUR CONCRETE ON THE SWALE NEED TO BE REMOVED BOTH SIDE
ROW FIELD SURVEY /GRADING CERTIFICATION 12/21/2020 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION LEFT SIDE WHERE THEY PLACE A NEW GRASS ON THE SWALE, NEED TO BE LOWER WATER IS NOT GOINT TO FLOW YOU NEED TO MATCH THE EXISTEN LAID GRASS RIGHT SIDE IS A HUMP ON THE SWALE NEED TO BE LOWER EVRETHING IS PAINTED WITH PINK SPRAY PAINT CORRECTION MADE IT
FINAL SURVEY (OFFICE USE ONLY) 12/21/2020 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION INVERT NUMBERS DON'T MATCH 12/21/2020 =CORRECTION MADE
FINAL SURVEY (OFFICE USE ONLY) 12/17/2020 Disapproved - NO FEE GBERTOLA
Note: INVERT NUMBERS DON'T MATCH
ROW FIELD SURVEY /GRADING CERTIFICATION 12/17/2020 Disapproved - NO FEE GBERTOLA
Note: LEFT SIDE WHERE THEY PLACE A NEW GRASS ON THE SWALE, NEED TO BE LOWER WATER IS NOT GOINT TO FLOW YOU NEED TO MATCH THE EXISTEN LAID GRASS RIGHT SIDE IS A HUMP ON THE SWALE NEED TO BE LOWER EVRETHING IS PAINTED WITH PINK SPRAY PAINT
U-CROSS CONNECTION 12/14/2020 APPROVED - AS NOTED DHANEY
Note: Approved No IRR. No Cross CN.
ROW - FINAL APRON (AFTER POUR) 12/14/2020 CANCELLED BY APPLICANT GBERTOLA
ELECTRIC - EARLY POWER 12/09/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:20
ELECTRIC - EARLY POWER 12/07/2020 Disapproved - NO FEE RMARTIN
Note: FLOOR TILE WET, COULD NOT GET INTO KITCHEN, WAS ABLE TO SEE RANGE OUTLET NEEDS COVER
ROW- PRE-APRON (PRE-POUR) 12/01/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION READY TO POUR
ROW- PRE-APRON (PRE-POUR) 11/30/2020 CANCELLED BY APPLICANT RGROSS
Note: 9
U - SEWER TIE IN 11/24/2020 APPROVED JGIBSON
PEP TANK INSTALLATION REQUEST 11/05/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 11/05/2020 APPROVED JCOLASANTI
INSULATION 11/03/2020 APPROVED JCOLASANTI
ALL ROUGH 10/29/2020 APPROVED JCOLASANTI
ROOF VALLEY & METAL 10/28/2020 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/06/2020 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 09/21/2020 APPROVED TBAKER
TIE BEAM / LINTEL 09/09/2020 APPROVED JCOLASANTI
MONOLITHIC SLAB 08/31/2020 APPROVED JBODEN
PLUMBING 1ST ROUGH UNDERGROUND 08/27/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 08/27/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/05/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 11/19/2020 11/30/2020
Note: Released By: FREODICA Revision: added screen enclosure.
ZON COMPLETE 11/19/2020 11/19/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 09/18/2020 09/21/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 09/18/2020 09/18/2020
Note: Released By: AMOBLEY
SWALE COMPLETE 07/06/2020 07/17/2020
Note: Released By: TBAKER
BLD COMPLETE 07/02/2020 07/07/2020
Note: Released By: JPI
CUSVC COMPLETE 07/02/2020 07/08/2020
Note: Released By: HHAND
ELEC COMPLETE 07/02/2020 07/06/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/02/2020 07/06/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/02/2020 07/09/2020
Note: Released By: CSTONE
MECH COMPLETE 07/02/2020 07/06/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 07/02/2020 07/07/2020
Note: Released By: JPI
SW1 COMPLETE 07/02/2020 07/06/2020
Note: Released By: CTROHA
UTL COMPLETE 07/02/2020 07/10/2020
Note: Released By: AHALL
ZON COMPLETE 07/02/2020 07/02/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 12/22/2020
SITE PLAN 20 ¤20.00 07/21/2020
SURCHARGE FS 533.721 ¤2.00 07/21/2020
SURCHARGE - FS 468.631 ¤2.00 07/21/2020
STORM WATER PERMIT FEES ¤80.00 07/21/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 07/21/2020
SEWER CREDIT (¤1,354.58) 07/21/2020
SEWER INSPECTION ¤25.00 07/21/2020
SEWER CAPITAL FACILITY ¤4,596.07 07/21/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 07/21/2020
METER - DEPOSIT ¤60.00 07/21/2020
WATER- TURN ON ¤25.00 07/21/2020
ADMIN FEE ¤20.00 07/21/2020
CONNECTION FEES ¤1,002.88 07/21/2020
BUILDING DISCOUNT 100% (¤1,208.00) 07/21/2020
ELECTRIC FEE ¤204.00 07/21/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/21/2020
IMPACT FEE FIRE ¤223.38 07/21/2020
IMPACT FEE PARKS ¤849.24 07/21/2020
IMPACT FEE SCHOOL ¤3,600.00 07/21/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 07/21/2020
MECHANICAL FEE ¤204.00 07/21/2020
WATER -IRRIGATION INSPECTION ¤25.00 07/21/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/21/2020
PLAN CHECK FEE ¤96.00 07/21/2020
PLUMBING FEE ¤204.00 07/21/2020
NEW RESIDENTIAL INSPECTIONS ¤480.00 07/21/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,161.77