Permit #2020070123

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00720-0180
CONDITIONED SPACE: 1806 sqft
GARAGE: 413 sqft
OPENED PORCH (WITH ROOF) : 240 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 2519 sqft
Block: 00720
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 386-960-7720
Location Address: 2 PITTWICK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/16/2020
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC

Address

590 MALABAR RD SE STE 3

PALM BAY, FL 32907

Lot: 0180
Contracted Stated Job Value: ¤240,510.00
Job Description: Single Family Residence
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
DOUGLAS EDWARD RICHARDS
Status Location Address State License Number Phone Fax
INACTIVE

108 E INDIANA AVENUE

DELAND, FL 32724

CCC1328824 (Exp: 08/31/2024) 386-736-4226 386-740-0535
BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/29/2020 FINAL APPROVED MMESSER
U -UTILITY RESIDENTIAL FINAL 12/29/2020 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 12/28/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION the road has to be repaired to stabilize the road at the driveway
ROW - STORMWATER FINAL 12/22/2020 APPROVED KRUTH
U-CROSS CONNECTION 12/22/2020 APPROVED - AS NOTED JHARDING
Note: Approved. No crossconnections.
ROW - FINAL APRON (AFTER POUR) 12/22/2020 Disapproved -FEE REQUIRED KRUTH
Note: the road has to be repaired to stabilize the road at the driveway
ROW FIELD SURVEY /GRADING CERTIFICATION 12/21/2020 APPROVED - AS NOTED GBERTOLA
Note: . REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT
FINAL SURVEY (OFFICE USE ONLY) 12/21/2020 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 12/14/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:40
ELECTRIC - EARLY POWER 12/09/2020 Disapproved - NO FEE JMUNSON
Note: Wire by service needs to be safed off
GRAVITY SEWER TEST 12/04/2020 APPROVED JGIBSON
U - SEWER TIE IN 12/04/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 11/16/2020 APPROVED - AS NOTED GBERTOLA
Note: READY TO POUR. RAIN IN FORECAST. BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. FOOTERS HAVE WASHED IN NEED TO BE DUG OUT
INSULATION 11/03/2020 APPROVED MMESSER
INSULATION 11/02/2020 CANCELLED BY APPLICANT WEB
PEP TANK INSTALLATION REQUEST 11/02/2020 APPROVED CSTONE
ALL ROUGH 10/30/2020 APPROVED - AS NOTED MMESSER
Note: Ground motor for tub.
LATH/BRICK/ WATER BARRIER 10/21/2020 APPROVED MMESSER
ROOF VALLEY & METAL 10/16/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/29/2020 APPROVED MMESSER
TIE BEAM / LINTEL 09/18/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 09/16/2020 APPROVED TBAKER
MONOLITHIC SLAB 09/01/2020 APPROVED - AS NOTED MMESSER
Note: Clean washout around rebar.
PLUMBING 1ST ROUGH UNDERGROUND 08/26/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/03/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 09/15/2020 09/15/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 09/15/2020 09/16/2020
Note: Released By: TBAKER
ZON COMPLETE 07/10/2020 07/10/2020
Note: Released By: AMOBLEY
MECH COMPLETE 07/10/2020 07/10/2020
Note: Released By: CPISCITELLI
BLD COMPLETE 07/10/2020 07/13/2020
Note: Released By: JPI
ELEC COMPLETE 07/10/2020 07/10/2020
Note: Released By: JMUNSON
SWALE COMPLETE 07/06/2020 07/17/2020
Note: Released By: TBAKER
BLD COMPLETE 07/02/2020 07/07/2020
Note: Released By: JPI
CUSVC COMPLETE 07/02/2020 07/08/2020
Note: Released By: HHAND
ELEC COMPLETE 07/02/2020 07/06/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/02/2020 07/06/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/02/2020 07/09/2020
Note: Released By: CSTONE
MECH HOLD 07/02/2020 07/06/2020
Note: Held By: CPISCITELLI Duct Drawing needs to be signed by the AC contractor
PLUM COMPLETE 07/02/2020 07/07/2020
Note: Released By: JPI 1. Plumbing isometric does not illustrate size of vent for washing machine. 2. Plumbing isometric does not indicate venting for kitchen sink.
SW1 COMPLETE 07/02/2020 07/06/2020
Note: Released By: CTROHA
UTL COMPLETE 07/02/2020 07/10/2020
Note: Released By: AHALL
ZON HOLD 07/02/2020 07/02/2020
Note: Held By: AMOBLEY Lot requires a total of 6 trees. Need one additional tree Can not have windowless walls facing a public right of way (right side)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/31/2020
NEW RESIDENTIAL INSPECTIONS ¤482.00 07/16/2020
SITE PLAN 20 ¤20.00 07/16/2020
SURCHARGE FS 533.721 ¤2.00 07/16/2020
SURCHARGE - FS 468.631 ¤2.00 07/16/2020
STORM WATER PERMIT FEES ¤80.00 07/16/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 07/16/2020
SEWER CREDIT (¤1,147.00) 07/16/2020
SEWER INSPECTION ¤25.00 07/16/2020
SEWER CAPITAL FACILITY ¤4,596.07 07/16/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 07/16/2020
METER - DEPOSIT ¤60.00 07/16/2020
WATER- TURN ON ¤25.00 07/16/2020
ADMIN FEE ¤20.00 07/16/2020
CONNECTION FEES ¤1,002.88 07/16/2020
BUILDING DISCOUNT 100% (¤1,212.20) 07/16/2020
ELECTRIC FEE ¤204.60 07/16/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/16/2020
IMPACT FEE FIRE ¤223.38 07/16/2020
IMPACT FEE PARKS ¤849.24 07/16/2020
IMPACT FEE SCHOOL ¤3,600.00 07/16/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 07/16/2020
MECHANICAL FEE ¤204.60 07/16/2020
WATER -IRRIGATION INSPECTION ¤25.00 07/16/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/16/2020
PLAN CHECK FEE ¤96.40 07/16/2020
PLUMBING FEE ¤204.60 07/16/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,369.35