I want to search for...

Permit #2020070145

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00080-0420
CONDITIONED SPACE: 1853 sqft
GARAGE: 446 sqft
OPENED PORCH (WITH ROOF) : 142 sqft
OPENED PORCH (WITH ROOF) : 80 sqft
Total Square Footage: 2521 sqft
Block: 00080
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 386-931-5395
Location Address: 23 FORTUNE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/21/2020
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: WATERSIDE HOMES RENOVATIONS AND DESIGNS

Address

10 BISCAYNE DROVE

PALM COAST, FL 32137

Lot: 0420
Contracted Stated Job Value: ¤184,000.00
Job Description: single family residence
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/01/2021 FINAL APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. revision needed for (different brand) MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 01-29-21... still need the fllowing UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 02-01-21... DEFICIENCIES NOTED ABOVE RESOLVED
BLD - BUILDING FINAL 01/29/2021 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION 1. revision needed for (different brand) MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 01-29-21... still need the fllowing UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL.
BLD - BUILDING FINAL 01/28/2021 Disapproved -FEE REQUIRED WMILLER
Note: 1. revision needed for (different brand) MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 3. missing address numbers
U-CROSS CONNECTION 01/28/2021 APPROVED - AS NOTED DHANEY
Note: Approved No Cross CN.
U -UTILITY RESIDENTIAL FINAL 01/28/2021 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 01/27/2021 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION ROAD REPAIR STILL NEEDS DONE. ROAD CUT OUT AND READY FOR HOT PATCH. SEE NOTES ON FINAL STORMWATER TO ENSURE HOT PATCH IS USED.
ROW - STORMWATER FINAL 01/27/2021 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION TRASH IN THE DITCH NEEDS REMOVED. SEE ALSO FINAL APRON RESULTS. 1/27/21 - SEE NOTES ON FIELD SURVEY INSPECTED THE DAY BEFORE. *PICK UP TRASH ACROSS THE STREET IN THE SWALE. *PICK UP TRASH IN THE DITCH ALONG THE LEFT SIDE OF THE PROPERTY. *ROAD REPAIR NOT COMPLETED YET.
ROW - STORMWATER FINAL 01/27/2021 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION TRASH IN THE DITCH NEEDS REMOVED. SEE ALSO FINAL APRON RESULTS. 1/27/21 - SEE NOTES ON FIELD SURVEY INSPECTED THE DAY BEFORE. *PICK UP TRASH ACROSS THE STREET IN THE SWALE. *PICK UP TRASH IN THE DITCH ALONG THE LEFT SIDE OF THE PROPERTY. *ROAD REPAIR NOT COMPLETED YET. 1/27/21 - RESCHEDULED BY INSPECTOR AS A COURTESY TO ALLOW FOR AN EARLY CO. ROAD REPAIRED AND TRASH REMOVED FROM EARLIER INSPECTION.
ROW FIELD SURVEY /GRADING CERTIFICATION 01/26/2021 APPROVED - AS NOTED RGROSS
Note: TRASH IN DITCH NEEDS REMOVED AND ROAD REPAIR NEEDS DONE BEFORE THE FINALS WILL BE.
ROW - STORMWATER FINAL 01/26/2021 Disapproved - NO FEE RGROSS
Note: TRASH IN THE DITCH NEEDS REMOVED. SEE ALSO FINAL APRON RESULTS.
ROW - FINAL APRON (AFTER POUR) 01/26/2021 Disapproved -FEE REQUIRED RGROSS
Note: ROAD REPAIR STILL NEEDS DONE.
FINAL SURVEY (OFFICE USE ONLY) 01/26/2021 APPROVED - AS NOTED RGROSS
Note: PART OF THE DRAINAGE CONVEYANCE APPROVED TO FLOW UNDER THE FENCE AND INTO THE ADJACENT DITCH.
ROW- PRE-APRON (PRE-POUR) 01/08/2021 APPROVED - AS NOTED RGROSS
Note: CULVERT IS SET AROUND 5 INCHES LOWER THAN THE CB JUST 15 FEET AWAY. HOWEVER, THE ELEVATION OF THE CULVERT COULD NOT BE ADJUSTED DUE TO THE ELEVATION OF THE UPSTREAM CULVERTS. IF THERE ARE ISSUES WITH DRAINAGE THE CITY WILL HAVE TO ADJUST THE CB ELEVATION SOMETIME IN THE FUTURE TO ALLOW FOR BETTER DRAINAGE.
ELECTRIC - EARLY POWER 01/07/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:45
GRAVITY SEWER TEST 01/04/2021 APPROVED JGIBSON
U - SEWER TIE IN 01/04/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 12/30/2020 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 12/30/2020 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 12/23/2020 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 12/23/2020 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 11/05/2020 APPROVED TSTAUFFACHER
INSULATION 11/05/2020 APPROVED TSTAUFFACHER
ALL ROUGH 10/28/2020 APPROVED - AS NOTED TSTAUFFACHER
Note: OK to insulate. Three fixed windows need three screws in sill according to installation instructions. Check at insulation TS I am missing one window and am seeing if we can check on insulation if all other items pass on the all rough
ELECTRIC-TUG 10/07/2020 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION PVC needs to be glued in MA fitting.NEC2014 352.48 emailed fpl released power 10:15
ROOF VALLEY & METAL 10/02/2020 APPROVED JBODEN
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/01/2020 APPROVED WMILLER
ROOF VALLEY & METAL 10/01/2020 CANCELLED BY APPLICANT WMILLER
ELECTRIC - EARLY POWER 10/01/2020 CANCELLED BY APPLICANT WEB
Note: I
ELECTRIC - EARLY POWER 10/01/2020 CANCELLED BY APPLICANT WEB
Note: can i please get a TUG inspection there was no where to click or find tug so I am requesting early power but need a TUG instead please
ELECTRIC-TUG 10/01/2020 Disapproved - NO FEE JMUNSON
Note: PVC needs to be glued in MA fitting.NEC2014 352.48
TIE BEAM / LINTEL 09/18/2020 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 09/02/2020 APPROVED TBAKER
MONOLITHIC SLAB 08/20/2020 APPROVED WMILLER
Note: THIS IS A REINSPECTION 1. Maximum OC spacing at transverse reinforcement exceeded per detail number 2A 2. Minimum clearance on reinforcing not met per FBC R404.1.3.3.7.4 (washed in all over from rains , check all) 8-20-2020 Approved (deficiencies resolved)
MONOLITHIC SLAB 08/19/2020 Disapproved - NO FEE WMILLER
Note: 1. Maximum OC spacing at transverse reinforcement exceeded per detail number 2A 2. Minimum clearance on reinforcing not met per FBC R404.1.3.3.7.4 (washed in all over from rains , check all)
PLUMBING 1ST ROUGH UNDERGROUND 08/13/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/30/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/28/2021 01/28/2021
Note: Released By: CPISCITELLI
BADMIN COMPLETE 01/22/2021 01/22/2021
Note: Released By: MDEFREITAS
BADMIN HOLD 12/21/2020 12/21/2020
Note: Held By: JMONTARULI Blower Door is for a different address
BADMIN HOLD 12/16/2020 12/16/2020
Note: Held By: BBEMBRY A fence requires a separate permit.
BADMIN COMPLETE 12/16/2020 12/16/2020
Note: Released By: BBEMBRY
BADMIN HOLD 09/01/2020 09/01/2020
Note: Held By: STHOMAS PLEASE SELECT 'FOUNDATION SURVEY' NOT 'AS-BUILTS'. RENAME TO FOUNDATION SURVEY.PDF
BADMIN COMPLETE 09/01/2020 09/01/2020
Note: Released By: STHOMAS
ZON COMPLETE 09/01/2020 09/02/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 09/01/2020 09/02/2020
Note: Released By: TBAKER
BLD COMPLETE 07/15/2020 07/15/2020
Note: Released By: JPI
ZON COMPLETE 07/13/2020 07/13/2020
Note: Released By: ELENS
SWALE COMPLETE 07/08/2020 07/20/2020
Note: Released By: TBAKER
BLD HOLD 07/07/2020 07/09/2020
Note: Held By: JPI 1. Missing items from PA spec sheet: roof underlayment, Zip system and roof vent.
CUSVC COMPLETE 07/07/2020 07/08/2020
Note: Released By: HHAND
ELEC COMPLETE 07/07/2020 07/09/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/07/2020 07/08/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/07/2020 07/09/2020
Note: Released By: CSTONE
MECH COMPLETE 07/07/2020 07/08/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 07/07/2020 07/09/2020
Note: Released By: JPI
SW1 COMPLETE 07/07/2020 07/09/2020
Note: Released By: RGROSS
UTL COMPLETE 07/07/2020 07/10/2020
Note: Released By: AHALL
ZON HOLD 07/07/2020 07/08/2020
Note: Held By: ELENS Please add square footage of covered entry to floor plan square footage chart/calculations Exterior material is Stucco on the elevations. The color sheet states "latex aesthetic white/touch of sand half calif" (I think). Two accent colors are allowed and you have them listed further down on the color sheet. Please clarify.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/29/2021
REINSPECTION FEE ¤40.00 01/29/2021
STORMWATER REINSPECTION FEE ¤40.00 01/29/2021
STORMWATER REINSPECTION FEE ¤40.00 01/29/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 07/21/2020
SEWER CREDIT (¤2,465.75) 07/21/2020
SEWER INSPECTION ¤25.00 07/21/2020
SEWER CAPITAL FACILITY ¤4,596.07 07/21/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 07/21/2020
NEW RESIDENTIAL INSPECTIONS ¤466.00 07/21/2020
SITE PLAN 20 ¤20.00 07/21/2020
SURCHARGE FS 533.721 ¤2.00 07/21/2020
SURCHARGE - FS 468.631 ¤2.00 07/21/2020
STORM WATER PERMIT FEES ¤80.00 07/21/2020
METER - DEPOSIT ¤60.00 07/21/2020
WATER- TURN ON ¤25.00 07/21/2020
ADMIN FEE ¤20.00 07/21/2020
CONNECTION FEES ¤1,002.88 07/21/2020
BUILDING DISCOUNT 100% (¤1,178.60) 07/21/2020
ELECTRIC FEE ¤199.80 07/21/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/21/2020
IMPACT FEE FIRE ¤223.38 07/21/2020
IMPACT FEE PARKS ¤849.24 07/21/2020
IMPACT FEE SCHOOL ¤3,600.00 07/21/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 07/21/2020
MECHANICAL FEE ¤199.80 07/21/2020
WATER -IRRIGATION INSPECTION ¤25.00 07/21/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/21/2020
PLAN CHECK FEE ¤93.20 07/21/2020
PLUMBING FEE ¤199.80 07/21/2020
Fees Total Due: ¤0.00 Total Paid: ¤13,170.60