I want to search for...
Permit #2020070145
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00080-0420 |
| CONDITIONED SPACE: 1853 sqft |
| GARAGE: 446 sqft |
| OPENED PORCH (WITH ROOF) : 142 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 2521 sqft |
| Block: 00080 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-931-5395 |
| Location Address: 23 FORTUNE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/21/2020 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: WATERSIDE HOMES RENOVATIONS AND DESIGNS |
|
Address 10 BISCAYNE DROVE PALM COAST, FL 32137 |
| Lot: 0420 |
| Contracted Stated Job Value: ¤184,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/01/2021 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. revision needed for (different brand) MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 01-29-21... still need the fllowing UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 02-01-21... DEFICIENCIES NOTED ABOVE RESOLVED | |||
| BLD - BUILDING FINAL | 01/29/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION 1. revision needed for (different brand) MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 01-29-21... still need the fllowing UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. | |||
| BLD - BUILDING FINAL | 01/28/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. revision needed for (different brand) MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER UNIT WITH FACTORY APPLIED LABEL. 3. missing address numbers | |||
| U-CROSS CONNECTION | 01/28/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No Cross CN. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/28/2021 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 01/27/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION ROAD REPAIR STILL NEEDS DONE. ROAD CUT OUT AND READY FOR HOT PATCH. SEE NOTES ON FINAL STORMWATER TO ENSURE HOT PATCH IS USED. | |||
| ROW - STORMWATER FINAL | 01/27/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION TRASH IN THE DITCH NEEDS REMOVED. SEE ALSO FINAL APRON RESULTS. 1/27/21 - SEE NOTES ON FIELD SURVEY INSPECTED THE DAY BEFORE. *PICK UP TRASH ACROSS THE STREET IN THE SWALE. *PICK UP TRASH IN THE DITCH ALONG THE LEFT SIDE OF THE PROPERTY. *ROAD REPAIR NOT COMPLETED YET. | |||
| ROW - STORMWATER FINAL | 01/27/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION TRASH IN THE DITCH NEEDS REMOVED. SEE ALSO FINAL APRON RESULTS. 1/27/21 - SEE NOTES ON FIELD SURVEY INSPECTED THE DAY BEFORE. *PICK UP TRASH ACROSS THE STREET IN THE SWALE. *PICK UP TRASH IN THE DITCH ALONG THE LEFT SIDE OF THE PROPERTY. *ROAD REPAIR NOT COMPLETED YET. 1/27/21 - RESCHEDULED BY INSPECTOR AS A COURTESY TO ALLOW FOR AN EARLY CO. ROAD REPAIRED AND TRASH REMOVED FROM EARLIER INSPECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/26/2021 | APPROVED - AS NOTED | RGROSS |
| Note: TRASH IN DITCH NEEDS REMOVED AND ROAD REPAIR NEEDS DONE BEFORE THE FINALS WILL BE. | |||
| ROW - STORMWATER FINAL | 01/26/2021 | Disapproved - NO FEE | RGROSS |
| Note: TRASH IN THE DITCH NEEDS REMOVED. SEE ALSO FINAL APRON RESULTS. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/26/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: ROAD REPAIR STILL NEEDS DONE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/26/2021 | APPROVED - AS NOTED | RGROSS |
| Note: PART OF THE DRAINAGE CONVEYANCE APPROVED TO FLOW UNDER THE FENCE AND INTO THE ADJACENT DITCH. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/08/2021 | APPROVED - AS NOTED | RGROSS |
| Note: CULVERT IS SET AROUND 5 INCHES LOWER THAN THE CB JUST 15 FEET AWAY. HOWEVER, THE ELEVATION OF THE CULVERT COULD NOT BE ADJUSTED DUE TO THE ELEVATION OF THE UPSTREAM CULVERTS. IF THERE ARE ISSUES WITH DRAINAGE THE CITY WILL HAVE TO ADJUST THE CB ELEVATION SOMETIME IN THE FUTURE TO ALLOW FOR BETTER DRAINAGE. | |||
| ELECTRIC - EARLY POWER | 01/07/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:45 | |||
| GRAVITY SEWER TEST | 01/04/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 01/04/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/30/2020 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 12/30/2020 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 12/23/2020 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 12/23/2020 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 11/05/2020 | APPROVED | TSTAUFFACHER |
| INSULATION | 11/05/2020 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 10/28/2020 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: OK to insulate. Three fixed windows need three screws in sill according to installation instructions. Check at insulation TS I am missing one window and am seeing if we can check on insulation if all other items pass on the all rough | |||
| ELECTRIC-TUG | 10/07/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION PVC needs to be glued in MA fitting.NEC2014 352.48 emailed fpl released power 10:15 | |||
| ROOF VALLEY & METAL | 10/02/2020 | APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/01/2020 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 10/01/2020 | CANCELLED BY APPLICANT | WMILLER |
| ELECTRIC - EARLY POWER | 10/01/2020 | CANCELLED BY APPLICANT | WEB |
| Note: I | |||
| ELECTRIC - EARLY POWER | 10/01/2020 | CANCELLED BY APPLICANT | WEB |
| Note: can i please get a TUG inspection there was no where to click or find tug so I am requesting early power but need a TUG instead please | |||
| ELECTRIC-TUG | 10/01/2020 | Disapproved - NO FEE | JMUNSON |
| Note: PVC needs to be glued in MA fitting.NEC2014 352.48 | |||
| TIE BEAM / LINTEL | 09/18/2020 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 09/02/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/20/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION 1. Maximum OC spacing at transverse reinforcement exceeded per detail number 2A 2. Minimum clearance on reinforcing not met per FBC R404.1.3.3.7.4 (washed in all over from rains , check all) 8-20-2020 Approved (deficiencies resolved) | |||
| MONOLITHIC SLAB | 08/19/2020 | Disapproved - NO FEE | WMILLER |
| Note: 1. Maximum OC spacing at transverse reinforcement exceeded per detail number 2A 2. Minimum clearance on reinforcing not met per FBC R404.1.3.3.7.4 (washed in all over from rains , check all) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/13/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/30/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: CPISCITELLI | |||
| BADMIN | COMPLETE | 01/22/2021 | 01/22/2021 |
| Note: Released By: MDEFREITAS | |||
| BADMIN | HOLD | 12/21/2020 | 12/21/2020 |
| Note: Held By: JMONTARULI Blower Door is for a different address | |||
| BADMIN | HOLD | 12/16/2020 | 12/16/2020 |
| Note: Held By: BBEMBRY A fence requires a separate permit. | |||
| BADMIN | COMPLETE | 12/16/2020 | 12/16/2020 |
| Note: Released By: BBEMBRY | |||
| BADMIN | HOLD | 09/01/2020 | 09/01/2020 |
| Note: Held By: STHOMAS PLEASE SELECT 'FOUNDATION SURVEY' NOT 'AS-BUILTS'. RENAME TO FOUNDATION SURVEY.PDF | |||
| BADMIN | COMPLETE | 09/01/2020 | 09/01/2020 |
| Note: Released By: STHOMAS | |||
| ZON | COMPLETE | 09/01/2020 | 09/02/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 09/01/2020 | 09/02/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 07/15/2020 | 07/15/2020 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 07/13/2020 | 07/13/2020 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 07/08/2020 | 07/20/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 07/07/2020 | 07/09/2020 |
| Note: Held By: JPI 1. Missing items from PA spec sheet: roof underlayment, Zip system and roof vent. | |||
| CUSVC | COMPLETE | 07/07/2020 | 07/08/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/07/2020 | 07/09/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/07/2020 | 07/08/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/07/2020 | 07/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/07/2020 | 07/08/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 07/07/2020 | 07/09/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 07/07/2020 | 07/09/2020 |
| Note: Released By: RGROSS | |||
| UTL | COMPLETE | 07/07/2020 | 07/10/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 07/07/2020 | 07/08/2020 |
| Note: Held By: ELENS Please add square footage of covered entry to floor plan square footage chart/calculations Exterior material is Stucco on the elevations. The color sheet states "latex aesthetic white/touch of sand half calif" (I think). Two accent colors are allowed and you have them listed further down on the color sheet. Please clarify. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/29/2021 |
| REINSPECTION FEE | ¤40.00 | 01/29/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/29/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 01/29/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 07/21/2020 |
| SEWER CREDIT | (¤2,465.75) | 07/21/2020 |
| SEWER INSPECTION | ¤25.00 | 07/21/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 07/21/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 07/21/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤466.00 | 07/21/2020 |
| SITE PLAN 20 | ¤20.00 | 07/21/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/21/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/21/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/21/2020 |
| METER - DEPOSIT | ¤60.00 | 07/21/2020 |
| WATER- TURN ON | ¤25.00 | 07/21/2020 |
| ADMIN FEE | ¤20.00 | 07/21/2020 |
| CONNECTION FEES | ¤1,002.88 | 07/21/2020 |
| BUILDING DISCOUNT 100% | (¤1,178.60) | 07/21/2020 |
| ELECTRIC FEE | ¤199.80 | 07/21/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/21/2020 |
| IMPACT FEE FIRE | ¤223.38 | 07/21/2020 |
| IMPACT FEE PARKS | ¤849.24 | 07/21/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/21/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 07/21/2020 |
| MECHANICAL FEE | ¤199.80 | 07/21/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/21/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/21/2020 |
| PLAN CHECK FEE | ¤93.20 | 07/21/2020 |
| PLUMBING FEE | ¤199.80 | 07/21/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,170.60 |