Permit #2020070253
Permit Details
Status: COED
| Parcel Id: 21-10-30-5410-00000-1580 |
| CONDITIONED SPACE: 1702 sqft |
| GARAGE: 594 sqft |
| OPENED PORCH (WITH ROOF) : 159 sqft |
| OPENED PORCH (WITH ROOF) : 85 sqft |
| Total Square Footage: 2540 sqft |
| Subdivision: 2135 - SAWMILL CREEK SUBDIVISION |
| Job Phone: 904-268-7730 |
| Location Address: 100 OAKLEAF WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/11/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES OF FLORIDA |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/01/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Advise cont. to replace plastic sewer clean out cap with Brass cap in Drive way. | |||
| BLD - BUILDING FINAL | 01/27/2021 | FINAL APPROVED | FWILLIS |
| U-CROSS CONNECTION | 01/26/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No Cross CN. | |||
| ROW - STORMWATER FINAL | 01/26/2021 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 01/26/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/21/2021 | APPROVED - AS NOTED | RGROSS |
| Note: FINAL STORMWATER WILL NOT BE APPROVED UNTIL THE FOLLOWING IS COMPLETED: SOD PLACED AT THE END OF THE SIDEWALK AND ONE ROW ACROSS THE BACK OF THE MIAMI CURB FROM SIDEWALK TO 7 FT AWAY. REESTABLISH THE SOD BUFFER TO PREVENT WASHOUT. SAND IN THE CURB AND SIDEWALK EXIT TO THE STREET WILL NEED REMOVED. SEED AND STRAW THE FIRST 5 FT ALL ALONG THE LEFT PROPERTY LINE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/21/2021 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 12/10/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:20 | |||
| ROW- PRE-APRON (PRE-POUR) | 12/08/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Sidewalk not shown on the approved proposed survey. New revised site plan must also include the ROW measurements from the EOP (Edge of Pavement) to the property line. 12/8/20 - READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 12/02/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Sidewalk not shown on the approved proposed survey. New revised site plan must also include the ROW measurements from the EOP (Edge of Pavement) to the property line. | |||
| U - SEWER TIE IN | 11/12/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 11/06/2020 | CANCELLED BY APPLICANT | JGIBSON |
| INSULATION | 10/28/2020 | APPROVED | JCOLASANTI |
| LATH/BRICK/ WATER BARRIER | 10/28/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/27/2020 | CANCELLED BY APPLICANT | JCOLASANTI |
| ALL ROUGH | 10/26/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need to seal AC chase | |||
| ROOF VALLEY & METAL | 10/13/2020 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/08/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 10/07/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/14/2020 | APPROVED | JCOLASANTI |
| MONOLITHIC SLAB | 08/28/2020 | APPROVED - AS NOTED | JBODEN |
| Note: THIS IS A REINSPECTION Missing one upright at entry | |||
| MONOLITHIC SLAB | 08/27/2020 | CANCELLED BY APPLICANT | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/18/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/18/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/18/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/26/2021 | 01/29/2021 |
| Note: Released By: KRUTH | |||
| ZON | COMPLETE | 01/26/2021 | 01/26/2021 |
| Note: Released By: AMOBLEY | |||
| SW1 | HOLD | 12/04/2020 | 12/04/2020 |
| Note: Held By: GBERTOLA PLEASE CHECK THE RESIDENTIAL SITE PLAN REVIEWS Lot drainage features and patterns must be clearly depicted and include flow arrows. Existing interior elevations on a 20’ grid. (E) | |||
| ZON | COMPLETE | 12/03/2020 | 12/03/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 12/03/2020 | 12/04/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 10/06/2020 | 10/06/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 10/06/2020 | 10/06/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 10/05/2020 | 10/05/2020 |
| Note: Held By: TDOAK REPEAT COMMENT: Please show front setback on foundation survey. | |||
| ENGIN1 | COMPLETE | 10/05/2020 | 10/06/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 09/25/2020 | 09/28/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | HOLD | 09/25/2020 | 09/25/2020 |
| Note: Held By: AMOBLEY Foundation survey does not show the front setback. | |||
| MECH | COMPLETE | 08/05/2020 | 08/06/2020 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 08/04/2020 | 08/04/2020 |
| Note: Released By: AMOBLEY | |||
| MECH | HOLD | 08/04/2020 | 08/05/2020 |
| Note: Held By: CPISCITELLI R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated. Provide Manual S or Revise calcs | |||
| URB | COMPLETE | 07/07/2020 | 07/22/2020 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 07/06/2020 | 07/09/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/06/2020 | 07/07/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/06/2020 | 07/07/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/06/2020 | 07/07/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/06/2020 | 07/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 07/06/2020 | 07/08/2020 |
| Note: Held By: CPISCITELLI Orientation of Energy Calcs and heatload does not match the site plan. Revise to match the site plan. | |||
| PLUM | COMPLETE | 07/06/2020 | 07/09/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 07/06/2020 | 07/07/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 07/06/2020 | 07/10/2020 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 07/06/2020 | 07/07/2020 |
| Note: Held By: AMOBLEY Site plan missing the front setback. Please revise site plan to show setbacks from house to all property lines |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/28/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤446.00 | 08/11/2020 |
| SITE PLAN 20 | ¤20.00 | 08/11/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/11/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/11/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/11/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 08/11/2020 |
| SEWER INSPECTION | ¤25.00 | 08/11/2020 |
| SEWER CAPITAL FACILITY | ¤2,389.36 | 08/11/2020 |
| WATER CAPITAL FACILITY FEE | ¤2,234.43 | 08/11/2020 |
| METER - DEPOSIT | ¤60.00 | 08/11/2020 |
| WATER-METER | ¤434.59 | 08/11/2020 |
| WATER-METER | ¤361.04 | 08/11/2020 |
| ADMIN FEE | ¤20.00 | 08/11/2020 |
| CONNECTION FEES | ¤25.00 | 08/11/2020 |
| BUILDING DISCOUNT 100% | (¤1,136.60) | 08/11/2020 |
| ELECTRIC FEE | ¤193.80 | 08/11/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/11/2020 |
| IMPACT FEE FIRE | ¤223.38 | 08/11/2020 |
| IMPACT FEE PARKS | ¤849.24 | 08/11/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 08/11/2020 |
| MECHANICAL FEE | ¤193.80 | 08/11/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/11/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/11/2020 |
| PLAN CHECK FEE | ¤89.20 | 08/11/2020 |
| PLUMBING FEE | ¤193.80 | 08/11/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,706.09 |