I want to search for...
Permit #2020070432
Permit Details
Status: FINAL
| Parcel Id: 35-11-31-4075-00000-00W0 |
| Block: 0 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: (386)446-6426 |
| Location Address: 46 RIO VISTA DR |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 08/05/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT DALE SOWERS |
| Owner: MARINA DEL PALMA MASTER ASSC, INC |
|
Address SUITE 300 PALM COAST, FL 32164 |
| Lot: 00W0 |
| Contracted Stated Job Value: ¤203,000.00 |
| Job Description: SITE WORK-MARINA DEL PALMA STACKHOUSE |
| Type: CN |
Contractor
S E CLINE CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 354425 PALM COAST, FL 32137 |
CGC061947 (Exp: 08/31/2028) | (386)446-6426 | (386)446-6481 |
Inspection History
| Type | Request Date | Result | Inspector |
| CLOSE OUT DOCUMENTS | 10/04/2022 | APPROVED | DRAMIREZ |
| U - UTILITY COMMERCIAL FINAL | 09/01/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 09/01/2022 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION Sod the bare earth roadway along the sidewalk parallel with the waterway and seed and straw all bare earth areas behind the Stackhouse to prevent sediment washout that is already occurring. Sec.42.52.c - (c)Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Unsodded areas shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. | |||
| MAINT BOND ACCEPTANCE (OFFICE) | 08/31/2022 | APPROVED | DRAMIREZ |
| FIRE ACCESS ROAD | 08/22/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THERE HAS NOT BEEN ANY CHANGE TO THE EMERGENCY ACCESS ROAD. I MET RANDY HOLMES THE FIRE MARSHAL OUT ON THE JOB TODAY WITH A FIRE TRUCK. THE FIRE ACCESS ROAD DOES NOT MEET THE REQUIREMENTS. YOU HAVE 10 DAYS TO HAVE THE ACCESS ROAD UP TO STANDARD.8/16/22 MET CLINE AND THE CONTRACTOR ON SITE, THEY ARE GOING TO REMOVE LOOSE DIRT AND BRING IN STONE IN AREA IN QUESTION AND PROVIDE SIGNAGE TO IDENTIFY ACCESS ROAD. SHOULD BE DONE BY END OF THE WEEK | |||
| FIRE ACCESS ROAD | 08/16/2022 | Disapproved - NO FEE | RMARTIN |
| Note: THIS IS A REINSPECTION THERE HAS NOT BEEN ANY CHANGE TO THE EMERGENCY ACCESS ROAD. I MET RANDY HOLMES THE FIRE MARSHAL OUT ON THE JOB TODAY WITH A FIRE TRUCK. THE FIRE ACCESS ROAD DOES NOT MEET THE REQUIREMENTS. YOU HAVE 10 DAYS TO HAVE THE ACCESS ROAD UP TO STANDARD.8/16/22 MET CLINE AND THE CONTRACTOR ON SITE, THEY ARE GOING TO REMOVE LOOSE DIRT AND BRING IN STONE IN AREA IN QUESTION AND PROVIDE SIGNAGE TO IDENTIFY ACCESS ROAD. SHOULD BE DONE BY END OF THE WEEK | |||
| FIRE ACCESS ROAD | 08/09/2022 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: THERE HAS NOT BEEN ANY CHANGE TO THE EMERGENCY ACCESS ROAD. I MET RANDY HOLMES THE FIRE MARSHAL OUT ON THE JOB TODAY WITH A FIRE TRUCK. THE FIRE ACCESS ROAD DOES NOT MEET THE REQUIREMENTS. YOU HAVE 10 DAYS TO HAVE THE ACCESS ROAD UP TO STANDARD. | |||
| ROW - FINAL INSPECTION | 08/09/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Sod the bare earth roadway along the sidewalk parallel with the waterway and seed and straw all bare earth areas behind the Stackhouse to prevent sediment washout that is already occurring. Sec.42.52.c - (c)Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City. Sod that is removed shall be replaced with sod of the same type. Unsodded areas shall be graded and then seeded and mulched or sodded if required by the City Engineer. The permittee is responsible for establishing a dense stand of permanent-type grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with plants of equal types and sizes. Sodding and grassing and mulching operations are to begin immediately after construction/installation has been completed. All landscape items damaged or disturbed during construction shall be replaced by the permittee at its expense, as directed by the City. Any plantings on private property damaged or disturbed by the permittee shall be replaced to the satisfaction of the City and property owner unless otherwise directed by the City Engineer. All debris shall be removed by the permittee at its expense. | |||
| BLD- ADA VEHICULAR WAY | 06/15/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 06/15/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION | |||
| BLD- ADA PARKING | 06/15/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| BLD - ADA COMPLIANT | 06/15/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION | |||
| BLD- ADA SIGNAGECONTROL | 06/15/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| LDSC-IRRIGATION FINAL | 05/20/2022 | APPROVED | JHARDING |
| LDSC- LANDSCAPE FINAL | 05/20/2022 | APPROVED | JHARDING |
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 05/16/2022 | APPROVED | JHARDING |
| BLD- ADA SIGNAGECONTROL | 05/16/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| BLD- ADA VEHICULAR WAY | 05/16/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| BLD - ADA SIGNAGE- INFOR/DIRECT | 05/16/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| BLD- ADA PARKING | 05/16/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION 5-16-22 Need the approved documents for the inspection107.3,1 | |||
| UC-ASPHALT PRE PLACEMENT | 05/16/2022 | APPROVED | JHARDING |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 05/11/2022 | APPROVED | JHARDING |
| IRRIGATION AFFIDAVIT | 05/11/2022 | APPROVED | JHARDING |
| LDSC-PRE-PLANTING TREE QUALITY | 03/29/2022 | APPROVED | JHARDING |
| BLD - ADA SIGNAGE- INFOR/DIRECT | 03/29/2022 | CANCELLED BY APPLICANT | LMILLER |
| ELECTRIC FINAL | 03/29/2022 | APPROVED | RMARTIN |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 03/29/2022 | CANCELLED BY APPLICANT | LMILLER |
| BLD- ADA PARKING | 03/29/2022 | CANCELLED BY APPLICANT | LMILLER |
| BLD- ADA SIGNAGECONTROL | 03/29/2022 | CANCELLED BY APPLICANT | LMILLER |
| BLD - ADA COMPLIANT | 03/29/2022 | CANCELLED BY APPLICANT | LMILLER |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 03/29/2022 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 03/29/2022 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 03/29/2022 | APPROVED | RMARTIN |
| BLD- ADA VEHICULAR WAY | 03/29/2022 | CANCELLED BY APPLICANT | LMILLER |
| UC-SUBSTANTIAL WALK-THRU | 03/29/2022 | APPROVED | JHARDING |
| UC- PRELIMINARY AS-BUILTS | 03/29/2022 | APPROVED | JHARDING |
| UC-FINAL SITE INSPECTION | 03/29/2022 | APPROVED | JHARDING |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 03/29/2022 | APPROVED | JHARDING |
| UROW -FINAL GRADE PRIOR SOD | 03/29/2022 | APPROVED | JHARDING |
| UROW- CURBING & GUTTER | 03/29/2022 | APPROVED | JHARDING |
| UROW - FINAL DRAINAGE | 03/29/2022 | APPROVED | JHARDING |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 03/29/2022 | APPROVED | JHARDING |
| U - SEWER TIE IN | 08/13/2021 | APPROVED | JGIBSON |
| Note: THIS WAS ALREADY APPROVED ON BUILDING PERMIT | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 08/13/2021 | APPROVED | JHARDING |
| UC-DRAINAGE STRUCT PLACMNT | 08/13/2021 | APPROVED | JHARDING |
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 08/13/2021 | APPROVED | JHARDING |
| U-WATER METER INSTALLATION/VERIFICATION | 08/13/2021 | APPROVED | JHARDING |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 08/13/2021 | APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION for the 5 idividual docks only-4in line pig | |||
| U-WATER MAIN DISINFECTION | 08/13/2021 | APPROVED | JHARDING |
| U-WATER MAIN DISINFECTION SAMPLING | 08/13/2021 | APPROVED | JHARDING |
| UC-CONSTRUCTION ENTRANCE | 08/13/2021 | APPROVED | JHARDING |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 11/16/2020 | PARTIALLY APPROVED | LFITZGERALD |
| Note: for the 5 idividual docks only-4in line pig | |||
| PLAN - PRE-CON 386-986-3750 | 09/15/2020 | APPROVED |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/09/2020 | 07/13/2020 |
| Note: Released By: PBUCKLEY | |||
| ENGIN1 | COMPLETE | 07/09/2020 | 07/09/2020 |
| Note: Released By: DLEAP | |||
| PLLA | COMPLETE | 07/09/2020 | 07/10/2020 |
| Note: Released By: BDAWSON | |||
| UD1 | COMPLETE | 07/09/2020 | 07/13/2020 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION - COMMERCIAL | ¤60.00 | 10/04/2022 |
| REINSPECTION FEE | ¤40.00 | 10/04/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/04/2022 |
| SITE PLAN 20 | ¤20.00 | 08/05/2020 |
| BUILDING DISCOUNT 100% | (¤125.00) | 08/05/2020 |
| INSPECTION 40 | ¤1,000.00 | 08/05/2020 |
| PERMIT FEE | ¤125.00 | 08/05/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,140.00 |